FUTURE
 OFFSHORE
 FOUNDATIONS
 Cost-effectively delivering foundations for
 use in deeper water with bigger turbines
With wind farms moving into new water depths with challenging soil
conditions & bigger turbines, big questions are being raised about foundations
needs & which solutions are going to be the most applicable whilst bringing
down costs. Take 2 days out of the office to gain key insights into:
• How monopile designs can be adjusted to make them suitable for new projects                           PLUS!
• Where & when jackets, gravity-base foundations or tripods will be most suitable
                                                                                                        Substations Focus Day On 15 November
• Industrialising the manufacture, logistics & installation of all solutions to bring down the
  cost of energy
                                                                                                        Assess methods for
• How to best inspect & maintain new & existing foundations once installed to ensure                    installation, engineering &
  they last the full lifetime of the project                                                            maintenance of offshore
PLUS! Hear the latest from innovative demo projects Windfloat & Twisted Jackets                         substations for future projects


13-14 November 2012                                                                                   Swissôtel Bremen, Germany

Kasper Roed Jensen,                                  Phil de Villiers,
Team Lead Offshore Structural & Civil Engineering,   Offshore Wind Accelerator Manager,
Vattenfall                                           The Carbon Trust
Marc Seidel,                                         Thomas Arensbach,
Leading Expert Offshore Engineering,                 Head of Offshore Projects UK,
Repower Systems SE                                   Siemens Wind Power
                                                                                                        Book Before 27 September &
                                                     Kai Irschik,
João Goncalo Maciel, Technology
Development Director,                                Turbine Engineering, Head of Loads Department,     Save up to £450!
EDP Inovação & Project Director,                     AREVA Wind GmbH
Windfloat                                            Per Sparrevik,
                                                     Expert Adviser - Discipline Leader Subsea
James Lowe,                                          Technology,
Engineering Manager,
                                                     Norwegian Geotechnical
Mainstream Renewable
                                                     Institute (NGI)
Power
                                                     Danny Bonnett,
Isaac Tavares,                                       Lead Structural Engineer,
Project Manager,                                                                                      Sponsored By:
                                                     RES Offshore
Centrica & RES Offshore
                                                     Bernard van Hemert,
Julian Garnsey,                                      Technical Project Manager,
Head of Offshore Civil Engineering,
                                                     Typhoon Offshore
RWE Innogy

  DON’T MISS! Post-Forum Master Class On 15 November
  Building robust logistics strategies for foundations from the manufacture
  plant to the project site to reduce installation timelines & cost


www.futurewindfoundations.com
Cost-effectively delivering foundations
for use in deeper water with bigger turbines
Day 1        Tuesday, 13 November

08.30   Registration & Morning Coffee                                            Gain insight into two ambitious industry initiatives:
                                                                                 • SLIC - a project to provide improved fatigue design
09.10   Chair’s Opening Remarks                                                    methods for offshore wind turbine substructures
        Marc Seidel, Leading Expert Offshore Engineering,                        • PISA - a project to strengthen understanding of soil-
        REpower                                                                    structure interaction to allow improved pile design methods

09.15   How Can Monopile Designs Be                                      11.25   Are Suction Cans A Suitable
        Adjusted For Use In Deeper Water &                                       Foundation For Germany?
                                                                                 Ernest Diepstraten, General Manager,
        With Bigger Turbines?                                                    Cathie Associates SA/NV
        Kasper Roed Jensen, Team Lead Offshore Structural & Civil
                                                                                 • Experience gained using suctions cans thus far outside of
        Engineering, Vattenfall
                                                                                   German waters
        • How will designs be adapted for use in water of 40m+?
                                                                                   - recent experience in Germany
          - how wide would the pile diameter need to be?
                                                                                 • Implications on design of suction cans following DIN
          - could these monopiles ever cope with increased loads
                                                                                 • Assessing the sequence for a successful integrated
              from deeper water & large 6MW+ turbines & how?
        • Cost modelling for using monopiles on sites currently                    design
          pencilled in as jackets                                                • Do’s and don’ts
          - could mixing foundation types on sites where                           - recommendations for future projects
              monopiles are not right for the whole project bring
              costs down & how would that work practically?              11.55   Critically Evaluating The Use Of
        • Which solutions for grouted connections are the most                   Jackets To Ensure They Are The Right
          effective & economically sound & why?
          - what new solutions will be needed as loads increase?                 Choice For Your Projects
                                                                                 • When does it make sense to move to jackets?
                                                                                 • Why are different jacket designs being chosen?
09.45   Met Mast Dynamic Response Focus:                                           - what are the reasons against using 4-legged
        Integrated Analysis & Component                                               structures?
        Analysis For Current & Future Projects                                   • How will jackets cope with the loading effects associated
        Danny Bonnett, Lead Structural Engineer,                                   with wind that aren’t present in oil & gas?
        RES Offshore                                                             • Grouted connections
        • Serviceability criteria                                                  - what did we learn from monopile & TP failures?
          - assessing the compromise between good quality data                     - how can we avoid similar issues for grouted
             & an economic structure                                                  connections on jacket foundations?
        • How do you determine foundation stiffness requirements?                • Assessing the cost structure of jacket foundations
          - platform deflection, tip deflection & rotational stiffness
        • Analysis of lattice towers for fatigue                          To join this session please contact Heather on
          - appropriate S-N curves                                        hs@windpowermonthly.com or +44 (0)20 8267 4785
        • Water depth limitations for monopile structures
          - is it really about effective depth?
                                                                         12.35   Networking Lunch
        • Assessment of fatigue damage of in-service structures
        • What are the alternatives to a permanent structure?
                                                                         13.35   Innovative ‘Twisted Jacket’ Demo
10.15   Morning Refreshments & Networking Break                                  Project Update
                                                                                 James Lowe, Engineering Manager,
10.45   Exploring Industry Research Projects For                                 Mainstream Renewable Power
        Design Of Piled Steel Sub-Structures                                     Gain an update from the Twisted Jacket demo project
        Julian Garnsey, Head of Offshore Civil Engineering,                      currently being run by Mainstream Renewable Power to find
        RWE Innogy                                                               out:
        Isaac Tavares, Project Manager,                                          • Has the prototype performed to its design criteria in terms
        Centrica                                                                   of how the structure would cope with the loads?
        Alastair Muir Wood, Geotechnical Engineer,                               • Did the installation take place as expected?
        DONG Energy                                                              • What challenges have been faced so far
        Hear about the latest research initiatives aimed at providing            • Will any design changes be made as a result of the
        new data & design guidance to allow improved design                        demonstration & why?
        methodology & life extension for offshore wind turbine                   • What are the cost projections for large 6MW+ turbines?
        foundations. In combination these projects will bring
        significant economic savings & benefits to both existing &
        future wind turbine foundations.




                     Book Now! Visit www.futurewindfoundations.com
Day 2        Wednesday, 14 November

14.20   Exploring The Case Of The Tripod As                              08.30   Delegate Sign-In & Morning Coffee
        A Proven Foundation Concept &
                                                                         09.10   Chair’s Opening Remarks
        Assessing Its Operational Benefits                                       Thomas Arensbach, Head of Offshore Projects UK,
        Kai Irschik, Turbine Engineering, Head of Loads Department,              Siemens Wind Power
        AREVA Wind GmbH
        • The standard tripod as a proven technology
          - what are the benefits of a tripod design compared to         09.15   Update To Determine The Current
              other solutions?                                                   Status Of The Winning Foundations
        • Operational experience from Alpha Ventus
          - what makes the tripod a robust & easy design?                        Designs From The Offshore Wind
          - lessons learned                                                      Accelerator (OWA)
          - accessibility                                                        Phil de Villiers, Offshore Wind Accelerator Manager,
          - inspection                                                           The Carbon Trust
          - maintenance                                                          The results of the OWA competition were announced in
          - scour                                                                September 2011, but where are we now? Gain an update
        • What alternative tripod versions have been investigated &              from The Carbon Trust around:
          where do they fit better than the original design?                     • How close are the different winners to commercialisation
                                                                                    of their designs?
15.00   Assessing The Validity Of Concrete                                       • Which have received certification?
        Gravity-Base Foundations At Large-                                       • How far has each concept progressed through lab &
        Scale Project Level                                                         field tests?
        Petter J. Karal, Chief Executive Officer,                                • Where specifically do the designers see them being
        Seatower                                                                    applicable?
        • Understanding the full costs of gravity-base foundations               • How cost-effective is each design compared with others?
          - in what circumstances can they be as or more                         • Are there planned demo site installations & when will they be?
              competitive to other types of foundations?                         • What are the projected manufacturing & installation costs?
        • What are the restrictions to using gravity-base?
        • What are the expectations around manufacturing volumes         09.50   Foundation Choice Case Study:
          & timelines?
        • Effective seabed preparation                                           Exploring The Decision-Making
          - understanding the necessary considerations at the site               Process For The Gemini Project
              to ensure it is flat enough                                        Bernard van Hemert, Technical Project Manager,
        • What are the long-term issues over the lifetime?                       Typhoon Offshore
        • What are the differences between the different types of                • Summary of site conditions for the project
          gravity-base foundations?                                              • Our search for the most optimal foundation type for our
        • Timescales & methods for installation                                    4MW turbines from three-legged jacket to four-legged
          - what is the financial impact of not needing heavy lift                 jacket to monopile
              equipment at the installation site?                                • Exploring how installation limitations affected our choice to
        • What are the weather requirements regarding weather
                                                                                   use monopiles
          windows & wave conditions for installation of gravity
                                                                                   - costs, installation vessels, etc.
          foundations?
                                                                                 • How did we design the monopiles without having all the
          - how does this affect the projects in terms of cost & risk?
                                                                                   detailed geotechnical information?
15.40   Refreshments & Networking Break                                            - cyclic approach
                                                                                   - preliminary results
16.10   Innovative Floating Foundations:                                         • Overcoming the challenge of grouted connection vs.
        The Windfloat Case Study                                                   flanged connection
        João Goncalo Maciel, Technology Development Director,                      - CAPEX & OPEX
        EDP Inovação & Project Director                                            - risks in certification
        Windfloat                                                                  - risks during installation
        • Main design considerations of the Windfloat                              - risks during lifetime operation
          - how is Windfloat behaving compared to on paper?
        • How does the structure behave once in the water?               10.30   Refreshments & Networking Break
          - how is the turbine performing?
        • Understanding the interaction between the turbine & the
          foundation structure
        • Operations & maintenance needs
        • Cost analysis
16.55   Close Of Day 1 & Networking Drinks Reception



                                    Book Now! Call +44 (0)20 8267 4011
Cost-effectively delivering foundations
for use in deeper water with bigger turbines
Day 2        Wednesday, 14 November

11.05   Assessing Fabrication Processes To                                            -   what are the limitations of the cranes?
                                                                                      -   how will vessel designs need to be bespoke to each
        Ensure Delivery Of The Numbers Of                                                 different kind of jacket, monopile or gravity-base
        Foundations Needed For Near-Future                                                foundation?
                                                                                    • Dealing with bottlenecks in available jack-up vessels
        Projects                                                                      - how will project CAPEX be affected?
        • How much will fabrication of the different concepts cost?
                                                                                    • Installing foundations from floating vessels
        • What needs to be adapted in the fabrication process for
                                                                                      - which concepts will floating vessels work for?
          each concept for serial production
                                                                                      - which floating vessels can cope with installing
          - which concept is easiest to fabricate on such a scale?
                                                                                          foundations in harsher conditions such as those on the
          - is there scope for automation of production to bring
                                                                                          North Sea?
              down costs?
          - timescales
        • Is the suggestion of 100 jackets per year realistic?
                                                                            14.45   Is Underwater Noise A 'Show
        • Quality control in manufacturing                                          Stopper'? Noise Mitigation, Trends For
          - what guidelines or standards should be in place to                      Pile Installation & What It Means For
              increase reliability?
                                                                                    The Industry
11.45   Building Robust Logistics Plans To Ensure                                   Nils Raab, Sales Manager – Wind, MENCK
                                                                                    • Assessing why noise is such an issue
        Large Volumes Of Foundations Can Be                                           - the impact of regulation & the environment on offshore
        Moved Smoothly From Fabrication Sites                                             wind installation
                                                                                    • The Resonance Chamber
        To The Installation Sites                                                     - understanding how noise emission varies in different
        Martin Huss, Managing Director, A2SEA
                                                                                          foundation types
        • What are the transport needs for moving the different types
                                                                                      - improving noise calculation & simulation for better
          of foundations from the manufacturing plant to the
                                                                                          designs & installation methods
          installation site?
                                                                                    • Exploring the latest underwater noise reduction methods
          - getting foundations to the port
          - moving from the shore to the project site                       15.25   Refreshments & Networking Break
        • With huge volumes of foundations, how will ports cope?
          - what facilities will be needed at the quayside?                 15.55   Protecting Against Corrosion Across
          - storage options
          - when would you need to have a feed-in port?
                                                                                    The Different Foundation Concepts
                                                                                    Isaac Tavares, Project Manager, RES Offshore
12.25   Networking Lunch                                                            • External corrosion protection
                                                                                      - what must designers consider to ensure protection is
13.25   Turbine & Foundation Installation                                                not damaged by vessels being used later in the project?
                                                                                    • Dealing with internal corrosion of monopiles
        Strategy: Full Structure Installation Vs.                                     - what methods are available to repair corrosion on
        Split Structure Installation                                                     existing monopiles that wasn’t anticipated?
        Mark Reinders, Technical Project Manager,                                     - using corrosion & inhibitors to avoid internal corrosion
        Siemens Wind Power                                                               on future monopiles
        • Fictive project case study describing overall project
          installation & commissioning methodologies & timeline             16.05   Understanding The Long-Term
        • Comparison of the cash flow for full structure installation vs.
          split structure installation
                                                                                    Behaviour Of Foundations Used For
          - when is revenue generated?                                              25m+ Water Depth To Effectively Plan
          - what are the effects of timing of investments?                          Inspection & Maintenance
        • Suggestions for future development from a turbine                         Per Sparrevik, Expert Adviser - Discipline Leader Subsea
          manufacturers point of view                                               Technology, Norwegian Geotechnical Institute (NGI)
          - what types of vessels do Siemens Wind Power see the                     • Once each of the concepts is in the water what
              need for?                                                               particularly needs to be monitored?
          - what should future foundation installation strategies look                - fatigue
              like?                                                                   - how soil is performing against what was predicted
                                                                                      - corrosion
14.05   Vessels Focus: Assessing Which                                              • Inspection techniques
        Vessels Will Be Available, What Their                                         - what tools are available & work best
                                                                                      - what are the extra costs involved?
        Capabilities & Costs Are                                                    • What are the latest ideas regarding repair of foundations?
        Paal Strømstad, Project Manager, Ingenium Ventus
                                                                                    • Establishing how higher loads from bigger turbines will
        • What will the vessel needs be for new foundations?
                                                                                      affect the life-time performance of different foundations
          - finding vessels & cranes that can carry the weight of
             foundations for larger turbines                                16.45   Chair’s Closing Remarks & Close Of Forum


                      Book Now! Visit www.futurewindfoundations.com
Thursday, 15 November 2012

Building Robust Logistics
For Installing Foundations For
Future Offshore Wind Projects

Separately Bookable Master Class

Led by: Keith Miller, Chairman, FoundOcean                                    Storage
                                                                              • as projects get bigger how can you ensure you have enough
09.00-12.30 (Registration begins at 08.30)
                                                                                space for foundation storage?
As future rounds of offshore projects increase the numbers of                   - how should you most affectively lay foundations in the load-out
foundations & other components needed for projects, efficient                     area to aid transfer to installation vessels?
organisation of the logistics from the assembly hubs to the site              • are there currently ports that can store hundreds of structures?
becomes essential to avoid delays & save money. Join Windpower                • will there be enough room for future vessels to moor?
Monthly for this in-depth morning master class to gain practical &
strategic tools on how to put together your logistics programmes.
                                                                              Transport to site
During this highly interactive peer-to-peer experience                        • How much can of the foundation assembly can be done onshore?
exchange the following will be addressed:                                       - how will this affect moving foundations from the storage areas to
                                                                                  the vessel deck?
Fabrication logistics                                                         • impacts on installation timeframes
                                                                              • Vessel requirements & availability
• Finding the right locations for assembly hubs
                                                                                - how much deck space do you need?
  - facilities needed
                                                                              • efficient packing
• space
                                                                                - load capacities
• proximity to shore
                                                                                - how will vessel be developed to guarantee the kind of flexibility
• Avoiding the need to transfer foundations between various vehicles
                                                                                  needed to increase the efficiency of installation?
  to get them to the load out site




 AWARD-WINNING WINDPOWER MONTHLY EVENTS!
 We are proud to have been listed as “Highly Commended” for the Best Energy Conference 2012 award, and shortlisted for the Best New Conference
 Launch award. This year’s Conference Awards is the first time Windpower Monthly Events have entered and we are delighted to have received such
 recognition from the industry for the quality of our events.
 Here are some upcoming events you may be interested in:


 Offshore Operations & Maintenance                                            Wind Connect
 9-10 October 2012, London, UK                                                23 January 2013, London, UK
 www.offshoremaintenanceforum.com                                             www.windconnectevent.com


 Wind LATAM - Brazil                                                          Wind Resource Assessment 2013
 26-28 November 2012, Sao Paolo, Brazil                                       27-28 March 2013, London, UK
 www.windlatam.com                                                            www.windresourceassessmentforum.com


 WindLift Onshore & Offshore                                                  Vessels & Access 2013
 27-28 November 2012, London, UK                                              May 2013, London, UK
 www.windliftevent.com                                                        www.offshorevesselsforum.com




                                    Book Now! Call +44 (0)20 8267 4011
Cost-effectively delivering foundations
   for use in deeper water with bigger turbines
  Thursday, 15 November 2012

Offshore Substation Design,
Installation & Maintenance

Separately Bookable Focus Day

Due to popular demand Windpower Monthly will be hosting an             • How big substations are going to need to be to cater for new
Offshore Substations Focus Day on 15 November.                           HVDC equipment
                                                                       • Should new substations be taken out on vessels or floated out to
The day will explore key issues regarding substation design,
                                                                         the site?
installation and maintenance affecting projects in deeper water and
                                                                       • Best-practice corrosion protection
with large numbers of turbines.
                                                                       • What considerations need to be made for fire protection and
10.00-16.00 (Registration begins at 09.30)                               suppression?

By attending just one day you will find out about:                     Who should attend?
• Design considerations for substations in deeper water and for        This event is a must-attend for civil & structural engineers working on
  larger projects                                                      substation design, installation and maintenance.
  – exploring the latest standards
                                                                       The agenda for this focus day is still in development so keep an eye
• Economically installing topsides with much higher weights than
                                                                       on www.offshorewindsubstations.com for updates.
  previously known
  – what vessels and lifting tools are available?                      Companies we are inviting to speak include DONG Energy,
  – how long will they take to install?                                Centrica, RWE, DNV & RES Offshore.
  – what will be the cost of installation?
  – self installing vs. traditional installation techniques
  – foundation needs

    Feedback From past attendees




  “
               Very good event, well



                                                                “
                                                                      This event allowed/forced like-minded individuals
               organised and attended.”                               across race, gender and generation to openly share
               Technical Director,                                    in a small group setting through short sound bite
               Submarine Technology Ltd                               topics. Great job! People were here until the very
                                                                      end, what a compliment! Your entire team was




  “
               Great opportunity for                                  engaging, kind, supportive and competent.”
               networking, and keeping up                             Senior Vice President EHS,
               with innovations.”                                     PCG Wind
               International Project Management,




                                                                “
               Availon Inc                                            This conference was very informative
                                                                      and a great place to network.”
  Media Partners:                                                     National Co-ordinator,
                                                                      Elevator Industry Work Fund



  Sponsored By:




                         Book Now! Visit www.futurewindfoundations.com
Get Involved




                                                                                          WHo sHould attend?
                                                                                           Directors, Heads, Managers of:
                                            1                   2                           Foundations/Structures
                                                                          3
                                                                                  4
                                                                                            Civil Engineering
                                10                                                          Structural Engineering
                                           9
                                                                                            Installation
                                                                                  5
                                                                                            OM
                                                       8                                    Technical/Technology
                                                                              6
                                                                                            Project
         Available*                                             7
         contact hs@windpowermonthly.com                                                    Site
         Reserved*                                                                          Procurement
*Correct at time of printing                                                                Business Development



    WHo WIll You meet?
 SENIOR LEVEL ATTENDEES
                                                22% Manager               INDUSTRY BREAKDOWN
                                                                                                       23% Engineer
                                                22% Engineer                                           16% OEM
                                                10% Director                                           13% Consultant
                                                14% C-Level                                             11% Finance/Investment
                                                 11% Consultant                                        10% Developer
                                                  7% Finance/Investment                                 9% Other
                                                  5% Project Manager                                     5% Govt
                                                  1% Academic/Other                                      3% Utilitiy

                                           Book Now! Call +44 (0)20 8267 4011
FEATURING SPEAKERS FROM:




                                                                                  Book Before 27 September  Save Up To £450!

FUTURE                                                                                                                           Book before
                                                                                                                                   27 Sept
                                                                                                                                      £1300
                                                                                                                                                      Book before
                                                                                                                                                        26 Oct
                                                                                                                                                          £1400
                                                                                                                                                                            Book after
                                                                                                                                                                             26 Oct
                                                                                                                                                                                £1500

OFFSHORE                                                                           Two-Day Forum Only                                Saving
                                                                                                                                      £200
                                                                                                                                                          Saving
                                                                                                                                                           £100
                                                                                                                                                                                Saving
                                                                                                                                                                                   –


FOUNDATIONS
                                                                                                                                     £1549                £1649                 £1749
                                                                                   Two-Day Forum +
                                                                                   Logistics Master Class                            Saving               Saving                Saving
                                                                                                                                      £450                 £350                  £250
                                                                                                                                      £1749               £1849                 £1949
                                                                                   Two-Day Forum +
Cost-effectively delivering foundations for                                        Substations Focus Day                             Saving               Saving                Saving
                                                                                                                                      £200                 £100                    –
use in deeper water with bigger turbines                                                                                              £549                 £599                  £649
A Two-Day Forum Plus Half-Day Master Class/Focus Day:                              Substations Focus Day Only                        Saving               Saving                Saving
                                                                                                                                      £100                 £50                     –
13-15 November 2012, Bremen, Germany
                                                                                   Additional options                                                     Details*
                                                                                   Logistics Master Class Only                                              £449

3 WAYS TO BOOK                                                                     Speaker Notes                                                      £199 (No VAT)

                                                                                 *All rates will have VAT @ 19% added
1. Online: www.futurewindfoundations.com                                         ** vs booking items seperately at standard prices

                                                                                 Further Information For Delegates
2. Email: events@windpowermonthly.com                                            Email events@windpowermonthly.com

3. Call: +44 (0)20 8267 4011                                                      Let Us Manage Your Event For You
                                                                                  Haymarket Events organises a variety of event formats on behalf of third-parties, including
                                                                                  associations, not-for-profit organisations, the public sector and corporate clients. We work to the
                                                                                  client’s objectives to produce dynamic events that deliver exceptional results. For more information,
Full Terms  Conditions available online at time of booking                       please contact Barney Roe on +44 (0)20 8267 4063 or email barney.roe@haymarket.com.



                                                                               www.futurewindfoundations.com
Sponsorship, Exhibition  Business Development Opportunities
Don’t miss out on this great opportunity to increase your exposure amongst     Conference Code: 17181111587
decision-makers looking into foundations solutions  enjoy face-to-face time
with potential customers; contact Heather Smith on +44 (0) 20 8267 4785 or     Brochure code: WEB
email hs@windpowermonthly.com today.                                                                                                     Foundations for Future Offshore Wind
                                                                                                                                         is produced by Haymarket Conferences

Future Offshore Foundations Web

  • 1.
    FUTURE OFFSHORE FOUNDATIONS Cost-effectively delivering foundations for use in deeper water with bigger turbines With wind farms moving into new water depths with challenging soil conditions & bigger turbines, big questions are being raised about foundations needs & which solutions are going to be the most applicable whilst bringing down costs. Take 2 days out of the office to gain key insights into: • How monopile designs can be adjusted to make them suitable for new projects PLUS! • Where & when jackets, gravity-base foundations or tripods will be most suitable Substations Focus Day On 15 November • Industrialising the manufacture, logistics & installation of all solutions to bring down the cost of energy Assess methods for • How to best inspect & maintain new & existing foundations once installed to ensure installation, engineering & they last the full lifetime of the project maintenance of offshore PLUS! Hear the latest from innovative demo projects Windfloat & Twisted Jackets substations for future projects 13-14 November 2012 Swissôtel Bremen, Germany Kasper Roed Jensen, Phil de Villiers, Team Lead Offshore Structural & Civil Engineering, Offshore Wind Accelerator Manager, Vattenfall The Carbon Trust Marc Seidel, Thomas Arensbach, Leading Expert Offshore Engineering, Head of Offshore Projects UK, Repower Systems SE Siemens Wind Power Book Before 27 September & Kai Irschik, João Goncalo Maciel, Technology Development Director, Turbine Engineering, Head of Loads Department, Save up to £450! EDP Inovação & Project Director, AREVA Wind GmbH Windfloat Per Sparrevik, Expert Adviser - Discipline Leader Subsea James Lowe, Technology, Engineering Manager, Norwegian Geotechnical Mainstream Renewable Institute (NGI) Power Danny Bonnett, Isaac Tavares, Lead Structural Engineer, Project Manager, Sponsored By: RES Offshore Centrica & RES Offshore Bernard van Hemert, Julian Garnsey, Technical Project Manager, Head of Offshore Civil Engineering, Typhoon Offshore RWE Innogy DON’T MISS! Post-Forum Master Class On 15 November Building robust logistics strategies for foundations from the manufacture plant to the project site to reduce installation timelines & cost www.futurewindfoundations.com
  • 2.
    Cost-effectively delivering foundations foruse in deeper water with bigger turbines Day 1 Tuesday, 13 November 08.30 Registration & Morning Coffee Gain insight into two ambitious industry initiatives: • SLIC - a project to provide improved fatigue design 09.10 Chair’s Opening Remarks methods for offshore wind turbine substructures Marc Seidel, Leading Expert Offshore Engineering, • PISA - a project to strengthen understanding of soil- REpower structure interaction to allow improved pile design methods 09.15 How Can Monopile Designs Be 11.25 Are Suction Cans A Suitable Adjusted For Use In Deeper Water & Foundation For Germany? Ernest Diepstraten, General Manager, With Bigger Turbines? Cathie Associates SA/NV Kasper Roed Jensen, Team Lead Offshore Structural & Civil • Experience gained using suctions cans thus far outside of Engineering, Vattenfall German waters • How will designs be adapted for use in water of 40m+? - recent experience in Germany - how wide would the pile diameter need to be? • Implications on design of suction cans following DIN - could these monopiles ever cope with increased loads • Assessing the sequence for a successful integrated from deeper water & large 6MW+ turbines & how? • Cost modelling for using monopiles on sites currently design pencilled in as jackets • Do’s and don’ts - could mixing foundation types on sites where - recommendations for future projects monopiles are not right for the whole project bring costs down & how would that work practically? 11.55 Critically Evaluating The Use Of • Which solutions for grouted connections are the most Jackets To Ensure They Are The Right effective & economically sound & why? - what new solutions will be needed as loads increase? Choice For Your Projects • When does it make sense to move to jackets? • Why are different jacket designs being chosen? 09.45 Met Mast Dynamic Response Focus: - what are the reasons against using 4-legged Integrated Analysis & Component structures? Analysis For Current & Future Projects • How will jackets cope with the loading effects associated Danny Bonnett, Lead Structural Engineer, with wind that aren’t present in oil & gas? RES Offshore • Grouted connections • Serviceability criteria - what did we learn from monopile & TP failures? - assessing the compromise between good quality data - how can we avoid similar issues for grouted & an economic structure connections on jacket foundations? • How do you determine foundation stiffness requirements? • Assessing the cost structure of jacket foundations - platform deflection, tip deflection & rotational stiffness • Analysis of lattice towers for fatigue To join this session please contact Heather on - appropriate S-N curves hs@windpowermonthly.com or +44 (0)20 8267 4785 • Water depth limitations for monopile structures - is it really about effective depth? 12.35 Networking Lunch • Assessment of fatigue damage of in-service structures • What are the alternatives to a permanent structure? 13.35 Innovative ‘Twisted Jacket’ Demo 10.15 Morning Refreshments & Networking Break Project Update James Lowe, Engineering Manager, 10.45 Exploring Industry Research Projects For Mainstream Renewable Power Design Of Piled Steel Sub-Structures Gain an update from the Twisted Jacket demo project Julian Garnsey, Head of Offshore Civil Engineering, currently being run by Mainstream Renewable Power to find RWE Innogy out: Isaac Tavares, Project Manager, • Has the prototype performed to its design criteria in terms Centrica of how the structure would cope with the loads? Alastair Muir Wood, Geotechnical Engineer, • Did the installation take place as expected? DONG Energy • What challenges have been faced so far Hear about the latest research initiatives aimed at providing • Will any design changes be made as a result of the new data & design guidance to allow improved design demonstration & why? methodology & life extension for offshore wind turbine • What are the cost projections for large 6MW+ turbines? foundations. In combination these projects will bring significant economic savings & benefits to both existing & future wind turbine foundations. Book Now! Visit www.futurewindfoundations.com
  • 3.
    Day 2 Wednesday, 14 November 14.20 Exploring The Case Of The Tripod As 08.30 Delegate Sign-In & Morning Coffee A Proven Foundation Concept & 09.10 Chair’s Opening Remarks Assessing Its Operational Benefits Thomas Arensbach, Head of Offshore Projects UK, Kai Irschik, Turbine Engineering, Head of Loads Department, Siemens Wind Power AREVA Wind GmbH • The standard tripod as a proven technology - what are the benefits of a tripod design compared to 09.15 Update To Determine The Current other solutions? Status Of The Winning Foundations • Operational experience from Alpha Ventus - what makes the tripod a robust & easy design? Designs From The Offshore Wind - lessons learned Accelerator (OWA) - accessibility Phil de Villiers, Offshore Wind Accelerator Manager, - inspection The Carbon Trust - maintenance The results of the OWA competition were announced in - scour September 2011, but where are we now? Gain an update • What alternative tripod versions have been investigated & from The Carbon Trust around: where do they fit better than the original design? • How close are the different winners to commercialisation of their designs? 15.00 Assessing The Validity Of Concrete • Which have received certification? Gravity-Base Foundations At Large- • How far has each concept progressed through lab & Scale Project Level field tests? Petter J. Karal, Chief Executive Officer, • Where specifically do the designers see them being Seatower applicable? • Understanding the full costs of gravity-base foundations • How cost-effective is each design compared with others? - in what circumstances can they be as or more • Are there planned demo site installations & when will they be? competitive to other types of foundations? • What are the projected manufacturing & installation costs? • What are the restrictions to using gravity-base? • What are the expectations around manufacturing volumes 09.50 Foundation Choice Case Study: & timelines? • Effective seabed preparation Exploring The Decision-Making - understanding the necessary considerations at the site Process For The Gemini Project to ensure it is flat enough Bernard van Hemert, Technical Project Manager, • What are the long-term issues over the lifetime? Typhoon Offshore • What are the differences between the different types of • Summary of site conditions for the project gravity-base foundations? • Our search for the most optimal foundation type for our • Timescales & methods for installation 4MW turbines from three-legged jacket to four-legged - what is the financial impact of not needing heavy lift jacket to monopile equipment at the installation site? • Exploring how installation limitations affected our choice to • What are the weather requirements regarding weather use monopiles windows & wave conditions for installation of gravity - costs, installation vessels, etc. foundations? • How did we design the monopiles without having all the - how does this affect the projects in terms of cost & risk? detailed geotechnical information? 15.40 Refreshments & Networking Break - cyclic approach - preliminary results 16.10 Innovative Floating Foundations: • Overcoming the challenge of grouted connection vs. The Windfloat Case Study flanged connection João Goncalo Maciel, Technology Development Director, - CAPEX & OPEX EDP Inovação & Project Director - risks in certification Windfloat - risks during installation • Main design considerations of the Windfloat - risks during lifetime operation - how is Windfloat behaving compared to on paper? • How does the structure behave once in the water? 10.30 Refreshments & Networking Break - how is the turbine performing? • Understanding the interaction between the turbine & the foundation structure • Operations & maintenance needs • Cost analysis 16.55 Close Of Day 1 & Networking Drinks Reception Book Now! Call +44 (0)20 8267 4011
  • 4.
    Cost-effectively delivering foundations foruse in deeper water with bigger turbines Day 2 Wednesday, 14 November 11.05 Assessing Fabrication Processes To - what are the limitations of the cranes? - how will vessel designs need to be bespoke to each Ensure Delivery Of The Numbers Of different kind of jacket, monopile or gravity-base Foundations Needed For Near-Future foundation? • Dealing with bottlenecks in available jack-up vessels Projects - how will project CAPEX be affected? • How much will fabrication of the different concepts cost? • Installing foundations from floating vessels • What needs to be adapted in the fabrication process for - which concepts will floating vessels work for? each concept for serial production - which floating vessels can cope with installing - which concept is easiest to fabricate on such a scale? foundations in harsher conditions such as those on the - is there scope for automation of production to bring North Sea? down costs? - timescales • Is the suggestion of 100 jackets per year realistic? 14.45 Is Underwater Noise A 'Show • Quality control in manufacturing Stopper'? Noise Mitigation, Trends For - what guidelines or standards should be in place to Pile Installation & What It Means For increase reliability? The Industry 11.45 Building Robust Logistics Plans To Ensure Nils Raab, Sales Manager – Wind, MENCK • Assessing why noise is such an issue Large Volumes Of Foundations Can Be - the impact of regulation & the environment on offshore Moved Smoothly From Fabrication Sites wind installation • The Resonance Chamber To The Installation Sites - understanding how noise emission varies in different Martin Huss, Managing Director, A2SEA foundation types • What are the transport needs for moving the different types - improving noise calculation & simulation for better of foundations from the manufacturing plant to the designs & installation methods installation site? • Exploring the latest underwater noise reduction methods - getting foundations to the port - moving from the shore to the project site 15.25 Refreshments & Networking Break • With huge volumes of foundations, how will ports cope? - what facilities will be needed at the quayside? 15.55 Protecting Against Corrosion Across - storage options - when would you need to have a feed-in port? The Different Foundation Concepts Isaac Tavares, Project Manager, RES Offshore 12.25 Networking Lunch • External corrosion protection - what must designers consider to ensure protection is 13.25 Turbine & Foundation Installation not damaged by vessels being used later in the project? • Dealing with internal corrosion of monopiles Strategy: Full Structure Installation Vs. - what methods are available to repair corrosion on Split Structure Installation existing monopiles that wasn’t anticipated? Mark Reinders, Technical Project Manager, - using corrosion & inhibitors to avoid internal corrosion Siemens Wind Power on future monopiles • Fictive project case study describing overall project installation & commissioning methodologies & timeline 16.05 Understanding The Long-Term • Comparison of the cash flow for full structure installation vs. split structure installation Behaviour Of Foundations Used For - when is revenue generated? 25m+ Water Depth To Effectively Plan - what are the effects of timing of investments? Inspection & Maintenance • Suggestions for future development from a turbine Per Sparrevik, Expert Adviser - Discipline Leader Subsea manufacturers point of view Technology, Norwegian Geotechnical Institute (NGI) - what types of vessels do Siemens Wind Power see the • Once each of the concepts is in the water what need for? particularly needs to be monitored? - what should future foundation installation strategies look - fatigue like? - how soil is performing against what was predicted - corrosion 14.05 Vessels Focus: Assessing Which • Inspection techniques Vessels Will Be Available, What Their - what tools are available & work best - what are the extra costs involved? Capabilities & Costs Are • What are the latest ideas regarding repair of foundations? Paal Strømstad, Project Manager, Ingenium Ventus • Establishing how higher loads from bigger turbines will • What will the vessel needs be for new foundations? affect the life-time performance of different foundations - finding vessels & cranes that can carry the weight of foundations for larger turbines 16.45 Chair’s Closing Remarks & Close Of Forum Book Now! Visit www.futurewindfoundations.com
  • 5.
    Thursday, 15 November2012 Building Robust Logistics For Installing Foundations For Future Offshore Wind Projects Separately Bookable Master Class Led by: Keith Miller, Chairman, FoundOcean Storage • as projects get bigger how can you ensure you have enough 09.00-12.30 (Registration begins at 08.30) space for foundation storage? As future rounds of offshore projects increase the numbers of - how should you most affectively lay foundations in the load-out foundations & other components needed for projects, efficient area to aid transfer to installation vessels? organisation of the logistics from the assembly hubs to the site • are there currently ports that can store hundreds of structures? becomes essential to avoid delays & save money. Join Windpower • will there be enough room for future vessels to moor? Monthly for this in-depth morning master class to gain practical & strategic tools on how to put together your logistics programmes. Transport to site During this highly interactive peer-to-peer experience • How much can of the foundation assembly can be done onshore? exchange the following will be addressed: - how will this affect moving foundations from the storage areas to the vessel deck? Fabrication logistics • impacts on installation timeframes • Vessel requirements & availability • Finding the right locations for assembly hubs - how much deck space do you need? - facilities needed • efficient packing • space - load capacities • proximity to shore - how will vessel be developed to guarantee the kind of flexibility • Avoiding the need to transfer foundations between various vehicles needed to increase the efficiency of installation? to get them to the load out site AWARD-WINNING WINDPOWER MONTHLY EVENTS! We are proud to have been listed as “Highly Commended” for the Best Energy Conference 2012 award, and shortlisted for the Best New Conference Launch award. This year’s Conference Awards is the first time Windpower Monthly Events have entered and we are delighted to have received such recognition from the industry for the quality of our events. Here are some upcoming events you may be interested in: Offshore Operations & Maintenance Wind Connect 9-10 October 2012, London, UK 23 January 2013, London, UK www.offshoremaintenanceforum.com www.windconnectevent.com Wind LATAM - Brazil Wind Resource Assessment 2013 26-28 November 2012, Sao Paolo, Brazil 27-28 March 2013, London, UK www.windlatam.com www.windresourceassessmentforum.com WindLift Onshore & Offshore Vessels & Access 2013 27-28 November 2012, London, UK May 2013, London, UK www.windliftevent.com www.offshorevesselsforum.com Book Now! Call +44 (0)20 8267 4011
  • 6.
    Cost-effectively delivering foundations for use in deeper water with bigger turbines Thursday, 15 November 2012 Offshore Substation Design, Installation & Maintenance Separately Bookable Focus Day Due to popular demand Windpower Monthly will be hosting an • How big substations are going to need to be to cater for new Offshore Substations Focus Day on 15 November. HVDC equipment • Should new substations be taken out on vessels or floated out to The day will explore key issues regarding substation design, the site? installation and maintenance affecting projects in deeper water and • Best-practice corrosion protection with large numbers of turbines. • What considerations need to be made for fire protection and 10.00-16.00 (Registration begins at 09.30) suppression? By attending just one day you will find out about: Who should attend? • Design considerations for substations in deeper water and for This event is a must-attend for civil & structural engineers working on larger projects substation design, installation and maintenance. – exploring the latest standards The agenda for this focus day is still in development so keep an eye • Economically installing topsides with much higher weights than on www.offshorewindsubstations.com for updates. previously known – what vessels and lifting tools are available? Companies we are inviting to speak include DONG Energy, – how long will they take to install? Centrica, RWE, DNV & RES Offshore. – what will be the cost of installation? – self installing vs. traditional installation techniques – foundation needs Feedback From past attendees “ Very good event, well “ This event allowed/forced like-minded individuals organised and attended.” across race, gender and generation to openly share Technical Director, in a small group setting through short sound bite Submarine Technology Ltd topics. Great job! People were here until the very end, what a compliment! Your entire team was “ Great opportunity for engaging, kind, supportive and competent.” networking, and keeping up Senior Vice President EHS, with innovations.” PCG Wind International Project Management, “ Availon Inc This conference was very informative and a great place to network.” Media Partners: National Co-ordinator, Elevator Industry Work Fund Sponsored By: Book Now! Visit www.futurewindfoundations.com
  • 7.
    Get Involved WHo sHould attend? Directors, Heads, Managers of: 1 2 Foundations/Structures 3 4 Civil Engineering 10 Structural Engineering 9 Installation 5 OM 8 Technical/Technology 6 Project Available* 7 contact hs@windpowermonthly.com Site Reserved* Procurement *Correct at time of printing Business Development WHo WIll You meet? SENIOR LEVEL ATTENDEES 22% Manager INDUSTRY BREAKDOWN 23% Engineer 22% Engineer 16% OEM 10% Director 13% Consultant 14% C-Level 11% Finance/Investment 11% Consultant 10% Developer 7% Finance/Investment 9% Other 5% Project Manager 5% Govt 1% Academic/Other 3% Utilitiy Book Now! Call +44 (0)20 8267 4011
  • 8.
    FEATURING SPEAKERS FROM: Book Before 27 September Save Up To £450! FUTURE Book before 27 Sept £1300 Book before 26 Oct £1400 Book after 26 Oct £1500 OFFSHORE Two-Day Forum Only Saving £200 Saving £100 Saving – FOUNDATIONS £1549 £1649 £1749 Two-Day Forum + Logistics Master Class Saving Saving Saving £450 £350 £250 £1749 £1849 £1949 Two-Day Forum + Cost-effectively delivering foundations for Substations Focus Day Saving Saving Saving £200 £100 – use in deeper water with bigger turbines £549 £599 £649 A Two-Day Forum Plus Half-Day Master Class/Focus Day: Substations Focus Day Only Saving Saving Saving £100 £50 – 13-15 November 2012, Bremen, Germany Additional options Details* Logistics Master Class Only £449 3 WAYS TO BOOK Speaker Notes £199 (No VAT) *All rates will have VAT @ 19% added 1. Online: www.futurewindfoundations.com ** vs booking items seperately at standard prices Further Information For Delegates 2. Email: events@windpowermonthly.com Email events@windpowermonthly.com 3. Call: +44 (0)20 8267 4011 Let Us Manage Your Event For You Haymarket Events organises a variety of event formats on behalf of third-parties, including associations, not-for-profit organisations, the public sector and corporate clients. We work to the client’s objectives to produce dynamic events that deliver exceptional results. For more information, Full Terms Conditions available online at time of booking please contact Barney Roe on +44 (0)20 8267 4063 or email barney.roe@haymarket.com. www.futurewindfoundations.com Sponsorship, Exhibition Business Development Opportunities Don’t miss out on this great opportunity to increase your exposure amongst Conference Code: 17181111587 decision-makers looking into foundations solutions enjoy face-to-face time with potential customers; contact Heather Smith on +44 (0) 20 8267 4785 or Brochure code: WEB email hs@windpowermonthly.com today. Foundations for Future Offshore Wind is produced by Haymarket Conferences