Infrastructure

Apply for a Clean Air Grant to install an electric charging station, a hydrogen fueling station, or infrastructure to support agricultural pump electrification.

Eligibility Criteria

  • Eligible project types include agricultural pump electrification and battery charging or hydrogen fueling stations. Single-family residential projects are not eligible for funds.
  • The project must be installed and located in Placer County.
  • Infrastructure projects will be subject to a competitive review process conducted by District staff. 
  • Incomplete and/or late applications will be disqualified. Projects that do not meet the eligibility requirements listed in the application or within the Carl Moyer Guidelines will be ineligible for review. 
  • Project funds may be oversubscribed, which means not all eligible projects will receive funding. Should more qualifying projects be received than can be funded, it will be at the discretion of the Air Pollution Control Officer to make final award determinations.

Applications

Applications must be submitted using the PCAPCD's online application forms. The following application form will be available:

  • Alternative Fueling Infrastructure Application
  • Agricultural Pump Electrification Infrastructure Application
    • Infrastructure must directly power a zero‐emission, stationary agricultural pump funded by the air district with Carl Moyer Grant Program funds.

The application link will be posted on this webpage when it becomes available. Applicants must wait until the active application link is posted before submitting an application. Applications submitted by email, mail, or in any format other than the online forms will not be accepted.

Please check this webpage for updates and for the release of the application link.

Resources

Ranking Rubric for Alternative Fueling Infrastructure Projects

Alternative fueling infrastructure projects will be scored and evaluated using the criteria below:

Scoring BreakdownMaximum Points
Consistency with the Scope of Funding Source20
Level of Project Confidence20
Dedicated Co-Funding15
Estimated Level of Use15
Community Benefit10
Established Demand10
Station Location10
Power Source not Derived from Fossil Fuels10
Bonus Points10
Total Maximum Points120

Waitlist

Applicants will receive notification of project status via email within 30 days of application receipt. Applicants who are not awarded funds due to a lack of funding, but would otherwise be eligible for a grant, have the option of being placed on a waitlist. Applicants will automatically remain on the waitlist for up to 6 months. Applicants who would like to remain on the waitlist after 6 months have passed must email us a request