HomeUSD / SGD • Currency
Follow
USD / SGD
Previous close
1.29
About United States Dollar
The United States dollar is the official currency of the United States and several other countries. The Coinage Act of 1792 introduced the U.S. dollar at par with the Spanish silver dollar, divided it into 100 cents, and authorized the minting of coins denominated in dollars and cents. U.S. banknotes are issued in the form of Federal Reserve Notes, popularly called greenbacks due to their predominantly green color.
The U.S. dollar was originally defined under a bimetallic standard of 371.25 grains fine silver or, from 1834, 23.22 grains fine gold, or $20.67 per troy ounce. The Gold Standard Act of 1900 linked the dollar solely to gold. From 1934, its equivalence to gold was revised to $35 per troy ounce. In 1971 all links to gold were repealed. The U.S. dollar became an important international reserve currency after the First World War, and displaced the pound sterling as the world's primary reserve currency by the Bretton Woods Agreement towards the end of the Second World War. The dollar is the most widely used currency in international transactions, and a free-floating currency. WikipediaAbout Singapore Dollar
The Singapore dollar is the official currency of the Republic of Singapore. It is divided into 100 cents. It is normally abbreviated with the dollar sign $, or S$ to distinguish it from other dollar-denominated currencies. The Monetary Authority of Singapore issues the banknotes and coins of the Singapore dollar.
As of 2024, the Singapore dollar is the 13th most traded currency in the world. Apart from its use in Singapore, the Singapore dollar is also accepted as customary tender in Brunei according to the Currency Interchangeability Agreement between the Monetary Authority of Singapore and the Autoriti Monetari Brunei Darussalam. Likewise, the Brunei dollar is also customarily accepted in Singapore. Wikipedia