CN205653036U - Structure of wireless communication device integration installation - Google Patents

Structure of wireless communication device integration installation Download PDF

Info

Publication number
CN205653036U
CN205653036U CN201620221027.8U CN201620221027U CN205653036U CN 205653036 U CN205653036 U CN 205653036U CN 201620221027 U CN201620221027 U CN 201620221027U CN 205653036 U CN205653036 U CN 205653036U
Authority
CN
China
Prior art keywords
support
installing
plate
location
equipment connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620221027.8U
Other languages
Chinese (zh)
Inventor
李孝臣
李伟
谭德谦
刘健
阚杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201620221027.8U priority Critical patent/CN205653036U/en
Application granted granted Critical
Publication of CN205653036U publication Critical patent/CN205653036U/en
Priority to PCT/CN2016/111038 priority patent/WO2017161931A1/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01QANTENNAS, i.e. RADIO AERIALS
    • H01Q1/00Details of, or arrangements associated with, antennas
    • H01Q1/12Supports; Mounting means
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01QANTENNAS, i.e. RADIO AERIALS
    • H01Q3/00Arrangements for changing or varying the orientation or the shape of the directional pattern of the waves radiated from an antenna or antenna system
    • H01Q3/01Arrangements for changing or varying the orientation or the shape of the directional pattern of the waves radiated from an antenna or antenna system varying the shape of the antenna or antenna system

Landscapes

  • Support Of Aerials (AREA)

Abstract

The utility model provides a structure of wireless communication device integration installation, include: structural framework, structural framework include relative first support, second support and a plurality of installing component, a plurality of installing components connect in first support with between the second support, draw bearing structure to one side, draw the bearing structure perpendicular to to one side first support with the second support, and first end with first support or second support fixed connection, wherein, be provided with a plurality of antenna connection spares that are used for the fixed mounting antenna on the first support, be provided with the main material anchor clamps that are used for with iron tower owner material fixed mounting on the second support, it is provided with the subsidiary material anchor clamps that are used for assisting material fixed mounting with the iron tower on the bearing structure to draw to one side, be provided with the equipment connecting piece that is used for fixed mounting wireless communication equipment on the installing component. This structure can satisfy the installation of many device integration, practices thrift iron tower installation space, the wiring debugging of being convenient for.

Description

A kind of structure of wireless telecommunications system integrated installation
Technical field
This utility model relates to mobile communication steel tower technical field, particularly relates to a kind of wireless telecommunications system integrated The structure installed.
Background technology
During steel tower uses at present, due to the restriction of existing equipment mounting structure, generally require channel radio News equipment conveying arrives at a station and a little installs, and is on the one hand frequently encountered by the problem that integration of equipments installing space is not enough, On the other hand, what wireless telecommunications system ability when website installation can run into personnel on site's commissioning device was short of asks Topic, brings some inconvenience, and traditional equipment mounting structure can not meet this demand, the newest Integration of equipments mounting structure demand the most all the more urgent.Existing equipment mounting structure can not meet many integration of equipments The problem of the problem installed and equipment and mounting structure field connection debugging difficulty needs solution badly.
Utility model content
In order to overcome the problems referred to above, this utility model provides the structure of a kind of wireless telecommunications system integrated installation, Solve existing equipment mounting structure and can not meet problem that many integration of equipments install and equipment and mounting structure are existing The problem of field wiring debugging difficulty.
In order to solve above-mentioned technical problem, this utility model adopts the following technical scheme that
A kind of structure of wireless telecommunications system integrated installation, including:
Structural framing, described structural framing includes relative the first support, the second support and multiple installing component, Multiple described installing components are connected between described first support and described second support;
Oblique pull supporting construction, described oblique pull supporting construction is perpendicular to described first support and described second support, And first end and described first support or described second support is fixing is connected;
Wherein, described first support is provided with the multiple antenna connections for fixedly mounting antenna;Described It is provided with on second support for main material fixture hard-wired with iron tower main material;In described oblique pull supporting construction It is provided with for the hard-wired auxiliary material fixture of material auxiliary with steel tower;It is provided with for fixing on described installing component The equipment connector of wireless telecommunications system is installed.
Alternatively, described installing component includes:
First installed part, the second installed part and be connected between described first installed part and described second installed part Multiple connecting plates, form the first installing space of described equipment connector between adjacent described connecting plate;
Wherein, the two ends of described first installed part and described second installed part respectively with described first support and institute State the second support to connect, back to the side of described connecting plate on described first installed part and described second installed part Form the second installing space of described equipment connector respectively.
Alternatively, described equipment connector includes:
For fixedly mounting the first equipment connector of radio frequency remote unit RRU, and it is used for fixedly mounting filter Second equipment connector of ripple device;Described first equipment connector is installed on described first installing space;Described Second equipment connector is installed on described second installing space.
Alternatively, it is disposed in parallel relation to one another between multiple described connecting plates.
Alternatively, described auxiliary material fixture include by multiple holders formed can modulation the first grasping part and Second grasping part, wherein said oblique pull supporting construction is fixed on described first grasping part, and described steel tower is auxiliary Material is fixed on described second grasping part.
Alternatively, described main material fixture includes fixing the first location-plate being oppositely arranged and the second location-plate, its Described in worn by bolt between the first location-plate with described second location-plate and be connected, and described second location Plate can move relative to described first location-plate, between described first location-plate and described second location-plate Space is formed as the fixed space of described iron tower main material.
Alternatively, described antenna connection includes a connecting rod and is connected with described connecting rod, has the 3rd The holder of grasping part, described first support is fixed on described 3rd grasping part, described connecting rod and institute State the fixing connection of the first support vertical.
Alternatively, described structure also includes: the 3rd support, be connected to described 3rd support with described first Between frame multiple first extends connectors and is connected between described 3rd support and described second support Multiple second extension connectors, described 3rd support is provided with the multiple antenna connections for fixed antenna.
Alternatively, the first installing component in multiple described installing components is provided with for lifting by crane hanging of installation Ring, wherein said first installing component position is set higher than other installing components in described installing component Position is set.
Alternatively, described first support, parallel to each other between the second support and iron tower main material, multiple described Between installing component parallel to each other.
The beneficial effects of the utility model are:
The structure of above-mentioned wireless telecommunications system integrated installation, by antenna connection and other wireless telecommunications systems Integrated installing on structural framing, and design fixture and be connected with iron tower main material, design oblique pull supports Material auxiliary with steel tower is connected, and to strengthen lateral stability, this structure can meet many integration of equipments and install, and saves ferrum Tower installing space, makes the field connection debugging of equipment and mounting structure become easy simultaneously.
Accompanying drawing explanation
Fig. 1 represents the overall schematic of the structure of wireless telecommunications system integrated installation in this utility model;
Fig. 2 represents the schematic diagram of structural framing in this utility model;
Fig. 3 represents the schematic diagram of main material fixture in this utility model;
Fig. 4 represents the schematic diagram of auxiliary material fixture in this utility model;
Fig. 5 represents the first scheme of installation of equipment connector in this utility model;
Fig. 6 represents the second scheme of installation of equipment connector in this utility model;
Fig. 7 represents the scheme of installation of antenna connection in this utility model;
Fig. 8 represents the schematic diagram of oblique pull supporting construction in this utility model;
Fig. 9 represents the first schematic diagram of wireless telecommunications system integrated installation in this utility model;
Figure 10 represents the second schematic diagram of wireless telecommunications system integrated installation in this utility model;
Figure 11 represents that this utility model includes the structure of the wireless telecommunications system integrated installation of the 3rd support Schematic diagram.
Reference:
1-structural framing, 11-the first support, 12-the second support, 13-installing component, 14-the 3rd support, 131- First installed part, 132-the second installed part, 133-connecting plate, 2-oblique pull supporting construction, 3-antenna connection, 4-main material fixture, 41-the first location-plate, 42-the second location-plate, 43-the 3rd assembly, 44-the 4th assembly, 5-auxiliary material fixture, 51-the first holder, 52-the second holder, 53-the 3rd holder, 54-the 4th clamps Part, 6-equipment connector, 61-the first equipment connector, 62-the second equipment connector, 7-iron tower main material, The auxiliary material of 8-steel tower, 9-suspension ring, 10-RRU, 101-wave filter, 102-antenna.
Detailed description of the invention
It is more fully described the exemplary embodiment of the disclosure below with reference to accompanying drawings.Although accompanying drawing shows The exemplary embodiment of the disclosure, it being understood, however, that may be realized in various forms the disclosure and should be by Embodiments set forth here is limited.On the contrary, it is provided that these embodiments are able to be best understood from this Open, and complete for the scope of the present disclosure can be conveyed to those skilled in the art.
As shown in Figure 1 and Figure 2, the utility model discloses the structure of a kind of wireless telecommunications system integrated installation, This structure includes:
Structural framing 1, this structural framing 1 includes first relative support the 11, second support 12 and multiple Installing component 13, these installing components 13 multiple are connected between the first support 11 and the second support 12;Should Structure also includes that oblique pull supporting construction 2, oblique pull supporting construction 2 are perpendicular to the first support 11 and the second support 12, and the first end and the first support 11 or the second support 12 is fixing connects;Wherein, on the first support 11 It is provided with the multiple antenna connections 3 for fixedly mounting antenna;Be provided with on second support 12 for The hard-wired main material fixture 4 of iron tower main material 7;It is provided with in oblique pull supporting construction 2 for material auxiliary with steel tower 8 hard-wired auxiliary material fixtures 5;It is provided with for fixedly mounting wireless telecommunications system on installing component 13 Equipment connector 6.
Specifically, first support the 11, second support 12 in this structural framing 1 and be connected to the first support 11, the cooperation each other of the multiple installing components 13 between the second support 12 makes this structural framing 1 whole Body is ladder-shaper structure, and multiple installing components 13 can be installed multiple wireless telecommunications system, wherein this structure Framework 1 is connected with iron tower main material 7 by main material fixture 4, is supported by oblique pull, is coordinated auxiliary material fixture 5 Material 8 auxiliary with steel tower is connected, it is achieved with the fixed installation of communication iron tower, antenna connection 3 is arranged on structural frames On first support 11 of frame 1, other wireless telecommunications systems are fixedly installed on multiple installing component 13.
Wherein, alternatively, as shown in Figure 8, the first end of oblique pull supporting construction 2 is mounted on first Frame 11 or the top of the second support 12, the quantity of this oblique pull supporting construction 2 is also multiple, preferably two, These two oblique pull supporting constructions 2 are fixing with the top of the first support 11 or the second support 12 respectively to be connected;Should Main material fixture 4 quantity is also multiple.
This equipment mounting structure of this utility model design, sets antenna connection 3 and other wireless telecommunications Standby integrated installing on structural framing 1, and design fixture and be connected with iron tower main material 7, design is oblique Drawing support material 8 auxiliary with steel tower to be connected, to strengthen lateral stability, this structure can meet many integration of equipments and install, Saving steel tower installing space, the structure of this wireless telecommunications system integrated installation can be with equipment in factory or locality Storehouse carry out assembling wiring debugging complete after, directly lift to website, solve website field connection adjust The problem that examination is difficult so that the field connection debugging of equipment and mounting structure becomes easy.
Preferably, this installing component 13 includes: first installed part the 131, second installed part 132 and connection Multiple connecting plates 133 between described first installed part 131 and described second installed part 132, adjacent institute State the first installing space forming described equipment connector 6 between connecting plate 133.Installing component 13 quantity It is preferably 4.
Wherein, the two ends of the first installed part 131 and the second installed part 132 respectively with described first support 11 And described second support 12 connects, on described first installed part 131 and described second installed part 132 back to The side of described connecting plate 133 forms the second installing space of described equipment connector 6 respectively.
Here, first installed part the 131, second installed part 132 is specifically as follows the tabular installation being oppositely arranged Part, is provided with connecting plate 133 between first installed part the 131, second installed part 132, strong with reinforcement structure Degree.The equipment connector 6 installation position on this installing component 13 is specially between adjacent connection plates 133 Space, and first installed part the 131, second installed part 132 is back on the side of connecting plate 133 Two installing spaces, the installing component 13 in this frame structure is General design, specifically can pacify according to waiting The demand of the concrete wireless telecommunications system of dress carrys out the concrete installation site of decision device connector 6.
Specifically, as shown in Figure 5, Figure 6, this equipment connector 6 includes: be used for fixedly mounting RRU First equipment connector 61 of (Radio Remote Unit, Remote Radio Unit) 10, and be used for fixing Second equipment connector 62 of wave filter 101 is installed;First equipment connector 61 is installed on described first peace Dress space;Second equipment connector 62 is installed on described second installing space.
First equipment connector 61 is specially a covering plate structure, is covered on the first installing space, and cover plate is tied The lid being configured to sets and is provided with installing hole in plane, in order to the fixed installation of RRU10, this first installation Outside space, both sides can all be covered with the first equipment connector 61;Second equipment connector 62 is specially U-shaped company Fitting, in the concrete installation of this U-shaped connector, it is at first installed part the 131, second installed part 132 All having corresponding installation on the side of connecting plate 133, specifically, the two ends foot of U-shaped connector is oriented Away from the direction of connecting plate 133, the back flat being connected between the foot of two ends fit the first installed part 131, Second installed part 132 fixedly mounts back to the side of connecting plate 133, and the two ends foot of U-shaped connector is arranged Having installing hole, in order to the fixed installation of wave filter 101, the second equipment connector 62 is at each installation portion The number arranged on part 13 is multiple.
Four pieces of installing components 13 in frame structure are General design, therefore RRU connector and wave filter Connector can fixedly mount on any one piece of installing component 13, is not limited in Fig. 9, Figure 10 institute The RRU10 shown and wave filter 101 installation site, the fixed position of wireless telecommunications system and installation quantity are equal For example, can freely be configured and increase and decrease.As shown in Figure 10, RRU10 can be placed in multiple installation portion Part 13 is installed on the installing component on the lower of position.
Preferably, as shown in Figure 4, this auxiliary material fixture 5 include by multiple holders formed can modulation One grasping part and the second grasping part, wherein said oblique pull supporting construction 2 is fixed on the first grasping part, The auxiliary material of steel tower 8 is fixed on the second grasping part.
The plurality of holder includes: the first holder 51 and the second of the first L-shaped handing-over of holder 51 The 3rd holder 53 that holder 52 is oppositely arranged with the first holder 51 and with the second holder 52 phase To the 4th holder 54 arranged;Worn by bolt between first holder 51 and the 3rd holder 53 Connect, and can relative movement between the 3rd holder 53 and the first holder 51;Second holder 52 It is connected with being worn by bolt between the 4th holder 54, and the 4th holder 54 and the second holder 52 Between can relative movement, form the first grasping part between the 3rd holder 53 and the first holder 51, The second grasping part is formed between 4th holder 54 and the second holder 52;To realize oblique pull support and ferrum Connection between the auxiliary material of tower 8 is fixed, and is connected fixing by auxiliary to structural framing 1 and steel tower material 8, strengthens lateral steady Qualitative.
Preferably, as it is shown on figure 3, this main material fixture 4 includes fixing the first location-plate 41 being oppositely arranged With the second location-plate 42, between wherein said first location-plate 41 and described second location-plate 42, pass through spiral shell Bolt wears connection, and described second location-plate 42 can move relative to described first location-plate 41, described Space between first location-plate 41 and described second location-plate 42 is formed as the fixing of described iron tower main material 7 Space.
It is fixed with first that this main material fixture 4 is additionally included in first location-plate 41 side away from the second location-plate 42 Position plate 41 connects the 3rd assembly 43 forming circulus, and the 3rd assembly 43 is away from the first location-plate 41 A side on connect and have the 4th assembly 44, the 4th assembly 44 and this side form grasping part, second Support 12 is fixed in this grasping part, this grasping part be can modulation, this main each assembly of material fixture 4 it Between be demountable structure, the 4th assembly 44 is a semicircular being consistent with the second support 12 physical dimension Structure.
Preferably, as it is shown in fig. 7, this antenna connection 3 includes a connecting rod and is connected with described connecting rod Connecing, have the holder of the 3rd grasping part, the first support 11 is fixed on the 3rd grasping part, connecting rod Fix vertical with the first support 11 is connected, and this antenna connection is installed with antenna 102.
Wherein, the 3rd grasping part can be formed after being connected with connecting rod by holder, and this holder can be The one semicircular structure being consistent with the first support 11 physical dimension.
Further, as shown in figure 11, this structure also includes: the 3rd support 14, be connected to the described 3rd Between support 14 and described first support 11 multiple first extends connectors and is connected to described 3rd support Multiple second extension connectors between 14 and described second support 12, described 3rd support 14 is arranged There are the multiple antenna connections for fixed antenna.
Preferably, this antenna connection includes a connecting rod and is connected with connecting rod, has a grasping part Holder, described 3rd support 14 is fixed on described 3rd grasping part, described connecting rod and described the Three supports 14 are vertically fixing to be connected, and this antenna connection is installed with antenna 102.
Wherein, specifically, this grasping part can be formed after being connected with connecting rod by holder, this clamping Part can be a semicircular structure being consistent with the 3rd support 14 physical dimension, the 3rd support 14, first Structural relation parallel to each other can be between support 11 and the second support 12.Specifically, the 3rd support 14 be one set up outside structural framing 1 extend out pole, can additionally increase antenna installing space, multiple First extension connector and multiple second extension connector increase Stability Analysis of Structures firmness.
Preferably, the first installing component in multiple installing components 13 is provided with for lifting by crane hanging of installation Ring 9, wherein the first installing component position setting higher than other installing components in installing component 13 is set Seated position.These suspension ring 9 are specifically installed on installing component outermost in multiple installing component 13, the party Case is preset suspension ring 9, it is simple to the lifting of equipment.
It is alternatively, parallel to each other between above-mentioned first support the 11, second support 12 and iron tower main material 7, Between multiple installing components 13 parallel to each other;It is disposed in parallel relation to one another between multiple connecting plates;First installed part, Between second installed part parallel to each other;The first above-mentioned support the 11, second support 12 and the 3rd support 14 For rod-shaped scaffold.
The structure of the wireless telecommunications system integrated installation in this utility model, in concrete application process, can With in factory or storehouse first by antenna connection 3, include that RRU connector and wave filter connector etc. exist Interior wireless telecommunications system connector 6 carries out installation and is connected with structural framing 1, in addition it is also necessary to by structural framing 1 Being attached with main material fixture 4, be connected with each connector by wireless telecommunications system, wiring is tested;Test At website oblique pull supported after Biing and be attached with structural framing 1, and auxiliary material fixture 5 is fixed on oblique pull props up In support;The suspension ring 9 preset by structural framing 1 carry out integral lifting, and main material fixture 4 is fixed on tower body On main material, and by auxiliary material fixture 5, oblique pull is supported and fixed on the auxiliary material of tower body, is finally completed installation.Should Structure can with equipment factory or local storehouse carry out assembling wiring debugging complete after, directly enter to website Row lifting, solves the problem that website field connection debugging is difficult.
Finally, in addition it is also necessary to explanation, in this article, the relational terms of such as first and second or the like is only Only be used for by an entity or operation separate with another entity or operating space, and not necessarily require or Imply relation or the order that there is any this reality between these entities or operation.And, term " bag Include ", " comprising " or its any other variant be intended to comprising of nonexcludability, so that include one The process of list of elements, method, article or terminal unit not only include those key elements, but also include not There are other key elements being expressly recited, or also include for this process, method, article or terminal unit Intrinsic key element.In the case of there is no more restriction, by wanting that statement " including ... " limits Element, it is not excluded that there is also additionally in including the process of described key element, method, article or terminal unit Identical element.
Above-described is preferred implementation of the present utility model, it should be pointed out that general for the art For logical personnel, some improvement and profit can also be made under without departing from principle premise described in the utility model Decorations, these improvements and modifications are also in protection domain of the present utility model.

Claims (10)

1. the structure of a wireless telecommunications system integrated installation, it is characterised in that including:
Structural framing, described structural framing includes relative the first support, the second support and multiple installing component, Multiple described installing components are connected between described first support and described second support;
Oblique pull supporting construction, described oblique pull supporting construction is perpendicular to described first support and described second support, And first end and described first support or described second support is fixing is connected;
Wherein, described first support is provided with the multiple antenna connections for fixedly mounting antenna;Described It is provided with on second support for main material fixture hard-wired with iron tower main material;In described oblique pull supporting construction It is provided with for the hard-wired auxiliary material fixture of material auxiliary with steel tower;It is provided with for fixing on described installing component The equipment connector of wireless telecommunications system is installed.
Structure the most according to claim 1, it is characterised in that described installing component includes:
First installed part, the second installed part and be connected between described first installed part and described second installed part Multiple connecting plates, form the first installing space of described equipment connector between adjacent described connecting plate;
Wherein, the two ends of described first installed part and described second installed part respectively with described first support and institute State the second support to connect, back to the side of described connecting plate on described first installed part and described second installed part Form the second installing space of described equipment connector respectively.
Structure the most according to claim 2, it is characterised in that described equipment connector includes:
For fixedly mounting the first equipment connector of radio frequency remote unit RRU, and it is used for fixedly mounting filter Second equipment connector of ripple device;Described first equipment connector is installed on described first installing space;Described Second equipment connector is installed on described second installing space.
Structure the most according to claim 2, it is characterised in that the most equal between multiple described connecting plates Row is arranged.
Structure the most according to claim 1, it is characterised in that described auxiliary material fixture includes by multiple folders Gripping member formed can the first grasping part of modulation and the second grasping part, wherein said oblique pull supporting construction is solid Due to described first grasping part, the auxiliary material of described steel tower is fixed on described second grasping part.
Structure the most according to claim 1, it is characterised in that described main material fixture includes fixing phase To the first location-plate arranged and the second location-plate, wherein said first location-plate and described second location-plate it Between wear connection by bolt, and described second location-plate can move relative to described first location-plate, institute State the space between the first location-plate and described second location-plate and be formed as the fixed space of described iron tower main material.
Structure the most according to claim 1, it is characterised in that described antenna connection includes a connection Bar and the holder of the 3rd grasping part that is connected with described connecting rod, has, described first support is fixed on Described 3rd grasping part, described connecting rod is fixing with described first support vertical to be connected.
Structure the most according to claim 1, it is characterised in that described structure also includes: the 3rd support, Multiple first be connected between described 3rd support and described first support extends connectors and is connected to institute State the multiple second extension connectors between the 3rd support and described second support, described 3rd support is arranged There are the multiple antenna connections for fixed antenna.
Structure the most according to claim 1, it is characterised in that first in multiple described installing components Be provided with the suspension ring for lifting by crane installation on installing component, wherein said first installing component to arrange position high Other installing components in described installing component position is set.
Structure the most according to claim 1, it is characterised in that described first support, the second support, And parallel to each other between iron tower main material, parallel to each other between multiple described installing components.
CN201620221027.8U 2016-03-22 2016-03-22 Structure of wireless communication device integration installation Expired - Fee Related CN205653036U (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201620221027.8U CN205653036U (en) 2016-03-22 2016-03-22 Structure of wireless communication device integration installation
PCT/CN2016/111038 WO2017161931A1 (en) 2016-03-22 2016-12-20 Structure for integrated installation of wireless communication device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620221027.8U CN205653036U (en) 2016-03-22 2016-03-22 Structure of wireless communication device integration installation

Publications (1)

Publication Number Publication Date
CN205653036U true CN205653036U (en) 2016-10-19

Family

ID=57356585

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620221027.8U Expired - Fee Related CN205653036U (en) 2016-03-22 2016-03-22 Structure of wireless communication device integration installation

Country Status (2)

Country Link
CN (1) CN205653036U (en)
WO (1) WO2017161931A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017161931A1 (en) * 2016-03-22 2017-09-28 中兴通讯股份有限公司 Structure for integrated installation of wireless communication device
CN112279070A (en) * 2020-11-16 2021-01-29 中国科学院合肥物质科学研究院 A device hoisting mechanism suitable for ultra-high vacuum and strong radiation conditions

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT521929B1 (en) 2018-11-20 2021-03-15 Ms Cns Communication Network Solutions Gmbh Support structure and antenna mast for mounting cellular radio equipment
CN110891203B (en) * 2019-12-13 2024-07-12 桂林电子科技大学 Assembled combined bracket for mounting RRU communication module equipment
CN113954037B (en) * 2021-10-11 2023-08-04 中船澄西船舶修造有限公司 Middle assembly jig frame for hoisting vertical cylinder by crane

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5626231A (en) * 1995-11-27 1997-05-06 Agfa Division, Bayer Corp. Crate and pallet assembly
US20130214652A1 (en) * 2012-02-21 2013-08-22 Richard Mathewson Adaptable remote radio unit mounting frame
CN105960733A (en) * 2013-12-21 2016-09-21 康普技术有限责任公司 Pre-assembled cell site sector
CN204516881U (en) * 2015-01-30 2015-07-29 中国铁塔股份有限公司南京市分公司 Telescopic T-shaped arm communication tower platform
CN205653036U (en) * 2016-03-22 2016-10-19 中兴通讯股份有限公司 Structure of wireless communication device integration installation

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017161931A1 (en) * 2016-03-22 2017-09-28 中兴通讯股份有限公司 Structure for integrated installation of wireless communication device
CN112279070A (en) * 2020-11-16 2021-01-29 中国科学院合肥物质科学研究院 A device hoisting mechanism suitable for ultra-high vacuum and strong radiation conditions
CN112279070B (en) * 2020-11-16 2023-04-28 中国科学院合肥物质科学研究院 Device hoisting mechanism suitable for under ultra-high vacuum and strong radiation conditions

Also Published As

Publication number Publication date
WO2017161931A1 (en) 2017-09-28

Similar Documents

Publication Publication Date Title
CN205653036U (en) Structure of wireless communication device integration installation
CN202831637U (en) Support frame for manufacturing steel girder
CN204013684U (en) A kind of Novel mobilephone support
CN210600461U (en) An assembled anti-seismic support hanger
CN103255837B (en) A kind of removable modular combination room
CN207776547U (en) A kind of round platform
CN105060154A (en) Suspension installation machine of suspended load type transformer
CN215972806U (en) Perpendicular PTH utility type auxiliary fixture
CN206615927U (en) Large-scale dry-type air-core reactor special hanger
CN210408026U (en) Router installation mounted frame
RU130336U1 (en) ANTENNA SUPPORT OF THE TOWER TYPE
CN211143695U (en) Operating platform for assisting assembly type tower crane in dismounting
CN221278871U (en) Rail robot charging support and rail robot charging system
CN210236961U (en) Suspended ceiling lifting device
CN206061164U (en) A kind of transmission signal type base station
CN214589208U (en) Mobile communication base station pole device
CN208491659U (en) A kind of abrasion-proof stainless steel bracket
CN109138495A (en) System and construction method are lifted in a kind of construction of eminence pipe string
CN217503275U (en) Communication equipment mounting device
CN207776407U (en) A kind of heavy duty triangular platform
CN206521199U (en) A kind of aluminium plate in coil suspender and aluminium plate in coil conveying device
CN214064403U (en) Mounting base of mobile communication base station equipment and mounting device thereof
CN210340182U (en) Outdoor capstan winch type manual lifting rod convenient to move and install
CN215211817U (en) GRG combined dry hanging piece
CN211046817U (en) Solar power generation device for power grid

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161019

CF01 Termination of patent right due to non-payment of annual fee