CN110820564A
CN110820564A CN201910978197.9A CN201910978197A CN110820564A CN 110820564 A CN110820564 A CN 110820564A CN 201910978197 A CN201910978197 A CN 201910978197A CN 110820564 A CN110820564 A CN 110820564A
Authority
CN
China
Prior art keywords
bottom fixed
platform
opening
closing
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910978197.9A
Other languages
Chinese (zh)
Other versions
CN110820564B (en
Inventor
孙建渊
倪鹏
张博洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CN201910978197.9A priority Critical patent/CN110820564B/en
Publication of CN110820564A publication Critical patent/CN110820564A/en
Application granted granted Critical
Publication of CN110820564B publication Critical patent/CN110820564B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明涉及一种可升降可开合的盖梁施工检修多用途平台,包括底层固定平台、分别设于底层固定平台上的开合支架系统及检修锚固系统,以及与底层固定平台传动连接的提升悬吊系统。与现有技术相比,本发明结构简单新颖、便于组装拆卸,通过将施工平台与检修平台融合,有利于节约施工支架材料、减少搭建过程的工作量,进而提高施工过程与检修过程的工作效率以及施工质量,具有一定程度的可推广性。

The invention relates to a multi-purpose platform for the construction and maintenance of cover beams that can be lifted and opened, including a bottom fixed platform, an opening and closing bracket system and a maintenance anchor system respectively arranged on the bottom fixed platform, and a lift connected with the bottom fixed platform. Suspension system. Compared with the prior art, the present invention has a simple and novel structure and is easy to assemble and disassemble. By integrating the construction platform and the maintenance platform, it is beneficial to save construction support materials, reduce the workload of the construction process, and further improve the work efficiency of the construction process and the maintenance process. As well as the construction quality, it has a certain degree of generalizability.

Description

一种可升降可开合的盖梁施工检修多用途平台A liftable and openable cover beam construction and maintenance multi-purpose platform

技术领域technical field

本发明属于桥梁建筑技术领域,涉及一种可升降可开合的盖梁施工检修多用途平台。The invention belongs to the technical field of bridge construction, and relates to a multi-purpose platform for construction and maintenance of cover beams that can be lifted and opened.

背景技术Background technique

目前我国建设工程领域呈现出建设量大、质量要求高、人力成本上升、节能环保要求高等特点,装配式建筑的使用可以在一定程度上缓和上述问题,实现建筑产业的转型升级和建筑产业现代化。装配式独立墩盖梁则多采用后张拉技术,需要人工操作的预应力张拉平台。以往多采用搭设脚手架,当盖梁较高时有时还需使用满堂脚手架,如果地基承载低,还要进行处理,不仅安全性、稳定性差,而且钢管和型钢需求量较大,施工成本高;在搭设和拆卸脚手架以及挂篮的过程中又需要大量的时间和人力,因此施工繁琐,浪费工程时间,劳动强度大,工作效率低,而如果平台能够升降、悬吊,就可以节省这些支架钢材。At present, my country's construction engineering field presents the characteristics of large construction volume, high quality requirements, rising labor costs, and high energy conservation and environmental protection requirements. The use of prefabricated buildings can alleviate the above problems to a certain extent, and realize the transformation and upgrading of the construction industry and the modernization of the construction industry. The prefabricated independent pier cover beam mostly adopts post-tensioning technology, which requires manual operation of prestressed tensioning platform. In the past, scaffolding was often used. When the cover beam is high, it is sometimes necessary to use full-scale scaffolding. If the bearing capacity of the foundation is low, it needs to be dealt with. Not only is the safety and stability poor, but also the demand for steel pipes and section steel is large, and the construction cost is high; The process of erecting and dismantling scaffolds and hanging baskets requires a lot of time and manpower, so the construction is cumbersome, wastes engineering time, labor-intensive, and work efficiency is low. If the platform can be lifted and suspended, these bracket steels can be saved.

同时为了及时检测维护盖梁顶部支座等构件,需要在盖梁侧面布设永久的检修平台,但是检修平台的作用往往与其造价不相配,施工时则趋于简化结构,一定程度使得平台危险系数提高。At the same time, in order to detect and maintain the components such as the top support of the cover beam in time, a permanent maintenance platform needs to be arranged on the side of the cover beam. However, the function of the maintenance platform often does not match its cost, and the structure tends to be simplified during construction, which increases the risk factor of the platform to a certain extent. .

单独的检修平台和张拉平台作用都有限制,因此需要一种结构较简单同时造价尽可能低廉,能够将预应力张拉施工平台和检修平台融为一体的、可以升降的复合平台,借此可以节约许多平台和支架的钢材,减少平台搭设时间,提高施工效率和施工质量。The functions of a separate maintenance platform and a tension platform are limited, so a composite platform that can be raised and lowered with a simpler structure and the lowest possible cost, which can integrate the prestressed tension construction platform and the maintenance platform into one, is required. It can save a lot of steel for platforms and brackets, reduce platform erection time, and improve construction efficiency and construction quality.

发明内容SUMMARY OF THE INVENTION

本发明的目的就是为了克服上述现有技术存在的缺陷而提供一种可升降可开合的盖梁施工检修多用途平台,一方面可作为施工平台配合工作人员对盖梁进行预应力张拉施工,施工后可升至盖梁两侧并作为检修平台固定,以此减少搭建平台的材料及时间,提高施工效率与施工质量。The purpose of the present invention is to provide a multi-purpose platform for the construction and maintenance of cover beams that can be lifted and closed in order to overcome the defects of the above-mentioned prior art. After construction, it can be raised to both sides of the cover beam and fixed as a maintenance platform, so as to reduce the material and time for building the platform, and improve the construction efficiency and construction quality.

本发明的目的可以通过以下技术方案来实现:The object of the present invention can be realized through the following technical solutions:

一种可升降可开合的盖梁施工检修多用途平台,包括底层固定平台、分别设于底层固定平台上的开合支架系统及检修锚固系统,以及与底层固定平台传动连接的提升悬吊系统。A multi-purpose platform for construction and maintenance of cover beams that can be lifted and opened, including a bottom fixed platform, an opening and closing bracket system and a maintenance anchoring system respectively arranged on the bottom fixed platform, and a lifting suspension system connected with the bottom fixed platform. .

进一步地,所述的底层固定平台包括分别设置在盖梁两侧的2个底层固定框架,所述的开合支架系统设置在2个底层固定框架之间。Further, the bottom fixed platform includes two bottom fixed frames respectively arranged on both sides of the cover beam, and the said opening and closing bracket system is arranged between the two bottom fixed frames.

通过将开合支架系统合并,使开合支架系统与2个底层固定框架共同组成施工平台,可用于对盖梁进行预应力张拉施工;将开合支架系统分开,通过提升悬吊系统将2个底层固定框架分别升至盖梁两侧,并通过检修锚固系统将底层固定框架固定于盖梁上,即可作为检修平台,供工作人员对盖梁进行检修。By merging the opening and closing support system, the opening and closing support system and the two bottom fixed frames together form a construction platform, which can be used for prestressed tension construction of the cover beam; the opening and closing support system is separated, and the 2 The bottom fixed frames are respectively raised to both sides of the cover beam, and the bottom fixed frame is fixed on the cover beam through the maintenance anchoring system, which can be used as a maintenance platform for the staff to repair the cover beam.

作为优选的技术方案,所述的施工平台及检修平台外均设有护栏,所述的护栏由工12.6型钢的立柱与

Figure BDA0002234346100000021
的钢管穿插组装而成,立柱等间距布设。As a preferred technical solution, guardrails are provided outside the construction platform and the maintenance platform.
Figure BDA0002234346100000021
The steel pipes are interspersed and assembled, and the columns are arranged at equal intervals.

作为优选的技术方案,所述的2个底层固定框架关于盖梁对称布设。As a preferred technical solution, the two bottom fixed frames are arranged symmetrically with respect to the cover beam.

进一步地,所述的底层固定框架的长度比盖梁长度长4-6m,所述的底层固定框架的宽度为1.5-1.6m。Further, the length of the bottom fixed frame is 4-6 m longer than the length of the cover beam, and the width of the bottom fixed frame is 1.5-1.6 m.

进一步地,所述的底层固定框架包括平行于盖梁长度方向设置的多个纵向梁以及与纵向梁垂直设置的横向梁机构,所述的横向梁机构包括一对第二横向梁组件以及多个并列设置在两第二横向梁组件之间的第一横向梁,所述的第二横向梁组件包括多个第二横向梁。Further, the bottom fixed frame includes a plurality of longitudinal beams arranged parallel to the length direction of the cover beams and a transverse beam mechanism arranged perpendicular to the longitudinal beams, and the transverse beam mechanism includes a pair of second transverse beam assemblies and a plurality of transverse beams. The first transverse beams are arranged in parallel between two second transverse beam assemblies, and the second transverse beam assemblies include a plurality of second transverse beams.

所述的第一横向梁沿纵向梁长度方向上的分布范围与盖梁长度相适配,所述的第二横向梁布设于第一横向梁分布范围的两端,多个第一横向梁之间、多个第二横向梁之间均为等间距布设,且多个第一横向梁之间的间距大于多个第二横向梁之间的间距。The distribution range of the first transverse beam along the length direction of the longitudinal beam is adapted to the length of the cover beam, the second transverse beam is arranged at both ends of the distribution range of the first transverse beam, and the plurality of first transverse beams are arranged at both ends of the distribution range of the first transverse beam. The spaces and the plurality of second transverse beams are all arranged at equal intervals, and the distance between the plurality of first transverse beams is greater than the distance between the plurality of second transverse beams.

作为优选的技术方案,所述的纵向梁采用工12.6型钢,所述的横向梁采用工25型钢,所述的底层固定框架包括至少3个并列设置的纵向梁,所述的底层固定框架上设有纵向支撑踏板,所述的纵向支撑踏板通过细钢丝绳固定于底层固定框架上,所述的纵向支撑踏板上还开设有开孔,便于安装其他构件。As a preferred technical solution, the longitudinal beams are made of I-12.6 steel, the transverse beams are made of I-25 steel, the bottom fixed frame includes at least three longitudinal beams arranged side by side, and the bottom fixed frame is provided with There is a longitudinal support pedal, the longitudinal support pedal is fixed on the bottom fixed frame through a thin wire rope, and an opening is also provided on the longitudinal support pedal to facilitate the installation of other components.

进一步地,所述的开合支架系统包括一前一后分别设于2个底层固定框架之间的2个开合支架组件,所述的开合支架组件包括分别与2个底层固定框架一端相铰接的2个开合支架。Further, the opening and closing bracket system includes two opening and closing bracket assemblies that are respectively arranged between the two bottom fixed frames in tandem, and the said opening and closing bracket assembly includes one end of the two bottom fixed frames respectively. Hinged 2 opening and closing brackets.

所述的2个开合支架可分别绕相应的底层固定框架上靠近盖梁的一侧翻转,翻转后的2个开合支架相拼接组成横向平台,2个横向平台与2个底层固定框架共同组成预应力张力施工平台。The two opening and closing brackets can be respectively flipped around the side of the corresponding bottom fixed frame near the cover beam, and the two flipped open and closed brackets are joined together to form a horizontal platform, and the two horizontal platforms and the two bottom fixed frames are common. A prestressed tension construction platform is formed.

同时,开合支架也可翻转至与底层固定框架相垂直的位置,作为检测平台的护栏使用。At the same time, the opening and closing bracket can also be turned to a position perpendicular to the bottom fixed frame to be used as a guardrail for the detection platform.

进一步地,所述的开合支架的结构为桁架结构。Further, the structure of the opening and closing bracket is a truss structure.

所述的开合支架由多个焊接连接的钢管制成,并组成桁架结构,使开合支架具有较好的支撑强度及较轻的结构质量。The opening and closing bracket is made of a plurality of welded steel pipes and forms a truss structure, so that the opening and closing bracket has better supporting strength and lighter structural quality.

作为优选的技术方案,所述的开合支架上所用钢管为Q235

Figure BDA0002234346100000031
钢管。As a preferred technical solution, the steel pipe used on the opening and closing bracket is Q235
Figure BDA0002234346100000031
Steel Pipe.

进一步地,所述的开合支架与相应的底层固定框架之间设有铰支座,所述的开合支架通过铰支座与底层固定框架相铰接;Further, a hinge support is provided between the opening and closing support and the corresponding bottom fixed frame, and the opening and closing support is hinged with the bottom fixed frame through the hinge support;

所述的开合支架组件中的2个开合支架之间设有盘扣,并通过盘扣可拆卸连接。Disk buckles are arranged between the two opening and closing brackets in the opening and closing bracket assembly, and are detachably connected through the plate buckles.

所述的开合支架绕铰支座翻转至水平位置,再通过盘扣与另一个开合支架连接,组成横向平台。The opening and closing bracket is turned around the hinge support to a horizontal position, and then connected with another opening and closing bracket through a disk buckle to form a horizontal platform.

作为优选的技术方案,所述的横向平台上设有横向支撑踏板,并通过细钢丝与开合支架固定连接。As a preferred technical solution, the lateral platform is provided with a lateral support pedal, which is fixedly connected to the opening and closing bracket through a thin wire.

进一步地,所述的铰支座包括设于底层固定框架上的底座、设于底座上的转轴、套设于转轴上的套筒、设于套筒上的连接杆以及设于底座上并位于转轴两侧的限位板,所述的连接杆的一端与相应的开合支架固定连接。Further, the hinge support includes a base set on the bottom fixed frame, a rotating shaft set on the base, a sleeve set on the rotating shaft, a connecting rod set on the sleeve, and a base set on the base and located in the The limit plates on both sides of the rotating shaft, one end of the connecting rod is fixedly connected with the corresponding opening and closing bracket.

所述的套筒可绕转轴转动,从而带动连接杆,以及与连接杆固定连接的开合支架转动,进而实现开合支架绕底层固定框架翻转;所述的限位板用于限制连接杆的转动范围,并且当开合支架翻转至水平位置时,限位板还可作为支撑板,支撑连接杆及开合支架。The sleeve can rotate around the rotating shaft, thereby driving the connecting rod and the opening and closing bracket fixedly connected with the connecting rod to rotate, thereby realizing the flipping of the opening and closing bracket around the bottom fixed frame; the limit plate is used to limit the movement of the connecting rod. When the opening and closing bracket is turned to a horizontal position, the limit plate can also be used as a supporting plate to support the connecting rod and the opening and closing bracket.

作为优选的技术方案,所述的转轴两侧至少分别布设2个限位板。As a preferred technical solution, at least two limit plates are respectively arranged on both sides of the rotating shaft.

作为优选的技术方案,底层固定框架上的纵向梁设于横向梁之上,所述的底层固定框架上通过螺栓连接或焊接连接的方式布设有多个铰支座,多个铰支座均设于纵向梁上,并分别位于相应第二横向梁的正上方。As a preferred technical solution, the longitudinal beams on the bottom fixed frame are arranged on the transverse beams, and the bottom fixed frame is provided with a plurality of hinge supports by means of bolt connection or welding connection, and the plurality of hinge supports are provided with on the longitudinal beams, and are respectively located just above the corresponding second transverse beams.

进一步地,所述的提升悬吊系统包括分别设于盖梁上的多个卷扬机以及设于卷扬机与底层固定平台之间的传动绳。Further, the hoisting and suspending system includes a plurality of hoists respectively arranged on the cover beams and a transmission rope arranged between the hoists and the bottom fixed platform.

所述的多个卷扬机可通过同步向上收绳或向下放绳的方式将平台提升或降低,来适应不同位置线型的预应力束张拉施工以及必要的构件运输。The multiple hoists can lift or lower the platform by synchronously taking up ropes upwards or releasing ropes downwards, so as to adapt to the prestressed beam tensioning construction of different positions and lines and necessary component transportation.

作为优选的技术方案,所述的传动绳采用

Figure BDA0002234346100000041
的钢丝绳,所述的钢丝绳至少为4根,所述的底层固定框架上设有与钢丝绳相适配的吊点,所述的钢丝绳的一端系于相应的吊点上,另一端绕设于相应的卷扬机上;所述的吊点分别位于底层固定框架最外侧的纵向梁上,并关于盖梁的横向及纵向中心向对称布设。As a preferred technical solution, the transmission rope adopts
Figure BDA0002234346100000041
There are at least 4 steel wire ropes, and the bottom fixed frame is provided with a hanging point that matches the wire rope, one end of the wire rope is tied to the corresponding hanging point, and the other end is wound around the corresponding hanging point. on the hoist; the lifting points are respectively located on the outermost longitudinal beams of the bottom fixed frame, and are symmetrically arranged with respect to the lateral and longitudinal center of the cover beam.

进一步地,所述的检修锚固系统包括设于底层固定框架上并与盖梁相适配的多个锚固板,所述的锚固板上开设有预留孔。Further, the maintenance anchoring system includes a plurality of anchoring plates arranged on the bottom fixed frame and matched with the cover beam, and the anchoring plates are provided with reserved holes.

所述的多个锚固板分别沿竖直方向焊接在底层固定框架靠近盖梁一侧的纵向梁上,并沿水平方向等间距布设;当2个底层固定框架分别升至盖梁的两侧时,通过将螺栓穿过锚固板上的预留孔并固定于盖梁上,使底层固定框架作为盖梁检修平台与盖梁固定连接。The plurality of anchor plates are respectively welded on the longitudinal beams of the bottom fixed frame close to the cover beam in the vertical direction, and are arranged at equal intervals in the horizontal direction; when the two bottom fixed frames are respectively raised to the two sides of the cover beam , By passing the bolts through the reserved holes on the anchor plate and fixing them on the cover beam, the bottom fixed frame is used as the cover beam maintenance platform to be fixedly connected with the cover beam.

作为优选的技术方案,所述的锚固板由钢板或工12.6型钢焊接组成。As a preferred technical solution, the anchor plate is composed of welded steel plates or 12.6-shaped steel.

工作原理:使用时,首先在地面上组装底层固定框架与开合支架,铺设支撑踏板,装设护栏,确定吊点与卷扬机布设位置,放下开合支架,通过盘扣扣件将两个开合支架连接组成横向平台,并与底层固定框架共同组成预应力张拉施工平台,然后通过卷扬机及传动绳将施工平台整体抬升起吊至盖梁外周,进行盖梁预应力张拉施工;Working principle: When using, first assemble the bottom fixed frame and the opening and closing bracket on the ground, lay the supporting pedal, install the guardrail, determine the hanging point and the position of the hoist, put down the opening and closing bracket, and open and close the two through the buckle fastener. The brackets are connected to form a horizontal platform, and together with the bottom fixed frame, a prestressed tension construction platform is formed, and then the construction platform is lifted and hoisted to the outer periphery of the cover beam by the winch and the transmission rope, and the cover beam prestressed tension construction is carried out;

当预应力张拉施工完成后,将施工平台下降至地面,拆除开合支架之间的盘扣扣件及开合支架部分的护栏,然后将开合支架转动90°至与底层固定框架相垂直并固定,或者将开合支架转动180°置于底层固定框架上,然后再通过卷扬机或汽车吊与卷扬机配合将2个底层固定框架分别升起至盖梁两侧,通过检修平台锚固系统锚固在盖梁上,增设爬梯,至此平台即转换为检修平台;When the prestressed tensioning construction is completed, lower the construction platform to the ground, remove the buckle fasteners between the opening and closing brackets and the guardrail on the opening and closing brackets, and then turn the opening and closing brackets 90° to be perpendicular to the bottom fixed frame And fix it, or turn the opening and closing bracket 180° and place it on the bottom fixed frame, and then lift the two bottom fixed frames to the two sides of the cover beam respectively through the winch or the car crane and the winch, and anchor them on the anchoring system of the maintenance platform. On the cover beam, a ladder is added, and the platform is converted into a maintenance platform;

此外,在转换为检修平台时,开合支架可以连同铰支座一并全部拆除并增设防护措施,拆除的支架可以重复利用至其他平台;或者如上所述将开合支架收起,以便之后可再次转换为预应力张拉施工平台用于检修预应力筋以及盖梁横侧面。In addition, when converting into a maintenance platform, the opening and closing brackets can be removed together with the hinge support and additional protection measures are added, and the removed brackets can be reused to other platforms; It is converted into a prestressed tension construction platform again for overhauling the prestressed tendons and the lateral sides of the cover beams.

与现有技术相比,本发明具有以下特点:Compared with the prior art, the present invention has the following characteristics:

1)相较于传统施工脚手架与施工检修平台,本发明结构简单新颖、便于组装拆卸,具有一定程度的可推广性;1) Compared with traditional construction scaffolding and construction maintenance platform, the present invention has a simple and novel structure, is easy to assemble and disassemble, and has a certain degree of generalizability;

2)本发明将施工平台与检修平台融合,有利于节约施工支架材料、减少搭建过程的工作量,进而提高施工过程与检修过程的工作效率以及施工质量。2) The present invention integrates the construction platform and the maintenance platform, which is beneficial to save construction support materials, reduce the workload of the construction process, and further improve the work efficiency and construction quality of the construction process and the maintenance process.

附图说明Description of drawings

图1为本发明中底层固定平台与开合支架系统的俯视结构示意图;Fig. 1 is the top-view structure schematic diagram of bottom fixed platform and opening and closing support system in the present invention;

图2为开合支架系统的俯视结构示意图;Fig. 2 is the top-view structure schematic diagram of the opening and closing bracket system;

图3为本发明中一种可升降可开合的盖梁施工检修多用途平台在开合支架竖起时的左视图;Figure 3 is a left side view of a liftable and openable cover beam construction and maintenance multi-purpose platform in the present invention when the open and close support is erected;

图4为设于盖梁工字钢梁上的卷扬机的结构示意图;Fig. 4 is the structural representation of the hoist that is arranged on the cover beam I-beam;

图5为铰支座的结构示意图;Fig. 5 is the structural representation of hinge support;

图中标记说明:Description of marks in the figure:

1-底层固定框架、101-纵向梁、102-第一横向梁、103-第二横向梁、2-开合支架、3-铰支座、301-底座、302-转轴、303-套筒、304-限位板、305-连接杆、306-底座螺栓、4-卷扬机、5-传动绳、6-锚固板、7-工字钢梁、8-护栏。1- bottom fixed frame, 101-longitudinal beam, 102-first transverse beam, 103-second transverse beam, 2-opening and closing bracket, 3-hinge support, 301-base, 302-rotating shaft, 303-sleeve, 304-limiting plate, 305-connecting rod, 306-base bolt, 4-hoist, 5-transmission rope, 6-anchor plate, 7-I-beam, 8-guardrail.

具体实施方式Detailed ways

下面结合附图和具体实施例对本发明进行详细说明。本实施例以本发明技术方案为前提进行实施,给出了详细的实施方式和具体的操作过程,但本发明的保护范围不限于下述的实施例。The present invention will be described in detail below with reference to the accompanying drawings and specific embodiments. This embodiment is implemented on the premise of the technical solution of the present invention, and provides a detailed implementation manner and a specific operation process, but the protection scope of the present invention is not limited to the following embodiments.

实施例1:Example 1:

如图3所示的一种可升降可开合的盖梁施工检修多用途平台,包括底层固定平台、分别设于底层固定平台上的开合支架系统及检修锚固系统,以及与底层固定平台传动连接的提升悬吊系统。As shown in Figure 3, a multi-purpose platform for construction and maintenance of cover beams that can be lifted and opened, includes a bottom fixed platform, an opening and closing bracket system and a maintenance anchor system respectively set on the bottom fixed platform, and a transmission with the bottom fixed platform. Connected hoist suspension system.

其中,在底层固定平台的周边焊接有由工12.6型钢的立柱与

Figure BDA0002234346100000051
的钢管穿插组装而成的护栏8,护栏立柱等间距布设。Among them, the perimeter of the bottom fixed platform is welded with a column made of I 12.6 steel and
Figure BDA0002234346100000051
The guardrail 8 is assembled by interspersing the steel pipes, and the guardrail columns are arranged at equal intervals.

底层固定平台包括对称布设于盖梁两侧的2个底层固定框架1,每个底层固定框架1的长度均比盖梁长度长4-6m,宽度均为1.5-1.6m。The bottom fixed platform includes two bottom fixed frames 1 symmetrically arranged on both sides of the cover beam. The length of each bottom fixed frame 1 is 4-6m longer than that of the cover beam, and the width is 1.5-1.6m.

如图1所示的底层固定框架1包括平行于盖梁长度方向设置的3个由工12.6型钢制成的纵向梁101以及与纵向梁101垂直设置的多个由工25型钢制成的横向梁机构,横向梁机构包括一对第二横向梁组件以及多个等间距并列设置在两第二横向梁组件之间的第一横向梁102,第二横向梁组件包括多个等间距布设的第二横向梁103,第一横向梁102沿纵向梁101长度方向上的分布范围与盖梁长度相适配,第二横向梁103布设于第一横向梁102分布范围的两端,且多个第一横向梁102之间的间距大于多个第二横向梁103之间的间距。The bottom fixed frame 1 as shown in FIG. 1 includes three longitudinal beams 101 made of I-12.6 section steel arranged parallel to the length direction of the cover beams and a plurality of transverse beams made of I-25 section steel arranged perpendicular to the longitudinal beams 101 The transverse beam mechanism includes a pair of second transverse beam assemblies and a plurality of first transverse beams 102 arranged in parallel between the two second transverse beam assemblies at equal intervals. The second transverse beam assembly includes a plurality of second transverse beam assemblies arranged at equal intervals. The transverse beam 103, the distribution range of the first transverse beam 102 along the longitudinal direction of the longitudinal beam 101 is adapted to the length of the cover beam, the second transverse beam 103 is arranged at both ends of the distribution range of the first transverse beam 102, and a plurality of first transverse beams 102 are arranged. The spacing between the transverse beams 102 is greater than the spacing between the plurality of second transverse beams 103 .

开合支架系统包括一前一后分别设于2个底层固定框架1之间的2个开合支架组件,开合支架组件包括分别与2个底层固定框架1一端相铰接的如图2所示的2个开合支架2。这2个开合支架2均为由Q235

Figure BDA0002234346100000062
钢管制成的桁架结构,并分别通过相应的铰支座3实现绕相应的底层固定框架1上靠近盖梁一侧翻转,翻转至水平位置的2个开合支架2通过盘扣拼接组成横向平台。在2个横向平台与2个底层固定框架1上铺设支撑踏板,并通过细钢丝固定,组成预应力张力施工平台。如图5所示,铰支座3包括设于底层固定框架1上的底座301、设于底座301上的转轴302、套设于转轴302上的套筒303、设于套筒303上的连接杆305以及分别设于底座301上并位于转轴302两侧3个限位板304,连接杆305的一端与相应的开合支架2固定连接。The opening and closing bracket system includes two opening and closing bracket assemblies which are respectively arranged between the two bottom fixed frames 1 in tandem. The 2 opening and closing brackets 2. These 2 opening and closing brackets 2 are made of Q235
Figure BDA0002234346100000062
The truss structure is made of steel pipes, and is flipped around the corresponding bottom fixed frame 1 on the side close to the cover beam through the corresponding hinge supports 3 respectively, and the two opening and closing brackets 2 flipped to the horizontal position are spliced to form a horizontal platform through the buckle. . Support pedals are laid on 2 lateral platforms and 2 bottom fixed frames 1 and fixed by thin steel wires to form a prestressed tension construction platform. As shown in FIG. 5 , the hinge support 3 includes a base 301 disposed on the bottom fixed frame 1 , a rotating shaft 302 disposed on the base 301 , a sleeve 303 sleeved on the rotating shaft 302 , and a connection disposed on the sleeve 303 The rod 305 and the three limiting plates 304 are respectively disposed on the base 301 and located on both sides of the rotating shaft 302 , and one end of the connecting rod 305 is fixedly connected with the corresponding opening and closing bracket 2 .

如图4所示,提升悬吊系统包括4个分别设于盖梁顶端两侧面工字钢梁7上的卷扬机4以及4根分别设于相应卷扬机4与底层固定平台之间的传动绳5,传动绳5采用

Figure BDA0002234346100000061
的钢丝绳,钢丝绳的一端系于底层固定框架1上的相应吊点上,另一端绕设于相应的卷扬机4上,4个卷扬机4同步工作,实现平台的稳定升降;吊点分别位于底层固定框架1最外侧的纵向梁101上,并且4个吊点及卷扬机4分别关于盖梁的横向及纵向中心线对称布设。As shown in Figure 4, the hoisting and suspension system includes four hoists 4 which are respectively arranged on the I-beam 7 on both sides of the top of the cover beam, and four transmission ropes 5 which are respectively arranged between the corresponding hoists 4 and the bottom fixed platform, Transmission rope 5 adopts
Figure BDA0002234346100000061
One end of the wire rope is tied to the corresponding lifting point on the bottom fixed frame 1, and the other end is wound on the corresponding winch 4, and the four winches 4 work synchronously to realize the stable lifting of the platform; the lifting points are respectively located on the bottom fixed frame 1. On the outermost longitudinal beam 101, and the 4 lifting points and the hoisting machine 4 are respectively arranged symmetrically with respect to the lateral and longitudinal centerlines of the cover beam.

检修锚固系统包括设于底层固定框架1上并与盖梁相适配的多个锚固板6,锚固板6由钢板或工12.6型钢焊接组成并开设有多个预留孔。多个锚固板6分别沿竖直方向焊接在底层固定框架1靠近盖梁一侧的纵向梁101上,并沿水平方向等间距布设。The maintenance anchoring system includes a plurality of anchoring plates 6 arranged on the bottom fixed frame 1 and matched with the cover beams. The anchoring plates 6 are composed of welded steel plates or 12.6 steel and have a plurality of reserved holes. A plurality of anchor plates 6 are respectively welded to the longitudinal beams 101 of the bottom fixed frame 1 near the cover beam in the vertical direction, and are arranged at equal intervals in the horizontal direction.

工作原理:使用时,首先在地面上组装底层固定框架1与开合支架2,装设护栏8,确定吊点与卷扬机4布设位置,放下开合支架2,通过盘扣扣件将两个开合支架2连接组成横向平台,并在底层固定框架1与横向平台上铺设支撑踏板,组成预应力张拉施工平台,然后通过卷扬机4及传动绳5将施工平台整体抬升起吊至盖梁外周,进行盖梁预应力张拉施工;Working principle: When using, first assemble the bottom fixed frame 1 and the opening and closing bracket 2 on the ground, install the guardrail 8, determine the placement position of the lifting point and the hoist 4, put down the opening and closing bracket 2, and connect the two The combined support 2 is connected to form a horizontal platform, and support pedals are laid on the bottom fixed frame 1 and the horizontal platform to form a prestressed tension construction platform, and then the construction platform is lifted and hoisted to the outer circumference of the cover beam by the hoist 4 and the transmission rope 5. Cover beam prestressed tension construction;

当预应力张拉施工完成后,将施工平台下降至地面,拆除开合支架2之间的盘扣扣件及开合支架2部分的护栏,然后将开合支架2转动90°至与底层固定框架1相垂直并固定,或者将开合支架2转动180°置于底层固定框架1上,然后再通过卷扬机4或汽车吊与卷扬机4配合将2个底层固定框架1分别升起至盖梁两侧,通过检修平台锚固系统锚固在盖梁上,增设爬梯,即得到检修平台;When the prestressed tensioning construction is completed, lower the construction platform to the ground, remove the buckle fasteners between the opening and closing brackets 2 and the guardrail of the opening and closing brackets 2, and then turn the opening and closing brackets 2 by 90° to be fixed with the bottom layer. The frame 1 is vertical and fixed, or the opening and closing bracket 2 is rotated 180° and placed on the bottom fixed frame 1, and then the two bottom fixed frames 1 are lifted to the two bottom of the cover beam by the winch 4 or the car crane and the winch 4 respectively. On the side, the maintenance platform is anchored on the cover beam through the maintenance platform anchoring system, and a climbing ladder is added to obtain the maintenance platform;

此外,在施工平台转换为检修平台时,开合支架可以连同铰支座一并全部拆除并增设防护措施,拆除的支架可以重复利用至其他平台;或者如上所述将开合支架收起,以便之后可再次转换为预应力张拉施工平台用于检修预应力筋以及盖梁横侧面。In addition, when the construction platform is converted into a maintenance platform, the opening and closing brackets can be completely removed together with the hinge support, and protective measures can be added, and the removed brackets can be reused to other platforms; Afterwards, it can be converted into a prestressed tension construction platform again for overhauling the prestressed tendons and the lateral sides of the cover beams.

上述的对实施例的描述是为便于该技术领域的普通技术人员能理解和使用发明。熟悉本领域技术的人员显然可以容易地对这些实施例做出各种修改,并把在此说明的一般原理应用到其他实施例中而不必经过创造性的劳动。因此,本发明不限于上述实施例,本领域技术人员根据本发明的揭示,不脱离本发明范畴所做出的改进和修改都应该在本发明的保护范围之内。The foregoing description of the embodiments is provided to facilitate understanding and use of the invention by those of ordinary skill in the art. It will be apparent to those skilled in the art that various modifications to these embodiments can be readily made, and the generic principles described herein can be applied to other embodiments without inventive step. Therefore, the present invention is not limited to the above-mentioned embodiments, and improvements and modifications made by those skilled in the art according to the disclosure of the present invention without departing from the scope of the present invention should all fall within the protection scope of the present invention.

Claims (10)

1.一种可升降可开合的盖梁施工检修多用途平台,其特征在于,该装置包括底层固定平台、分别设于底层固定平台上的开合支架系统及检修锚固系统,以及与底层固定平台传动连接的提升悬吊系统。1. a multi-purpose platform for construction and maintenance of cover beams that can be lifted and closed, is characterized in that, this device comprises bottom fixed platform, opening and closing support system and maintenance anchoring system respectively arranged on bottom fixed platform, and fixed with bottom layer. Lifting suspension system connected by platform drive. 2.根据权利要求1所述的一种可升降可开合的盖梁施工检修多用途平台,其特征在于,所述的底层固定平台包括分别设置在盖梁两侧的2个底层固定框架(1),所述的开合支架系统设置在2个底层固定框架(1)之间。2. A kind of liftable and openable cover beam construction and maintenance multipurpose platform according to claim 1, is characterized in that, described bottom fixed platform comprises 2 bottom fixed frames ( 1), the opening and closing bracket system is arranged between the two bottom fixed frames (1). 3.根据权利要求2所述的一种可升降可开合的盖梁施工检修多用途平台,其特征在于,所述的底层固定框架(1)的长度比盖梁长度长4-6m,所述的底层固定框架(1)的宽度为1.5-1.6m。3. A kind of liftable and openable cover beam construction and maintenance multi-purpose platform according to claim 2, characterized in that, the length of the bottom fixed frame (1) is 4-6m longer than the cover beam length, so the The width of the bottom fixed frame (1) is 1.5-1.6m. 4.根据权利要求3所述的一种可升降可开合的盖梁施工检修多用途平台,其特征在于,所述的底层固定框架(1)包括平行于盖梁长度方向设置的多个纵向梁(101)以及与纵向梁(101)垂直设置的横向梁机构,所述的横向梁机构包括一对第二横向梁组件以及多个并列设置在两第二横向梁组件之间的第一横向梁(102),所述的第二横向梁组件包括多个第二横向梁(103)。4. The multi-purpose platform for lifting and closing the cover beam construction and maintenance according to claim 3, wherein the bottom fixed frame (1) comprises a plurality of longitudinal directions parallel to the length direction of the cover beam A beam (101) and a transverse beam mechanism arranged perpendicular to the longitudinal beam (101), the transverse beam mechanism comprising a pair of second transverse beam assemblies and a plurality of first transverse beams arranged in parallel between the two second transverse beam assemblies A beam (102), the second transverse beam assembly includes a plurality of second transverse beams (103). 5.根据权利要求2所述的一种可升降可开合的盖梁施工检修多用途平台,其特征在于,所述的开合支架系统包括一前一后分别设于2个底层固定框架(1)之间的2个开合支架组件,所述的开合支架组件包括分别与2个底层固定框架(1)一端相铰接的2个开合支架(2)。5. A kind of liftable and openable cover beam construction and maintenance multi-purpose platform according to claim 2, is characterized in that, described open and close bracket system comprises a front and a back are respectively provided in 2 bottom fixed frames ( 1) between two opening and closing bracket assemblies, the said opening and closing bracket assembly includes two opening and closing brackets (2) hinged with one end of the two bottom fixed frames (1) respectively. 6.根据权利要求5所述的一种可升降可开合的盖梁施工检修多用途平台,其特征在于,所述的开合支架(2)的结构为桁架结构。6 . The multi-purpose platform for construction and maintenance of cover beams that can be lifted and opened according to claim 5 , wherein the structure of the opening and closing bracket ( 2 ) is a truss structure. 7 . 7.根据权利要求5所述的一种可升降可开合的盖梁施工检修多用途平台,其特征在于,所述的开合支架(2)与相应的底层固定框架(1)之间设有铰支座(3),所述的开合支架(2)通过铰支座(3)与底层固定框架(1)相铰接;7. A multi-purpose platform for lifting and closing cover beam construction and maintenance according to claim 5, characterized in that, between the opening and closing bracket (2) and the corresponding bottom fixed frame (1) There is a hinge support (3), and the opening and closing support (2) is hinged with the bottom fixed frame (1) through the hinge support (3); 所述的开合支架组件中的2个开合支架(2)之间设有盘扣,并通过盘扣可拆卸连接。Disk buckles are arranged between the two opening and closing brackets (2) in the opening and closing bracket assembly, and are detachably connected through the plate buckles. 8.根据权利要求7所述的一种可升降可开合的盖梁施工检修多用途平台,其特征在于,所述的铰支座(3)包括设于底层固定框架(1)上的底座(301)、设于底座(301)上的转轴(302)、套设于转轴(302)上的套筒(303)、设于套筒(303)上的连接杆(305)以及设于底座(301)上并位于转轴(302)两侧的限位板(304),所述的连接杆(305)的一端与相应的开合支架(2)固定连接。8 . The multi-purpose platform for lifting and closing cover beam construction and maintenance according to claim 7 , wherein the hinge support ( 3 ) comprises a base set on the bottom fixed frame ( 1 ). 9 . (301), a rotating shaft (302) set on the base (301), a sleeve (303) set on the rotating shaft (302), a connecting rod (305) set on the sleeve (303), and a connecting rod (305) set on the base (301) Limiting plates (304) located on both sides of the rotating shaft (302), one end of the connecting rod (305) is fixedly connected with the corresponding opening and closing bracket (2). 9.根据权利要求2所述的一种可升降可开合的盖梁施工检修多用途平台,其特征在于,所述的提升悬吊系统包括分别设于盖梁上的多个卷扬机(4)以及设于卷扬机(4)与底层固定平台之间的传动绳(5)。9 . The multi-purpose platform for lifting and closing the cover beam for construction and maintenance according to claim 2 , wherein the lifting and suspending system comprises a plurality of hoists (4) respectively arranged on the cover beam. 10 . and a transmission rope (5) arranged between the hoisting machine (4) and the bottom fixed platform. 10.根据权利要求2所述的一种可升降可开合的盖梁施工检修多用途平台,其特征在于,所述的检修锚固系统包括设于底层固定框架(1)上并与盖梁相适配的多个锚固板(6),所述的锚固板(6)上开设有预留孔。10. A multi-purpose platform for lifting and closing cover beam construction and maintenance according to claim 2, characterized in that the maintenance anchoring system comprises a fixed frame (1) on the bottom layer and is adapted to the cover beam A plurality of anchoring plates (6) are provided, and the anchoring plates (6) are provided with reserved holes.
CN201910978197.9A 2019-10-15 2019-10-15 Liftable and openable bent cap construction overhaul multipurpose platform Expired - Fee Related CN110820564B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910978197.9A CN110820564B (en) 2019-10-15 2019-10-15 Liftable and openable bent cap construction overhaul multipurpose platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910978197.9A CN110820564B (en) 2019-10-15 2019-10-15 Liftable and openable bent cap construction overhaul multipurpose platform

Publications (2)

Publication Number Publication Date
CN110820564A true CN110820564A (en) 2020-02-21
CN110820564B CN110820564B (en) 2021-03-26

Family

ID=69549409

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910978197.9A Expired - Fee Related CN110820564B (en) 2019-10-15 2019-10-15 Liftable and openable bent cap construction overhaul multipurpose platform

Country Status (1)

Country Link
CN (1) CN110820564B (en)

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001329686A (en) * 2000-05-22 2001-11-30 Taisei Corp How to build a scaffold for working at height
CN201221193Y (en) * 2008-06-17 2009-04-15 北京城建集团有限责任公司 High altitude packway ceiling construction operating platform
CN204212070U (en) * 2014-10-16 2015-03-18 武汉二航路桥特种工程有限责任公司 Can the inspection platform of way moving under uninterrupted traffic condition
US20150166198A1 (en) * 2013-04-15 2015-06-18 Clifford R. Hokanson Adjustable aircraft maintenance platform for improving efficiency and safety of aircraft maintenance operations
CN204552048U (en) * 2015-04-17 2015-08-12 江西鸿昊建设有限公司 A kind of portable building buckle formula scaffold
WO2015131228A1 (en) * 2014-03-04 2015-09-11 Form 700 Pty Ltd A container for framework elements
CN205088574U (en) * 2015-10-08 2016-03-16 中国水利水电第十四工程局有限公司 A operation platform that is used for high pier binder, bent cap construction usefulness
CN205804178U (en) * 2016-01-19 2016-12-14 四川西南交大土木工程设计有限公司 Scalable without holder device for the liftable of bridge coping construction
CN205934735U (en) * 2016-08-14 2017-02-08 中国建筑第六工程局有限公司 A operation platform for stretch -draw of cantilever bent cap
CN206052555U (en) * 2016-08-17 2017-03-29 中国建筑第六工程局有限公司 Hood type safe operation platform
CN106638299A (en) * 2017-01-18 2017-05-10 湖南瑞涪科技实业有限公司 Multifunctional operation platform and construction method
CN106906756A (en) * 2017-04-26 2017-06-30 武汉二航路桥特种工程有限责任公司 Can Fast Installation remove maintenance operation platform and its construction method
CN107313360A (en) * 2017-07-18 2017-11-03 南昌大学 Overhead cable formula is without support bearing replacement operating platform
CN207619847U (en) * 2017-07-24 2018-07-17 广东腾盛模架科技有限公司 Column and Coping Construction assembled adjustable operating platform
CN108824194A (en) * 2018-06-12 2018-11-16 中铁十二局集团有限公司 Bent cap post-stretching blocks construction trolley
CN109267500A (en) * 2018-07-25 2019-01-25 广东长大道路养护有限公司 Bridge maintaining lift truss work platform
CN208604961U (en) * 2018-05-24 2019-03-15 中天建设集团有限公司 A kind of edge protection bracket of reversible

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001329686A (en) * 2000-05-22 2001-11-30 Taisei Corp How to build a scaffold for working at height
CN201221193Y (en) * 2008-06-17 2009-04-15 北京城建集团有限责任公司 High altitude packway ceiling construction operating platform
US20150166198A1 (en) * 2013-04-15 2015-06-18 Clifford R. Hokanson Adjustable aircraft maintenance platform for improving efficiency and safety of aircraft maintenance operations
WO2015131228A1 (en) * 2014-03-04 2015-09-11 Form 700 Pty Ltd A container for framework elements
CN204212070U (en) * 2014-10-16 2015-03-18 武汉二航路桥特种工程有限责任公司 Can the inspection platform of way moving under uninterrupted traffic condition
CN204552048U (en) * 2015-04-17 2015-08-12 江西鸿昊建设有限公司 A kind of portable building buckle formula scaffold
CN205088574U (en) * 2015-10-08 2016-03-16 中国水利水电第十四工程局有限公司 A operation platform that is used for high pier binder, bent cap construction usefulness
CN205804178U (en) * 2016-01-19 2016-12-14 四川西南交大土木工程设计有限公司 Scalable without holder device for the liftable of bridge coping construction
CN205934735U (en) * 2016-08-14 2017-02-08 中国建筑第六工程局有限公司 A operation platform for stretch -draw of cantilever bent cap
CN206052555U (en) * 2016-08-17 2017-03-29 中国建筑第六工程局有限公司 Hood type safe operation platform
CN106638299A (en) * 2017-01-18 2017-05-10 湖南瑞涪科技实业有限公司 Multifunctional operation platform and construction method
CN106906756A (en) * 2017-04-26 2017-06-30 武汉二航路桥特种工程有限责任公司 Can Fast Installation remove maintenance operation platform and its construction method
CN107313360A (en) * 2017-07-18 2017-11-03 南昌大学 Overhead cable formula is without support bearing replacement operating platform
CN207619847U (en) * 2017-07-24 2018-07-17 广东腾盛模架科技有限公司 Column and Coping Construction assembled adjustable operating platform
CN208604961U (en) * 2018-05-24 2019-03-15 中天建设集团有限公司 A kind of edge protection bracket of reversible
CN108824194A (en) * 2018-06-12 2018-11-16 中铁十二局集团有限公司 Bent cap post-stretching blocks construction trolley
CN109267500A (en) * 2018-07-25 2019-01-25 广东长大道路养护有限公司 Bridge maintaining lift truss work platform

Also Published As

Publication number Publication date
CN110820564B (en) 2021-03-26

Similar Documents

Publication Publication Date Title
CN106276631B (en) A kind of roof hanging device and dismantling method of crane and boom
CN115506604B (en) Method for installing first truss of large-span steel structure
CN112575948B (en) A roof truss composed of a string beam and a cantilever truss and a construction method thereof
CN110469106A (en) A kind of high rise elevator well jacking formwork system and its construction method
CN110685433A (en) Chimney construction device and construction method applying hydraulic lifting and rollover technology
CN111519545A (en) Pier and capping beam integrated construction platform and construction method thereof
CN116043713A (en) A Method for Erection of Steel Girders of Suspension Bridge by Vertical Assembly and Lifting in Air
CN210798252U (en) Assembled outer protection frame system
CN110468743B (en) A mobile hanger and construction method for the renovation of old bridge pier caps
CN106284103A (en) Steel reinforced concrete combination beam roof steel bar concrete high-altitude cantilever pouring construction method
CN201362953Y (en) Construction platform for pouring concrete silo roof
CN105888227A (en) Ultrahigh horn-shaped steel structure exterior facing construction platform, equalizing beam for construction and construction method of ultrahigh horn-shaped steel structure exterior facing construction platform
CN210288140U (en) A simple prefabricated bridge deck hoisting trolley
CN210460016U (en) Integrated form single power lift material platform
CN209456892U (en) Cable-stayed bridge steel overhangs structure of sidewalk
CN110905261A (en) Ultra-large-span closed stock ground structure for multiple material piling and taking machines and construction method thereof
CN211691716U (en) Large-span closed stockyard structure for multiple stackers and reclaimers
CN113062584A (en) Multipoint elevator shaft construction lifting platform and construction method
CN108797350B (en) Tower column inner and outer stiff skeleton device and construction method thereof
CN214531431U (en) Truss combination roof truss of opening string roof beam and encorbelmenting
CN110820564A (en) Liftable and openable bent cap construction overhaul multipurpose platform
CN217627283U (en) Asynchronous hanging basket with triangular truss type hoisting equipment
CN107700363B (en) A bridge tower platform with self-contained lifting system and its construction method
CN110552495A (en) assembled building combined tool type outer protective frame system and construction method thereof
CN207062787U (en) Can Fast Installation remove maintenance construction platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210326

CF01 Termination of patent right due to non-payment of annual fee