CN105982800A - Air cushion bed system, air inflation and deflation pressure regulating system and method - Google Patents

Air cushion bed system, air inflation and deflation pressure regulating system and method Download PDF

Info

Publication number
CN105982800A
CN105982800A CN201510096088.6A CN201510096088A CN105982800A CN 105982800 A CN105982800 A CN 105982800A CN 201510096088 A CN201510096088 A CN 201510096088A CN 105982800 A CN105982800 A CN 105982800A
Authority
CN
China
Prior art keywords
inflation
pressure value
pressure
deflation
air mattress
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510096088.6A
Other languages
Chinese (zh)
Other versions
CN105982800B (en
Inventor
刘实中
谢明亨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wellell Inc
Original Assignee
Apex Medical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Apex Medical Corp filed Critical Apex Medical Corp
Priority to CN201510096088.6A priority Critical patent/CN105982800B/en
Publication of CN105982800A publication Critical patent/CN105982800A/en
Application granted granted Critical
Publication of CN105982800B publication Critical patent/CN105982800B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mattresses And Other Support Structures For Chairs And Beds (AREA)

Abstract

本发明公开了一种气垫床系统、充泄气调压系统及其方法,充泄气调压系统应用于具有至少两气体管路的气垫床,所述充泄气调压系统包括充泄气装置、压力检测单元及控制单元。充泄气装置用以对气垫床充气或泄气;压力检测单元用以持续检测气垫床的即时压力值;控制单元用以依据压力检测单元于气垫床在一载重状态下所检测的即时压力值,判断即时压力值是否在设定时间前即已达到设定压力值;且控制单元将依据判断结果决定以第一充泄气策略或第二充泄气策略控制充泄气装置对气垫床的充气或泄气。

The present invention discloses an air mattress system, an inflation and deflation pressure regulating system and a method thereof. The inflation and deflation pressure regulating system is applied to an air mattress having at least two gas pipelines, and the inflation and deflation pressure regulating system comprises an inflation and deflation device, a pressure detection unit and a control unit. The inflation and deflation device is used to inflate or deflate the air mattress; the pressure detection unit is used to continuously detect the instantaneous pressure value of the air mattress; the control unit is used to determine whether the instantaneous pressure value has reached the set pressure value before the set time according to the instantaneous pressure value detected by the pressure detection unit when the air mattress is in a load state; and the control unit will determine whether to control the inflation and deflation device to inflate or deflate the air mattress according to the first inflation and deflation strategy or the second inflation and deflation strategy according to the judgment result.

Description

气垫床系统、充泄气调压系统及方法Air bed system, air inflation and pressure regulation system and method

技术领域technical field

本发明关于一种充泄气调压系统及方法,尤指一种可通过检测载重压力的变化来执行对应充泄气操作的充泄气调压系统及方法。本发明还包括应用所述充泄气调压系统的气垫床系统。The present invention relates to a gas filling and deflation pressure regulating system and method, in particular to a gas filling and deflation pressure regulating system and method which can perform corresponding filling and deflation operations by detecting changes in load pressure. The present invention also includes an air bed system using the air inflation and pressure regulating system.

背景技术Background technique

医疗级气垫床多用于长期卧病的病患,其具有减缓病患倒卧时的局部压力,并防止褥疮产生的效果。因此,气垫床通常在需要时,将充泄气装置通过气体传输管连接气垫床,使充泄气装置与气垫床构成气体连通,以便对气垫床进行充气或泄气操作。Medical-grade air mattresses are mostly used for long-term bedridden patients, which can relieve the local pressure of patients when lying down and prevent bedsores. Therefore, when needed, the air mattress usually connects the inflation and deflation device to the air mattress through the gas transmission pipe, so that the inflation and deflation device and the air mattress form gas communication, so as to inflate or deflate the air mattress.

由于每个病患体重并不相同,其躺卧时对气垫床所施加的压力会有差异,因此气垫床必须针对每个病患的条件及需求,调整内部的气体压力,以产生足够支撑力供承载病患身躯,并提供病患较舒适的躺卧环境。Since the weight of each patient is different, the pressure exerted on the air mattress will be different when lying down. Therefore, the air mattress must adjust the internal gas pressure according to the conditions and needs of each patient to generate sufficient support. It is used to carry the patient's body and provide a more comfortable lying environment for the patient.

现今气垫床大多是由多个气囊所构成,而通过两个独立气体管路的设计,使每个气体管路各自连通部分气囊,以加快充泄气速度及便于控制。而现有技术是先针对气垫床的两个独立气体管路一起充气至一定压力值,待病患躺卧在气垫床上,检测气垫床的压力变化,直到趋于稳定并持续一段长时间后(例如40秒),才通过此时压力值判断病患所对应的体重区间,进而调整气垫床应赋予的适当压力值。Today's air mattresses are mostly composed of multiple airbags, and through the design of two independent gas pipelines, each gas pipeline is connected to a part of the airbags to speed up the inflation and deflation speed and facilitate control. However, in the prior art, the two independent gas pipelines of the air bed are first inflated to a certain pressure value, and the patient is lying on the air bed to detect the pressure change of the air bed until it becomes stable and lasts for a long time ( For example, 40 seconds), then the pressure value at this time can be used to judge the corresponding weight range of the patient, and then adjust the appropriate pressure value that the air mattress should give.

然而,从病患躺卧气垫床到压力趋于稳定前,已耗掉不少时间,再加上需等待压力稳定后的持续时间,使得气垫床整体的调压过程的等待时间过长,不仅造成时间成本的浪费,且会带给使用者不佳的使用体验。据此,对于现有的气垫床的充泄气调压系统迫切需要进一步改进。However, it takes a lot of time for the patient to lie on the air bed until the pressure stabilizes. In addition, it takes a long time to wait for the pressure to stabilize, so the waiting time for the overall pressure adjustment process of the air bed is too long, not only It causes a waste of time and cost, and can bring users a bad experience. Accordingly, there is an urgent need for further improvement on the existing inflation and discharge air pressure regulating system of the air mattress.

发明内容Contents of the invention

本发明的目的在于提供一种可通过检测载重压力的变化,来执行对应充泄气操作的充泄气调压系统,以便能对气垫床较稳定且快速地调整压力值,符合目前病患的需求。The purpose of the present invention is to provide an inflation and deflation pressure regulation system that can perform corresponding inflation and deflation operations by detecting changes in load pressure, so as to adjust the pressure value of the air mattress more stably and quickly, and meet the needs of current patients.

为达到上述目的,本发明的充泄气调压系统,应用于具有至少两气体管路的气垫床,所述充泄气调压系统包括充泄气装置、压力检测单元及控制单元。充泄气装置用以对气垫床充气或泄气;压力检测单元用以持续检测气垫床的即时压力值;控制单元用以依据压力检测单元于气垫床在一载重状态下所检测的即时压力值,判断即时压力值是否在设定时间前即已达到设定压力值;若是,控制单元将以第一充泄气策略控制充泄气装置对气垫床的充气或泄气;若否,控制单元则以第二充泄气策略控制充泄气装置对气垫床的充气或泄气。In order to achieve the above purpose, the air inflation and pressure regulation system of the present invention is applied to an air bed with at least two gas pipelines, and the air inflation and pressure regulation system includes an inflation and deflation device, a pressure detection unit and a control unit. The inflation and deflation device is used to inflate or deflate the air mattress; the pressure detection unit is used to continuously detect the real-time pressure value of the air mattress; the control unit is used to judge according to the real-time pressure value detected by the pressure detection unit when the air mattress is in a load state Whether the immediate pressure value has reached the set pressure value before the set time; if so, the control unit will control the inflation or deflation of the air mattress by the first inflation and deflation strategy; if not, the control unit will use the second inflation strategy The deflation strategy controls the inflation or deflation of the air mattress by the deflation device.

本发明的充泄气调压方法,应用于前述的充泄气调压系统,所述方法包括以下步骤:执行自动检测充泄气程序,其中通过控制单元持续取得压力检测单元所检测到气垫床的即时压力值,并指示充泄气装置泄除气垫床的任一气体管路内的气体;通过控制单元判断气垫床在载重状态下的即时压力值是否在设定时间前即已达到设定压力值;若是,则控制单元决定采用气垫床的第一充泄气策略;以及若否,则控制单元决定采用气垫床的第二充泄气策略。The inflation and deflation pressure regulation method of the present invention is applied to the aforementioned inflation and deflation pressure regulation system, and the method includes the following steps: performing an automatic detection inflation and deflation program, wherein the instantaneous pressure of the air mattress detected by the pressure detection unit is continuously obtained by the control unit Value, and instruct the inflation and deflation device to release the gas in any gas pipeline of the air mattress; judge whether the immediate pressure value of the air mattress under the load state has reached the set pressure value before the set time through the control unit; if so , the control unit decides to adopt the first inflation and deflation strategy of the air mattress; and if not, the control unit decides to adopt the second inflation and deflation strategy of the air mattress.

本发明的气垫床系统,包括气垫床及前述的充泄气调压系统。气垫床包括第一气体管路及第二气体管路,第一气体管路包括第一内囊及第一外囊,第二气体管路包括第二内囊及第二外囊,第一外囊通过第一逆止阀连通第二内囊,且第二外囊通过第二逆止阀连通第一内囊。充泄气调压系统与气垫床形成气体连通,其中充泄气调压系统预先对第一气体管路及第二气体管路充气,使第一气体管路及第二气体管路均达到参考压力值。The air bed system of the present invention includes the air bed and the aforementioned air inflation and pressure regulating system. The air mattress includes a first gas pipeline and a second gas pipeline, the first gas pipeline includes a first inner bag and a first outer bag, the second gas pipeline includes a second inner bag and a second outer bag, and the first outer bag The bladder communicates with the second inner bladder through the first check valve, and the second outer bladder communicates with the first inner bladder through the second check valve. Inflatable and deflated air pressure regulating system forms gas communication with the air mattress, wherein the inflatable and deflated air pressure regulating system inflates the first gas pipeline and the second gas pipeline in advance, so that both the first gas pipeline and the second gas pipeline reach the reference pressure value .

与现有技术相比,本发明的有益效果在于:可在各气体管路保持外囊容积固定的条件下,对气垫床执行充泄气调压操作,更能提供气垫床的充泄气调压的准确性及效率。Compared with the prior art, the beneficial effect of the present invention is that: under the condition that each gas pipeline maintains a fixed volume of the outer bag, the operation of inflating and deflating the air-cushion and pressure-regulating can be performed on the air-cushion bed, and the air-cushion bed can be better provided accuracy and efficiency.

附图说明Description of drawings

图1为本发明的充泄气调压系统的系统方块图。Fig. 1 is a system block diagram of the inflation-discharging pressure regulating system of the present invention.

图2为本发明的充泄气调压方法第一实施例的流程图。Fig. 2 is a flow chart of the first embodiment of the inflation and discharge pressure regulation method of the present invention.

图3为本发明的充泄气调压方法第一实施例的自动检测压力程序的细节流程图。Fig. 3 is a detailed flow chart of the automatic pressure detection program of the first embodiment of the inflation and discharge pressure regulation method of the present invention.

图4为本发明的气垫床系统的系统方块图。FIG. 4 is a system block diagram of the air bed system of the present invention.

图5为本发明的气垫床系统的充泄气装置及气垫床之间管路连接状态的示意图。Fig. 5 is a schematic diagram of the connection state of the pipelines between the inflation and deflation device of the air bed system of the present invention and the air bed.

图6为本发明的充泄气调压方法第二实施例的局部流程图。FIG. 6 is a partial flow chart of the second embodiment of the method for regulating the pressure of inflation and discharge of the present invention.

具体实施方式detailed description

由于各种形式与实施例仅为例示性且非限制性,故在阅读本说明书后,本领域的技术人员可知在不偏离本发明的范围下,还可能有其他形式与实施例。根据下述的详细说明与权利要求书,将可使这些实施例的特征及优点更加明显。Since the various forms and embodiments are only illustrative and non-restrictive, those skilled in the art after reading this specification will know that other forms and embodiments are possible without departing from the scope of the present invention. The features and advantages of these embodiments will be more apparent from the following detailed description and claims.

于本文中,使用“一”或“一个”来描述本文所述的元件和组件。此举只是为了方便说明,并且对本发明的范畴提供一般性的意义。因此,除非很明显地另指他意,否则此种描述应理解为包括一个或至少一个,且单数也同时包括复数。Herein, "a" or "an" are used to describe elements and components described herein. This is done for convenience of description only and to provide a general sense of the scope of the invention. Accordingly, such description should be read to include one or at least one and the singular also includes the plural unless it is obvious that it is otherwise meant.

于本文中,用语“第一”或“第二”等类似序数词主要是用以区分或指涉相同或类似的元件或特征,且不必然隐含此等元件或特征在空间或时间上的顺序。应了解的是,在某些情形或组态下,序数词可以交换使用而不影响本发明的实施。In this article, the terms "first" or "second" and similar ordinal numbers are mainly used to distinguish or refer to the same or similar elements or features, and do not necessarily imply that these elements or features are separated in space or time. order. It should be understood that in certain situations or configurations, ordinal numbers may be used interchangeably without affecting the implementation of the present invention.

此外,于本文中,用语“包含”、“包括”、“具有”、“含有”或其他任何类似用语意欲涵盖非排他性的包括物。举例而言,含有多个要件的一元件、结构、制品或装置不仅限于本文所列出的这些要件而已,而是可以包括未明确列出但却是所述元件、结构、制品或装置通常固有的其他要件。Furthermore, as used herein, the terms "comprises", "including", "has", "containing" or any other similar term are intended to cover a non-exclusive inclusion. For example, an element, structure, article, or device that contains multiple elements is not limited to those elements listed herein, but may include elements that are not explicitly listed but are generally inherent in the element, structure, article, or device. other elements.

请参考图1,其为本发明的充泄气调压系统10的系统方块图。如图1所示,本发明的充泄气调压系统10是应用于气垫床,特别是针对具有至少两气体管路的气垫床,所述气垫床是由多个气囊排列组成,其中每个气体管路各自包括部分连通的气囊。在本发明中,气垫床采用两个独立气体管路的设计,其中一个气体管路连通所有单数列气囊,另一个气体管路则连通所有偶数列气囊,但本发明不以此为限;由于前述气垫床的气体管路及气囊结构属于现有的设计,在此不多加赘述。Please refer to FIG. 1 , which is a system block diagram of an inflation-discharging pressure regulating system 10 of the present invention. As shown in Fig. 1, the inflation and deflation gas pressure regulating system 10 of the present invention is applied to an air bed, especially for an air bed with at least two gas pipelines. The conduits each include partially communicating balloons. In the present invention, the air mattress adopts the design of two independent gas pipelines, wherein one gas pipeline communicates with all the single-numbered airbags, and the other gas pipeline communicates with all the even-numbered airbags, but the present invention is not limited thereto; The gas pipeline and the air bag structure of the aforementioned air mattress belong to the existing design, and will not be repeated here.

本发明的充泄气调压系统10通过检测气垫床在载重状态下的压力变化,判断对气垫床应执行充气或泄气操作,以达到调整气垫床压力的效果。在本发明中,充泄气调压系统10包括充泄气装置11、压力检测单元12及控制单元13,控制单元13分别与充泄气装置11及压力检测单元12电性连接。充泄气装置11可通过气体传输管与气垫床连通,并形成一封闭气体通路,当充泄气装置11接收指令运作时,用以对气垫床充气或泄气;此处充泄气装置11可以是空气泵或其他能执行类似充泄气功能的元件。The inflation and deflation pressure regulating system 10 of the present invention detects the pressure change of the air mattress under load, and judges that the air mattress should be inflated or deflated, so as to achieve the effect of adjusting the pressure of the air mattress. In the present invention, the inflation and deflation system 10 includes an inflation and deflation device 11 , a pressure detection unit 12 and a control unit 13 , and the control unit 13 is electrically connected to the inflation and deflation device 11 and the pressure detection unit 12 respectively. The inflation and deflation device 11 can communicate with the air bed through the gas transmission pipe, and form a closed gas passage. When the inflation and deflation device 11 receives instructions to operate, it is used to inflate or deflate the air mattress; here, the inflation and deflation device 11 can be an air pump Or other elements that can perform similar inflation and deflation functions.

此外,在本发明中,充泄气装置11还可包括泄气单元111。泄气单元111可与气体传输管连通,且泄气单元111于充泄气装置11运作时作用开启,以提供散热功能;此处泄气单元111可以是泄气阀或其他能执行类似功能的元件。In addition, in the present invention, the inflation and deflation device 11 may further include a deflation unit 111 . The deflation unit 111 can communicate with the gas transmission pipe, and the deflation unit 111 is activated when the inflator and deflation device 11 operates, so as to provide heat dissipation; the deflation unit 111 can be a deflation valve or other components capable of performing similar functions.

压力检测单元12设置于所述封闭气体通路中,用以持续检测气垫床内的压力,以取得即时压力值;并将陆续取得的即时压力值传送至控制单元13,以供控制单元13执行后续处理及判断。此处压力检测单元12可以是压力感测器。The pressure detection unit 12 is arranged in the closed air passage for continuously detecting the pressure in the air mattress to obtain the real-time pressure value; processing and judgment. Here the pressure detection unit 12 may be a pressure sensor.

控制单元13可持续取得来自压力检测单元12的即时压力值,并对其进行对应处理及比对判断等,以便依据比对判断结果来控制充泄气装置11执行充气或泄气。在本发明中,控制单元13用以依据压力检测单元12于气垫床在一载重状态下所检测的即时压力值,判断即时压力值是否在一设定时间前即已达到设定压力值;此处所谓载重状态即为病患躺卧在气垫床上时的状态。此外,前述供控制单元13判断的设定时间及设定压力值,可由控制单元13预先设定及储存,或由使用者视需求自行设定或调整。The control unit 13 can continuously obtain the real-time pressure value from the pressure detection unit 12, and perform corresponding processing and comparison and judgment on it, so as to control the inflation and deflation device 11 to perform inflation or deflation according to the comparison and judgment result. In the present invention, the control unit 13 is used to determine whether the real-time pressure value has reached the set pressure value before a set time according to the real-time pressure value detected by the pressure detection unit 12 under a load state of the air mattress; The so-called load-bearing state is the state when the patient is lying on the air mattress. In addition, the above-mentioned set time and set pressure value for judgment by the control unit 13 can be preset and stored by the control unit 13, or can be set or adjusted by the user as required.

在本发明中,控制单元13设定了控制充泄气装置11的第一充泄气策略及第二充泄气策略,以在符合不同条件下控制充泄气装置11;也就是说,控制单元13会依据前述对即时压力值的判断结果,来决定以第一充泄气策略或第二充泄气策略控制充泄气装置11。其中第一充泄气策略及第二充泄气策略将详述于后。In the present invention, the control unit 13 sets the first inflation and deflation strategy and the second inflation and deflation strategy for controlling the inflation and deflation device 11, so as to control the inflation and deflation device 11 under different conditions; Based on the above judgment result of the instantaneous pressure value, it is decided to control the inflation and deflation device 11 with the first inflation and deflation strategy or the second inflation and deflation strategy. The first inflation and deflation strategy and the second inflation and deflation strategy will be described in detail later.

在本发明中,控制单元13包括处理器131及数模转换器132。处理器131用以将经处理后的即时压力值进行比对判断,判断即时压力值是否在设定时间前即已达到设定压力值,并依据比对判断结果产生对应指令来控制充泄气装置11。此处处理器131可以是中央处理单元或微控制器等类似元件。In the present invention, the control unit 13 includes a processor 131 and a digital-to-analog converter 132 . The processor 131 is used to compare and judge the processed real-time pressure value, judge whether the real-time pressure value has reached the set pressure value before the set time, and generate corresponding instructions according to the comparison and judgment result to control the inflation and deflation device 11. Here, the processor 131 may be a central processing unit or a microcontroller or the like.

数模转换器132电性连接处理器131及压力检测单元12。数模转换器132用以将自压力检测单元12持续取得的即时压力值进行模拟/数字信号的转换处理,并将处理后的信号传送至处理器131以供比对判断。The digital-to-analog converter 132 is electrically connected to the processor 131 and the pressure detection unit 12 . The digital-to-analog converter 132 is used for converting the real-time pressure value continuously obtained from the pressure detection unit 12 into an analog/digital signal, and sending the processed signal to the processor 131 for comparison and judgment.

控制单元13还包括存储器133,存储器133电性连接处理器131,且存储器133用以储存前述取得的即时压力值、设定的设定压力值及设定时间,以供处理器131于需要时读取比对。此处存储器133可以是处理器131内部的暂存存储器、独立设置的存储器单元、硬盘或其他具有数据储存功能的元件,其依据设计需求不同而改变,本发明不以此为限。The control unit 13 also includes a memory 133, the memory 133 is electrically connected to the processor 131, and the memory 133 is used to store the aforementioned obtained real-time pressure value, the set pressure value and the set time for the processor 131 when needed. Read alignment. Here, the memory 133 may be a temporary memory inside the processor 131 , an independent memory unit, a hard disk or other elements with data storage function, which may vary according to different design requirements, and the present invention is not limited thereto.

请参考图2,其为本发明的充泄气调压方法第一实施例的流程图。需注意的是,以下虽配合图1所示的充泄气调压系统10为例说明本发明的充泄气调压方法,但本发明并不以此为限。如图2所示,本发明的充泄气调压方法包括步骤S1至步骤S4。以下将详细说明所述方法的各个步骤:Please refer to FIG. 2 , which is a flow chart of the first embodiment of the inflation and pressure regulation method of the present invention. It should be noted that, although the inflation and deflation pressure regulating system 10 shown in FIG. 1 is used as an example to illustrate the inflation and deflation pressure regulating method of the present invention, the present invention is not limited thereto. As shown in FIG. 2 , the air inflation and pressure regulation method of the present invention includes steps S1 to S4. The individual steps of the method will be described in detail below:

步骤S1:执行自动检测充泄气程序,其中通过控制单元13持续取得压力检测单元12所检测到气垫床的即时压力值,并指示充泄气装置10泄除气垫床的任一气体管路内的气体。Step S1: Execute the automatic detection inflation and deflation program, in which the real-time pressure value of the air mattress detected by the pressure detection unit 12 is continuously obtained through the control unit 13, and instructs the inflation and deflation device 10 to release the gas in any gas pipeline of the air mattress .

首先,本发明的充泄气调压系统会对气垫床执行自动检测充泄气程序。在执行本发明的充泄气调压方法第一实施例前,需要先将气垫床与充泄气装置11彼此连通,以构成一个封闭气体通路。设置在封闭气体通路中的压力检测单元12会不间断地检测气垫床的目前压力,以持续取得气垫床的即时压力值,并传送至控制单元13。控制单元13则持续取得气垫床的即时压力值,并指示充泄气装置10先泄除气垫床的任一气体管路内的气体;也就是说,以本发明所采用具有两个气体管路的气垫床为例,控制单元13会依据设定,指示充泄气装置10将两个气体管路的其中之一内的气体先行泄除,仅保留单一气体管路内的充气状态(例如先泄除单数列气囊内的气体,仅保留偶数列气囊内的充气状态;反之亦然)。Firstly, the inflation and deflation air pressure regulation system of the present invention will automatically detect the inflation and deflation procedures for the air bed. Before implementing the first embodiment of the inflation and deflation method of the present invention, it is necessary to connect the air mattress and the inflation and deflation device 11 to form a closed gas passage. The pressure detection unit 12 arranged in the closed air passage will continuously detect the current pressure of the air mattress to obtain the real-time pressure value of the air mattress continuously and send it to the control unit 13 . The control unit 13 then continues to obtain the instant pressure value of the air mattress, and instructs the inflation and deflation device 10 to first release the gas in any gas pipeline of the air mattress; Take an air bed as an example, the control unit 13 will instruct the inflation and deflation device 10 to first discharge the gas in one of the two gas pipelines according to the setting, and only keep the inflation state in a single gas pipeline (for example, to deflate first The gas in the single-numbered airbags only retains the inflated state in the even-numbered airbags; and vice versa).

此处请先参考图3,其为本发明的充泄气调压方法第一实施例的自动检测压力程序的细节流程图。如图3所示,本发明的充泄气调压方法的自动检测压力程序还包括步骤S11至步骤S13。以下将详细说明所述自动检测压力程序的各个细节步骤:Here, please refer to FIG. 3 , which is a detailed flow chart of the automatic pressure detection procedure of the first embodiment of the inflation and discharge pressure regulation method of the present invention. As shown in FIG. 3 , the automatic pressure detection procedure of the inflation and discharge pressure regulation method of the present invention further includes steps S11 to S13 . The detailed steps of the automatic pressure detection program will be described in detail below:

步骤S11:通过充泄气装置11对二气体管路充气。Step S11: Inflate the two gas pipelines through the inflation and deflation device 11 .

在气垫床与充泄气装置11彼此连通后,先通过充泄气装置11对气垫床的两个气体管路都进行充气。After the air bed and the inflatable and deflated device 11 are communicated with each other, both gas pipelines of the air bed are inflated through the inflated and deflated device 11 .

步骤S12:判断各气体管路是否达到参考压力值。Step S12: Judging whether each gas pipeline reaches a reference pressure value.

在前述充泄气装置11的充气过程中,控制单元13可通过压力检测单元12持续取得气垫床的即时压力值,用以判断气垫床的各气体管路是否已达到参考压力值。此处参考压力值为控制单元13的一压力比对标准,同样可由控制单元13预先设定,或由使用者视需求自行设定或调整,以储存于存储器133中。若控制单元13判断气垫床的各气体管路已达到参考压力值,则续行步骤S13;反之,则回到步骤S11,继续由充泄气装置11充气并持续即时压力值的检测。During the inflation process of the above-mentioned inflation and deflation device 11, the control unit 13 can continuously obtain the real-time pressure value of the air mattress through the pressure detection unit 12, so as to judge whether each gas pipeline of the air mattress has reached the reference pressure value. Here, the reference pressure value is a pressure comparison standard of the control unit 13 , which can also be preset by the control unit 13 , or set or adjusted by the user as required, and stored in the memory 133 . If the control unit 13 judges that the gas pipelines of the air mattress have reached the reference pressure value, then continue to step S13; otherwise, return to step S11, continue to inflate by the inflation and deflation device 11 and continue to detect the real-time pressure value.

步骤S13:通过充泄气装置11泄除气垫床的任一气体管路内的气体。Step S13: bleed the gas in any gas pipeline of the air mattress through the inflatable and deflated device 11 .

在控制单元13判断气垫床的各气体管路已达到参考压力值后,可让病患躺卧在气垫床上,使气垫床处于载重状态;接着控制单元13即可依据设定指示充泄气装置10将两个气体管路的其中之一内的气体先行泄除,仅保留单一气体管路内的充气状态。After the control unit 13 judges that the gas pipelines of the air mattress have reached the reference pressure value, the patient can lie on the air mattress to make the air mattress in a load-bearing state; then the control unit 13 can instruct the inflatable and deflated device 10 according to the setting The gas in one of the two gas pipelines is released first, and only the inflated state in the single gas pipeline is retained.

步骤S2:通过控制单元13判断气垫床在载重状态下的即时压力值是否在设定时间前即已达到设定压力值。Step S2: The control unit 13 judges whether the immediate pressure value of the air mattress under load has reached the set pressure value before the set time.

回到图2,接着,控制单元13判断气垫床在单一气体管路充气的载重状态下,所取得的即时压力值是否在设定时间前即已达到设定压力值。若所述即时压力值在设定时间前即已达到设定压力值,表示气垫床目前所承载病患的体重已超出一定数值,因此续行步骤S3;反之,表示气垫床目前所承载病患的体重在可辨识范围内,则续行步骤S4。Returning to FIG. 2 , next, the control unit 13 judges whether the instantaneous pressure value obtained by the air mattress has reached the set pressure value before the set time when the air mattress is inflated by a single gas pipeline. If the instant pressure value has reached the set pressure value before the set time, it means that the weight of the patient currently carried by the air mattress has exceeded a certain value, so continue to step S3; otherwise, it means that the patient currently carried by the air mattress has exceeded a certain value If the body weight is within the identifiable range, proceed to step S4.

步骤S3:控制单元13决定气垫床的第一充泄气策略。Step S3: The control unit 13 determines the first inflation and deflation strategy of the air mattress.

在控制单元13判断即时压力值在设定时间前即已达到设定压力值时,控制单元13决定气垫床的第一充泄气策略,并指示充泄气装置11对气垫床执行对应的充气或泄气。在本发明中,控制单元13会预先在存储器133内储存有一第一参数表,此第一参数表表示多个不同时间区间及各时间区间所对应的目标治疗压力值,这些数值是依据统计相当数量的病患的体重及对应压力等相关资料后所取得。在本实施例中,假设前述参考压力值为30mmHg,设定压力值为40mmHg,设定时间可选自为一时间范围内的任意时间点,例如时间范围可为45~120秒、60~120秒或其他范围,而此处设定时间最佳为90秒,但不以本实施例为限。第一参数表可如下表1所示的范例说明:When the control unit 13 judges that the immediate pressure value has reached the set pressure value before the set time, the control unit 13 determines the first inflation and deflation strategy of the air mattress, and instructs the inflation and deflation device 11 to perform corresponding inflation or deflation of the air mattress . In the present invention, the control unit 13 will pre-store a first parameter table in the memory 133. The first parameter table represents a plurality of different time intervals and the target treatment pressure values corresponding to each time interval. The relevant data such as body weight and corresponding pressure of the number of patients were obtained. In this embodiment, assuming that the aforementioned reference pressure value is 30mmHg and the set pressure value is 40mmHg, the set time can be selected as any time point within a time range, for example, the time range can be 45-120 seconds, 60-120 seconds seconds or other ranges, and the best setting time here is 90 seconds, but it is not limited to this embodiment. The first parameter table can be described as an example shown in Table 1 below:

表1Table 1

前述第一充泄气策略为控制单元13依据即时压力值达到设定压力所需时间,对应多个不同时间区间中的一个,通过所述时间区间所对应的目标治疗压力值与即时压力值的差异来对气垫床充气或泄气。The aforementioned first inflation and deflation strategy is the time required for the control unit 13 to reach the set pressure according to the instant pressure value, corresponding to one of a plurality of different time intervals, and the difference between the target treatment pressure value and the instant pressure value corresponding to the time interval to inflate or deflate the air mattress.

请参照表1,举例来说,假设控制单元13判断即时压力值在55秒时已达到设定压力值(40mmHg),也就是即时压力值在设定时间(以前述最佳90秒为例)前时已达到设定压力值,此时控制单元13可依据第一参数表找出55秒所对应的时间区间为51~60秒,而所述时间区间所对应的目标治疗压力值为41mmHg。因此,控制单元13即可计算出目标治疗压力值与即时压力值的差异(即目标治疗压力值与即时压力值相差+1mmHg),并据此对气垫床充气以加压。Please refer to Table 1, for example, assuming that the control unit 13 judges that the real-time pressure value has reached the set pressure value (40mmHg) at 55 seconds, that is, the real-time pressure value is within the set time (taking the aforementioned optimal 90 seconds as an example) The set pressure value has been reached before, at this time, the control unit 13 can find out that the time interval corresponding to 55 seconds is 51-60 seconds according to the first parameter table, and the target treatment pressure value corresponding to the time interval is 41mmHg. Therefore, the control unit 13 can calculate the difference between the target treatment pressure value and the real-time pressure value (ie, the difference between the target treatment pressure value and the real-time pressure value + 1mmHg), and inflate the air mattress accordingly.

通过此设计,当控制单元13判断即时压力值在设定时间前即已达到设定压力值时,即可于达到设定压力值的所述时间点,参照第一参数表的时间区间找出目前气垫床对应的目标治疗压力值,来对气垫床充气或泄气,无需等待设定时间到达,如此能有效减少判断处理的时间。Through this design, when the control unit 13 judges that the immediate pressure value has reached the set pressure value before the set time, it can refer to the time interval of the first parameter table to find out the time point when the set pressure value is reached. At present, the target treatment pressure value corresponding to the air mattress is used to inflate or deflate the air mattress without waiting for the set time to arrive, which can effectively reduce the time for judging and processing.

步骤S4:控制单元13决定气垫床的第二充泄气策略。Step S4: The control unit 13 determines the second inflation and deflation strategy of the air mattress.

在控制单元13判断即时压力值并未在设定时间前达到设定压力值时,控制单元13决定气垫床的第二充泄气策略,并指示充泄气装置11对气垫床执行对应的充气或泄气。在本发明中,控制单元13会预先在存储器133内储存有一第二参数表,此第二参数表表示多个不同比对压力差及各比对压力差所对应的目标治疗压力值,其也依据相当数量的病患经体重资料统计后所取得。在本实施例中,同样假设参考压力值为30mmHg,设定压力值为40mmHg,设定时间最佳为90秒,第二参数表的范例可如下表2所示:When the control unit 13 judges that the immediate pressure value does not reach the set pressure value before the set time, the control unit 13 determines the second inflation and deflation strategy of the air mattress, and instructs the inflation and deflation device 11 to perform corresponding inflation or deflation of the air mattress . In the present invention, the control unit 13 will store a second parameter table in the memory 133 in advance, and the second parameter table represents a plurality of different comparison pressure differences and target treatment pressure values corresponding to each comparison pressure difference. Obtained based on a considerable number of patients after weight data statistics. In this embodiment, it is also assumed that the reference pressure value is 30mmHg, the set pressure value is 40mmHg, and the optimal setting time is 90 seconds. An example of the second parameter table can be shown in Table 2 below:

表2Table 2

前述第二充泄气策略为控制单元13依据达到设定时间的即时压力值,取得即时压力值与参考压力值的压力差,对应多个不同比对压力差中的一个,通过所述比对压力差所对应的目标治疗压力值与即时压力值的差异来对气垫床充气或泄气。The aforementioned second inflation and deflation strategy is that the control unit 13 obtains the pressure difference between the instant pressure value and the reference pressure value according to the instant pressure value reaching the set time, which corresponds to one of a plurality of different comparison pressure differences. The difference between the target treatment pressure value corresponding to the difference and the real-time pressure value is used to inflate or deflate the air mattress.

请参照表2,举例来说,假设控制单元13判断即时压力值(26mmHg)在到达设定时间(90秒)时尚未达到设定压力值(40mmHg),此时控制单元13可依据第二参数表找出即时压力值与参考压力值(30mmHg)的压力差所对应的比对压力差为-4,而所述比对压力差所对应的目标治疗压力值为21mmHg。因此,控制单元13即可计算出目标治疗压力值与即时压力值的差异(即目标治疗压力值与即时压力值相差-9mmHg),并据此对气垫床泄气以减压。Please refer to Table 2. For example, assuming that the control unit 13 judges that the immediate pressure value (26mmHg) has not yet reached the set pressure value (40mmHg) when the set time (90 seconds) is reached, the control unit 13 can then use the second parameter The comparison pressure difference corresponding to the pressure difference between the instant pressure value and the reference pressure value (30mmHg) is found in the table, and the target treatment pressure value corresponding to the comparison pressure difference is 21mmHg. Therefore, the control unit 13 can calculate the difference between the target treatment pressure value and the real-time pressure value (ie, the difference between the target treatment pressure value and the real-time pressure value is −9 mmHg), and accordingly deflate the air mattress to reduce pressure.

通过此设计,当控制单元13判断即时压力值在设定时间前尚未达到设定压力值时,即可依据此时即时压力值与参考压力值的压力差,参照第二参数表的比对压力差找出目前气垫床对应的目标治疗压力值,来对气垫床充气或泄气。Through this design, when the control unit 13 judges that the immediate pressure value has not reached the set pressure value before the set time, it can refer to the comparison pressure in the second parameter table according to the pressure difference between the instant pressure value and the reference pressure value at this time. Then find out the target therapeutic pressure value corresponding to the current air mattress to inflate or deflate the air mattress.

请一并参考图4及图5。图4为本发明的气垫床系统1的系统方块图,图5为本发明的气垫床系统的充泄气装置11及气垫床14之间管路连接状态的示意图。如图4所示,本发明的气垫床系统1包括气垫床14及前述充泄气调压系统,其中气垫床14与充泄气装置11保持气体连通,且利用压力检测单元12来持续检测气垫床14内的压力,取得即时压力值以传送至控制单元13进行判断比对。Please refer to Figure 4 and Figure 5 together. FIG. 4 is a system block diagram of the air bed system 1 of the present invention, and FIG. 5 is a schematic diagram of the pipeline connection state between the inflation and deflation device 11 and the air bed 14 of the air bed system of the present invention. As shown in FIG. 4 , the air mattress system 1 of the present invention includes an air mattress 14 and the aforementioned inflation and pressure regulating system, wherein the air mattress 14 is in gas communication with the inflation and deflation device 11 , and the pressure detection unit 12 is used to continuously detect the air mattress 14 The pressure inside is obtained to obtain the real-time pressure value to be sent to the control unit 13 for judgment and comparison.

如图5所示,在本发明的气垫床系统1中,气垫床14包括第一气体管路A及第二气体管路B,第一气体管路A包括第一内囊A1及第一外囊A2,第二气体管路B包括第二内囊B1及第二外囊B2,而充泄气装置11可通过两气体传输管分别连通第一气体管路A的第一外囊A2及第二气体管路B的第二外囊B2。在气垫床14内部的管路连接设计上,第一外囊A2通过第一逆止阀C1连通第二内囊B1,且第二外囊B2通过第二逆止阀C2连通第一内囊A1。需注意的是,图5中为了方便说明第一气体管路A及第二气体管路B间的管路连通设计,第一气体管路A仅显示单一组的第一内囊A1及第一外囊A2,且第二气体管路B仅显示单一组的第二内囊B1及第二外囊B2;但实际上第一气体管路A可包括多组第一内囊A1及第一外囊A2,且第二气体管路B也可包括多组第二内囊B1及第二外囊B2。As shown in Figure 5, in the air mattress system 1 of the present invention, the air mattress 14 includes a first gas pipeline A and a second gas pipeline B, and the first gas pipeline A includes a first inner bag A1 and a first outer bag A1. Bag A2, the second gas pipeline B includes a second inner bag B1 and a second outer bag B2, and the inflation and deflation device 11 can communicate with the first outer bag A2 and the second outer bag of the first gas pipeline A through two gas transmission tubes, respectively. The second outer bag B2 of the gas pipeline B. In the pipeline connection design inside the air mattress 14, the first outer bag A2 communicates with the second inner bag B1 through the first check valve C1, and the second outer bag B2 communicates with the first inner bag A1 through the second check valve C2 . It should be noted that in FIG. 5, in order to facilitate the description of the pipeline communication design between the first gas pipeline A and the second gas pipeline B, the first gas pipeline A only shows a single set of the first inner bag A1 and the first inner bag A1. The outer bag A2, and the second gas pipeline B only shows a single set of the second inner bag B1 and the second outer bag B2; but actually the first gas pipeline A may include multiple sets of the first inner bag A1 and the first outer bag The bag A2, and the second gas pipeline B may also include multiple sets of second inner bags B1 and second outer bags B2.

请参考图6,其为本发明的充泄气调压方法第二实施例的局部流程图,且所述方法可应用于本发明的气垫床系统1。如图5及图6所示,其与前述图2的方法流程不同之处在于,图6的方法在执行前述步骤S1的自动检测充泄气程序前,还可先执行步骤S0的内囊补气程序。在本实施例中,气垫床14的第一气体管路A及第二气体管路B各自包括独立的内囊及外囊,因此在充气过程中,必须先确保位于底部的第一内囊A1及第二内囊B1先充饱气,做为气垫床14的支撑基底。之后再通过执行类似前述步骤S1的操作,由控制单元13通过充泄气装置11预先对第一气体管路A及第二气体管路B充气,使第一气体管路A及第二气体管路B均达到参考压力值。最后,再针对位于第一内囊A1上方的第一外囊A2或位于第二内囊B1上方的第二外囊B2,执行如前述步骤S13气体泄除操作,以单一气体管路充气的状态下,应用所述方法执行气垫床14相同的充泄气调压功能。Please refer to FIG. 6 , which is a partial flow chart of the second embodiment of the inflation and pressure regulation method of the present invention, and the method can be applied to the air mattress system 1 of the present invention. As shown in Fig. 5 and Fig. 6, the difference from the method flow in Fig. 2 is that the method in Fig. 6 can also perform the inner bag gas replenishment in step S0 before performing the automatic detection of inflation and deflation procedures in step S1. program. In this embodiment, the first gas pipeline A and the second gas pipeline B of the air mattress 14 each include an independent inner bag and an outer bag. Therefore, during the inflation process, it is necessary to ensure that the first inner bag A1 at the bottom And the second inner bag B1 is inflated first, as the supporting base of the air bed 14 . Afterwards, by performing an operation similar to the aforementioned step S1, the first gas pipeline A and the second gas pipeline B are inflated in advance by the control unit 13 through the inflation and deflation device 11, so that the first gas pipeline A and the second gas pipeline B all reach the reference pressure value. Finally, for the first outer bag A2 located above the first inner bag A1 or the second outer bag B2 located above the second inner bag B1, the gas release operation as in the aforementioned step S13 is performed to inflate with a single gas pipeline Next, apply the method to perform the same inflation and pressure regulation function of the air mattress 14 .

内囊补气程序包括第一内囊补气程序及第二内囊补气程序。在预先对第一气体管路A及第二气体管路B充气以达到参考压力值前,充泄气装置11可对第一外囊A2及第二内囊B1充气;由于第一逆止阀C1的设置,使得充入第二内囊B1的气体不会外泄,确保第二内囊B1及第一外囊A2充气至一充气压力值后,第二内囊B1能持续保持在所述充气压力值的状态下;之后再将第一外囊A2泄气,以完成第二内囊补气程序。The inner bag air replenishment procedure includes a first inner bag air replenishment procedure and a second inner bag air replenishment procedure. Before pre-inflating the first gas pipeline A and the second gas pipeline B to reach the reference pressure value, the inflation and deflation device 11 can inflate the first outer bag A2 and the second inner bag B1; because the first check valve C1 The setting makes the gas inflated into the second inner bag B1 not leak out, and ensures that after the second inner bag B1 and the first outer bag A2 are inflated to an inflation pressure value, the second inner bag B1 can continue to maintain the inflation pressure. In the state of the pressure value; then deflate the first outer bag A2 to complete the second inner bag air replenishment procedure.

同样地,充泄气装置11可对第二外囊B2及第一内囊A1充气,通过第二逆止阀C2的设置,使得充入第一内囊A1的气体不会外泄,确保第一内囊A1及第二外囊B2充气至充气压力值后,第一内囊A1能持续保持在所述充气压力值的状态下;之后再将第二外囊B2泄气,以完成第一内囊补气程序。此处充气压力值也为控制单元13所预先设定及储存,在本实施例中,充气压力值可大于参考压力值,但本发明不以此为限。Similarly, the inflation and deflation device 11 can inflate the second outer bag B2 and the first inner bag A1, and through the setting of the second check valve C2, the gas filled in the first inner bag A1 will not leak out, ensuring the first After the inner bag A1 and the second outer bag B2 are inflated to the inflation pressure value, the first inner bag A1 can continue to maintain the inflation pressure value; then the second outer bag B2 is deflated to complete the first inner bag Air program. Here, the inflation pressure value is also preset and stored by the control unit 13. In this embodiment, the inflation pressure value may be greater than the reference pressure value, but the present invention is not limited thereto.

据此,通过本发明的设计,可在各气体管路保持外囊容积固定的条件下,对气垫床执行充泄气调压操作,更能提供气垫床的充泄气调压的准确性及效率。Accordingly, through the design of the present invention, under the condition that each gas pipeline maintains a fixed volume of the outer bag, the operation of inflating and deflating the pressure of the air mattress can be performed, and the accuracy and efficiency of the inflation and deflation of the air mattress can be improved.

以上实施方式本质上仅为辅助说明,且并不欲用以限制申请的实施例或这些实施例的应用或用途。此外,尽管已于前述实施方式中提出至少一例示性实施例,但应了解本发明仍可存在大量的变化。同样应了解的是,本文所述的实施例并不欲用以通过任何方式限制所请求的申请范围、用途或组态。相反的,前述实施方式将可提供本领域技术人员一种简便的指引以实施所述的一种或多种实施例。再者,可对元件的功能与排列进行各种变化而不脱离权利要求所界定的范围,且权利要求包含已知的均等物及在本专利申请案提出申请时的所有可预见均等物。The above embodiments are only auxiliary descriptions in nature, and are not intended to limit the embodiments of the application or the application or use of these embodiments. Furthermore, while at least one exemplary embodiment has been presented in the foregoing description, it should be appreciated that a wide variety of variations are possible. It should also be appreciated that the embodiments described herein are not intended to limit the scope, use or configuration of the claimed applications in any way. Rather, the foregoing description will provide those skilled in the art with a convenient orientation for implementing one or more described embodiments. Furthermore, various changes can be made in the function and arrangement of elements without departing from the scope defined by the claims, which include known equivalents and all foreseeable equivalents at the time of filing this patent application.

Claims (15)

1.一种充泄气调压系统,应用于一具有至少两气体管路的气垫床,所述充泄气调压系统包括:1. A gas-inflating and pressure-regulating system, applied to an air bed with at least two gas pipelines, the gas-inflating and pressure-regulating system comprising: 一充泄气装置,用以对所述气垫床充气或泄气;an inflation and deflation device for inflating or deflation of said air mattress; 一压力检测单元,用以持续检测所述气垫床的即时压力值;以及A pressure detection unit, used to continuously detect the real-time pressure value of the air mattress; and 一控制单元,用以依据所述压力检测单元于所述气垫床在一载重状态下所检测的所述即时压力值,判断所述即时压力值是否在一设定时间前即已达到一设定压力值;若是,所述控制单元将以一第一充泄气策略控制所述充泄气装置对所述气垫床的充气或泄气;若否,所述控制单元则以一第二充泄气策略控制所述充泄气装置对所述气垫床的充气或泄气。A control unit, used for judging whether the real-time pressure value has reached a set value before a set time according to the real-time pressure value detected by the pressure detection unit under a load state of the air mattress pressure value; if yes, the control unit will control the inflation or deflation of the air mattress by the inflation device with a first inflation strategy; if not, the control unit will control the air mattress with a second inflation strategy The inflation and deflation device can inflate or deflate the air mattress. 2.根据权利要求1所述的充泄气调压系统,其中,于所述控制单元进行判断前,所述充泄气装置对各气体管路进行充气,使各气体管路达到一参考压力值,再通过所述充泄气装置预先泄除所述气垫床的任一气体管路内的气体。2. The gas inflation and pressure regulation system according to claim 1, wherein, before the control unit makes a judgment, the gas inflation device inflates each gas pipeline so that each gas pipeline reaches a reference pressure value, The gas in any gas pipeline of the air mattress is pre-released through the inflation and deflation device. 3.根据权利要求1所述的充泄气调压系统,其中所述第一充泄气策略为所述控制单元依据达到所述设定压力所需时间,对应多个不同时间区间中的一个,通过所述时间区间所对应的一目标治疗压力值与所述即时压力值的差异来对所述气垫床充气或泄气。3. The inflation and pressure regulating system according to claim 1, wherein the first inflation and deflation strategy is that the control unit corresponds to one of a plurality of different time intervals according to the time required to reach the set pressure, by The difference between a target treatment pressure value corresponding to the time interval and the instant pressure value is used to inflate or deflate the air mattress. 4.根据权利要求2或3所述的充泄气调压系统,其中所述第二充泄气策略为所述控制单元依据达到所述设定时间的所述即时压力值,取得所述即时压力值与所述参考压力值的一压力差,对应多个不同比对压力差中的一个,通过所述比对压力差所对应的一目标治疗压力值与所述即时压力值的差异来对所述气垫床充气或泄气。4. The inflation and pressure regulating system according to claim 2 or 3, wherein the second inflation and deflation strategy is that the control unit obtains the immediate pressure value according to the instant pressure value reaching the set time A pressure difference from the reference pressure value corresponds to one of a plurality of different comparison pressure differences, and the difference between a target treatment pressure value corresponding to the comparison pressure difference and the instant pressure value is used to control the The air mattress is inflated or deflated. 5.根据权利要求1所述的充泄气调压系统,其中所述充泄气装置还包括一泄气单元,所述泄气单元于所述充泄气装置运作时开启,以提供散热功能。5 . The inflation and pressure regulating system according to claim 1 , wherein the inflation and deflation device further comprises a deflation unit, and the deflation unit is opened when the inflation and deflation device is in operation, so as to provide a heat dissipation function. 6 . 6.根据权利要求2所述的充泄气调压系统,其中所述控制单元包括一处理器及一数模转换器,所述处理器用以判断所述即时压力值是否在所述设定时间前即已达到所述设定压力值;所述数模转换器电性连接所述处理器及所述压力检测单元,所述数模转换器用以处理自所述压力检测单元取得的所述即时压力值,并传送至所述处理器。6. The air inflation and pressure regulation system according to claim 2, wherein the control unit includes a processor and a digital-to-analog converter, and the processor is used to determine whether the immediate pressure value is before the set time That is, the set pressure value has been reached; the digital-to-analog converter is electrically connected to the processor and the pressure detection unit, and the digital-to-analog converter is used to process the instant pressure obtained from the pressure detection unit value and passed to the processor. 7.根据权利要求6所述的充泄气调压系统,其中所述控制单元还包括一存储器,所述存储器电性连接所述处理器,且所述存储器用以储存所述参考压力值、所述即时压力值、所述设定压力值及所述设定时间。7. The air inflation and pressure regulation system according to claim 6, wherein the control unit further comprises a memory, the memory is electrically connected to the processor, and the memory is used to store the reference pressure value, the The instant pressure value, the set pressure value and the set time. 8.根据权利要求1所述的充泄气调压系统,其中所述设定时间可选自为一时间范围内的任意时间点。8. The air inflation and pressure regulation system according to claim 1, wherein the set time can be selected as any time point within a time range. 9.一种充泄气调压方法,应用于一具有至少两气体管路的气垫床,所述方法包括以下步骤:9. A method for inflation and pressure regulation, applied to an air bed with at least two gas pipelines, said method comprising the following steps: 执行一自动检测充泄气程序,其中通过一控制单元持续取得一压力检测单元所检测到所述气垫床的一即时压力值,并指示一充泄气装置泄除所述气垫床的任一气体管路内的气体;Execute an automatic detection inflation and deflation program, wherein a control unit continuously obtains an instant pressure value of the air mattress detected by a pressure detection unit, and instructs an inflation and deflation device to release any gas pipeline of the air mattress the gas inside; 通过所述控制单元判断所述气垫床在一载重状态下的所述即时压力值是否在一设定时间前即已达到一设定压力值;judging by the control unit whether the immediate pressure value of the air bed under a load state has reached a set pressure value before a set time; 若是,则所述控制单元决定所述气垫床的一第一充泄气策略;以及if so, the control unit determines a first inflation and deflation strategy for the air mattress; and 若否,则所述控制单元决定所述气垫床的一第二充泄气策略。If not, the control unit determines a second inflation and deflation strategy for the air mattress. 10.根据权利要求9所述的充泄气调压方法,其中于指示所述充泄气装置泄除所述气垫床的任一气体管路内的气体步骤中,还包括以下步骤:10. The inflation and pressure regulating method according to claim 9, wherein in the step of instructing the inflation and deflation device to deflate the gas in any gas pipeline of the air mattress, the following steps are further included: 通过所述充泄气装置对所述两气体管路充气;Inflate the two gas pipelines through the inflation and deflation device; 判断各气体管路是否达到一参考压力值;以及judging whether each gas pipeline reaches a reference pressure value; and 若是,则通过所述充泄气装置泄除所述气垫床的任一气体管路内的气体。If so, the gas in any gas pipeline of the air mattress is released through the inflation and deflation device. 11.根据权利要求10所述的充泄气调压方法,其中于通过所述充泄气装置对所述两气体管路充气的步骤前,还包括以下步骤:11. The inflation and pressure regulating method according to claim 10, further comprising the following steps before the step of inflating the two gas pipelines through the inflation and deflation device: 通过所述充泄气装置对所述两气体管路执行一内囊补气程序。An inner bag gas replenishment procedure is performed on the two gas pipelines through the inflation and deflation device. 12.根据权利要求9至11中任一项所述的充泄气调压方法,其中所述第一充泄气策略为所述控制单元依据所述达到所述设定压力所需时间,对应多个不同时间区间中的一个,通过所述时间区间所对应的一目标治疗压力值与即时压力值的差异来对所述气垫床充气或泄气。12. The inflation and deflation method according to any one of claims 9 to 11, wherein the first inflation and deflation strategy is that the control unit corresponds to a plurality of One of the different time intervals, the air mattress is inflated or deflated according to the difference between a target treatment pressure value corresponding to the time interval and an instant pressure value. 13.根据权利要求10或11所述的充泄气调压方法,其中所述第二充泄气策略为所述控制单元依据达到所述设定时间的所述即时压力值,取得所述即时压力值与所述参考压力值的一压力差,对应多个不同比对压力差中的一个,通过所述比对压力差所对应的一目标治疗压力值与即时压力值的差异来对所述气垫床充气或泄气。13. The inflation and deflation method according to claim 10 or 11, wherein the second inflation and deflation strategy is that the control unit obtains the instant pressure value according to the instant pressure value reaching the set time A pressure difference from the reference pressure value corresponds to one of a plurality of different comparison pressure differences, and the air mattress is adjusted by the difference between a target treatment pressure value corresponding to the comparison pressure difference and an immediate pressure value. Inflate or deflate. 14.一种气垫床系统,包括:14. An air bed system comprising: 一气垫床,包括一第一气体管路及一第二气体管路,所述第一气体管路包括一第一内囊及一第一外囊,所述第二气体管路包括一第二内囊及一第二外囊,所述第一外囊通过一第一逆止阀连通所述第二内囊,且所述第二外囊通过一第二逆止阀连通所述第一内囊;以及An air mattress includes a first gas pipeline and a second gas pipeline, the first gas pipeline includes a first inner bag and a first outer bag, and the second gas pipeline includes a second An inner bag and a second outer bag, the first outer bag communicates with the second inner bag through a first check valve, and the second outer bag communicates with the first inner bag through a second check valve sac; and 如权利要求1至8中任一项所述的充泄气调压系统,与所述气垫床形成气体连通,其中所述充泄气调压系统预先对所述第一气体管路及所述第二气体管路充气,使所述第一气体管路及所述第二气体管路均达到一参考压力值。The air inflation and pressure regulation system according to any one of claims 1 to 8, which is in gas communication with the air mattress, wherein the inflation and pressure regulation system pre-connects the first gas pipeline and the second The gas pipeline is inflated so that both the first gas pipeline and the second gas pipeline reach a reference pressure value. 15.根据权利要求14所述的气垫床系统,其中于所述充泄气调压系统预先对所述第一气体管路及所述第二气体管路充气以达到所述参考压力值前,所述充泄气调压系统先对所述第一外囊及所述第二内囊充气至一充气压力值,再将所述第一外囊泄气,以完成一第二内囊补气程序;接着对所述第二外囊及所述第一内囊充气至所述充气压力值,再将所述第二外囊泄气,以完成一第一内囊补气程序。15. The air mattress system according to claim 14, wherein before the inflation and pressure regulation system pre-inflates the first gas pipeline and the second gas pipeline to reach the reference pressure value, the The inflation-deflation air pressure regulating system first inflates the first outer bag and the second inner bag to an inflation pressure value, and then deflates the first outer bag to complete a second inner bag air replenishment procedure; then Inflate the second outer bag and the first inner bag to the inflation pressure value, and then deflate the second outer bag to complete a first inner bag inflating procedure.
CN201510096088.6A 2015-03-04 2015-03-04 Air cushion bed system, air inflation and deflation pressure regulating system and method Active CN105982800B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510096088.6A CN105982800B (en) 2015-03-04 2015-03-04 Air cushion bed system, air inflation and deflation pressure regulating system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510096088.6A CN105982800B (en) 2015-03-04 2015-03-04 Air cushion bed system, air inflation and deflation pressure regulating system and method

Publications (2)

Publication Number Publication Date
CN105982800A true CN105982800A (en) 2016-10-05
CN105982800B CN105982800B (en) 2018-05-15

Family

ID=57039111

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510096088.6A Active CN105982800B (en) 2015-03-04 2015-03-04 Air cushion bed system, air inflation and deflation pressure regulating system and method

Country Status (1)

Country Link
CN (1) CN105982800B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106704153A (en) * 2017-03-16 2017-05-24 浙江比华丽电子科技有限公司 Automatic air supply system for air cushion bed and air supplying method
CN107450623A (en) * 2017-08-24 2017-12-08 汕头市智润科技发展有限公司 The temperature control equipment and its control method of a kind of aerated product
CN109771180A (en) * 2017-11-13 2019-05-21 雃博股份有限公司 Inflatable identification joint and its air mattress system
CN110074954A (en) * 2019-06-04 2019-08-02 芜湖蓓慈电器有限公司 A kind of user's sign detection method and system based on massage armchair
CN110074955A (en) * 2019-06-04 2019-08-02 芜湖蓓慈电器有限公司 A kind of user's sign detection method and system based on massage armchair
CN110074953A (en) * 2019-06-04 2019-08-02 芜湖蓓慈电器有限公司 A kind of air pressure control method and system of massage armchair
CN110559142A (en) * 2019-08-08 2019-12-13 深圳大学 Control method and device for pressure injury protection pad and computer readable storage medium
CN111568669A (en) * 2020-05-15 2020-08-25 上海创始实业(集团)有限公司 Air bag cushion air pressure adjusting method, device and computer readable storage medium
CN112220630A (en) * 2019-07-15 2021-01-15 希尔-罗姆服务公司 Pneumatic system occlusion detection
WO2021213207A1 (en) * 2020-04-24 2021-10-28 深圳半岛医疗有限公司 Cavity treatment instrument and method for controlling same

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100212089A1 (en) * 2007-10-02 2010-08-26 Ryuji Kajiwara Air mattress controller
CN101999978A (en) * 2010-12-02 2011-04-06 无锡尚瑞德医疗器械有限公司 Double-layer pulse air circulation bedsore-preventing cushion
CN102293700A (en) * 2010-06-25 2011-12-28 许汉忠 Active support shoulder and neck device and method for health bed
EP2532280A1 (en) * 2010-02-05 2012-12-12 Paramount Bed Co., Ltd. Air mattress
CN102988141A (en) * 2012-12-21 2013-03-27 天津市光学精密机械研究所 Remotely controlled automatic inflating and deflating device for anti-bedsore air cushion bed and control method thereof
CN103784284A (en) * 2012-10-29 2014-05-14 陈鼎然 Air pressure regulating and controlling method for air cushion bed controller
CN203915313U (en) * 2014-05-20 2014-11-05 鹿得医疗器械(南通)有限公司 A kind of full-automatic anti-bed sore air-filling mattress

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100212089A1 (en) * 2007-10-02 2010-08-26 Ryuji Kajiwara Air mattress controller
EP2532280A1 (en) * 2010-02-05 2012-12-12 Paramount Bed Co., Ltd. Air mattress
CN102293700A (en) * 2010-06-25 2011-12-28 许汉忠 Active support shoulder and neck device and method for health bed
CN101999978A (en) * 2010-12-02 2011-04-06 无锡尚瑞德医疗器械有限公司 Double-layer pulse air circulation bedsore-preventing cushion
CN103784284A (en) * 2012-10-29 2014-05-14 陈鼎然 Air pressure regulating and controlling method for air cushion bed controller
CN102988141A (en) * 2012-12-21 2013-03-27 天津市光学精密机械研究所 Remotely controlled automatic inflating and deflating device for anti-bedsore air cushion bed and control method thereof
CN203915313U (en) * 2014-05-20 2014-11-05 鹿得医疗器械(南通)有限公司 A kind of full-automatic anti-bed sore air-filling mattress

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106704153A (en) * 2017-03-16 2017-05-24 浙江比华丽电子科技有限公司 Automatic air supply system for air cushion bed and air supplying method
CN107450623A (en) * 2017-08-24 2017-12-08 汕头市智润科技发展有限公司 The temperature control equipment and its control method of a kind of aerated product
CN109771180A (en) * 2017-11-13 2019-05-21 雃博股份有限公司 Inflatable identification joint and its air mattress system
CN110074954A (en) * 2019-06-04 2019-08-02 芜湖蓓慈电器有限公司 A kind of user's sign detection method and system based on massage armchair
CN110074955A (en) * 2019-06-04 2019-08-02 芜湖蓓慈电器有限公司 A kind of user's sign detection method and system based on massage armchair
CN110074953A (en) * 2019-06-04 2019-08-02 芜湖蓓慈电器有限公司 A kind of air pressure control method and system of massage armchair
CN112220630B (en) * 2019-07-15 2022-06-07 希尔-罗姆服务公司 Pneumatic system occlusion detection
US12048662B2 (en) 2019-07-15 2024-07-30 Hill-Rom Services, Inc. Pneumatic system blockage detection
CN112220630A (en) * 2019-07-15 2021-01-15 希尔-罗姆服务公司 Pneumatic system occlusion detection
US11712386B2 (en) 2019-07-15 2023-08-01 Hill-Rom Services, Inc. Pneumatic system blockage detection
CN110559142A (en) * 2019-08-08 2019-12-13 深圳大学 Control method and device for pressure injury protection pad and computer readable storage medium
CN110559142B (en) * 2019-08-08 2021-05-04 深圳大学 Method, device and computer-readable storage medium for controlling pressure injury protective pad
WO2021213207A1 (en) * 2020-04-24 2021-10-28 深圳半岛医疗有限公司 Cavity treatment instrument and method for controlling same
CN111568669A (en) * 2020-05-15 2020-08-25 上海创始实业(集团)有限公司 Air bag cushion air pressure adjusting method, device and computer readable storage medium

Also Published As

Publication number Publication date
CN105982800B (en) 2018-05-15

Similar Documents

Publication Publication Date Title
CN105982800B (en) Air cushion bed system, air inflation and deflation pressure regulating system and method
AU2013232352B2 (en) Compression therapy device with multiple simultaneously active chambers
EP3622933B1 (en) Turning air mattress, turning air cell, and control method for air mattress
US10653575B2 (en) Patient support apparatus and methods
CN108697326B (en) inflatable support
US10085569B2 (en) Inflation and deflation pressure regulation system
CN111436808B (en) Intelligent pillow, control method and device thereof, control equipment and storage medium
EP2203092A1 (en) Mattress pump apparatus controller, mattress pump apparatus, mattress and method of controlling a mattress
CN113598575A (en) Intelligent adjustment pillow core, pillow and control method for pillow
TWI529508B (en) Air cushion bed system, charge and discharge system and method
EP3113745B1 (en) Heel protection mattress
CN207220563U (en) A kind of sofa with autoinflation air cushion
EP3072419B1 (en) Air mattress system and inflation and deflation pressure regulation system and method
CN210520955U (en) Pulse feeling instrument
AU2018262273A1 (en) Patient handling apparatus and method
CN213465749U (en) A leg care support
CN118576425B (en) Mattress control system, method, device and medium
CN211095714U (en) Inflatable operation lateral position is with armpit supporting pad
CN102813590A (en) Inclined back-lying support
EP3753541B1 (en) Anti-decubitus method and device
CN115919599A (en) Intelligent adjustable waist support of dental therapeutic machine and adjusting method thereof
GB2561977A (en) Pump unit for alternating pressure mattress for heel protection
CN212235066U (en) Medical inflatable mattress
CN107224380A (en) The deformable posture pad of inflatable
TWM438192U (en) Improved silencer configuration structure of unit arranging type air cushion bed

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant