CN103334524B - Construction method for spherical glass curtain wall with aluminum alloy hidden frame - Google Patents

Construction method for spherical glass curtain wall with aluminum alloy hidden frame Download PDF

Info

Publication number
CN103334524B
CN103334524B CN201310314526.2A CN201310314526A CN103334524B CN 103334524 B CN103334524 B CN 103334524B CN 201310314526 A CN201310314526 A CN 201310314526A CN 103334524 B CN103334524 B CN 103334524B
Authority
CN
China
Prior art keywords
aluminium alloy
aluminum alloy
alloy joist
spherical
refute
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310314526.2A
Other languages
Chinese (zh)
Other versions
CN103334524A (en
Inventor
程美华
郑伦
王志明
匡俊安
双全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Oriental Decoration Co Ltd
Original Assignee
China Construction Third Bureau Oriental Decoration Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Bureau Oriental Decoration Design Co Ltd filed Critical China Construction Third Bureau Oriental Decoration Design Co Ltd
Priority to CN201310314526.2A priority Critical patent/CN103334524B/en
Publication of CN103334524A publication Critical patent/CN103334524A/en
Application granted granted Critical
Publication of CN103334524B publication Critical patent/CN103334524B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention discloses a construction method for a spherical glass curtain wall with an aluminum alloy hidden frame. The method is characterized by comprising the following steps of firstly, performing three-dimension molding on a spherical steel structure according to a construction drawing, establishing a space coordinate system, and determining the space coordinate of each connecting point by using the space coordinate system; secondly, installing the spherical steel structure according to the space coordinates determined in the last step; thirdly, after the steel structure is install, welding a metal connecting piece at one end of each cylindrical connecting piece connected with an inner keel of the steel structure, and installing aluminum alloy keels on the metal connecting pieces, wherein the aluminum alloy keels are connected with the metal connecting pieces by using stainless steel bolts; fourthly, measuring the size of a triangle enclosed by each aluminum alloy keels, cutting glass according to measured sizes, and numbering; and finally, installing and fixing glass of corresponding numbers in corresponding triangular aluminum alloy keel frames, and performing essential decoration. The method has the advantages of low construction cost and high speed.

Description

Spherical band aluminum alloy hidden frame Glass Curtain Wall Construction method
Technical field
The present invention relates to a kind of construction techniques, especially a kind of construction method of spherical steel structure glass curtain wall, specifically a kind of spherical band aluminum alloy hidden frame Glass Curtain Wall Construction method.
Background technology
At present, along with social progress and rapid economic development, the spherical steel work of many moulding uniquenesses has all been built in various places, additional concealed frame glass curtain wall, very large aesthetic feeling is brought to whole building, construction due to spheroid is a quite complicated process, still have no precedent to go by, the problem that aluminium alloys spheroid concealed frame glass curtain wall on spheroid steel work adapts to space curved surface change and the distortion of absorption spherical net brace and construction error cannot solve in traditional concealed frame glass curtain wall always, main cause is that composition spheroid curtain wall is made up of a hundreds of metal connecting piece, each metal connecting piece has the key keel of curtain wall of five or six different length different angles be attached thereto to connect, each refuting so just is caused to connect pawl and want mold to customize, amount to and need to customize the different metal connecting piece of several thousand angles, and each angle needs scene to measure, repeatedly die sinking, construction cost is made to exceed estimated cost.Therefore, invent a kind of new construction method, design universal metal connector is the key of spherical steel construction curtain wall construction.
Summary of the invention
The object of the invention is for not having needed for ripe spherical steel structure glass curtain wall construction technology and traditional construction method that die sinking quantity is large, cost is high, construction period length waits series of problems, invent that a kind of cost is low, construction method, the spherical band aluminum alloy hidden frame Glass Curtain Wall Construction method promoted can be repeated.
Technical scheme of the present invention is:
A kind of spherical band aluminum alloy hidden frame Glass Curtain Wall Construction method, is characterized in that it comprises the following steps:
First, spherical steel work is carried out three-dimensional according to construction drawing and puts mould, set up space coordinates, utilize space coordinates to determine the space coordinates of each tie point;
Secondly, according to the determined space coordinates of upper step, spherical steel work is installed;
3rd, after Steel Structure Installation, again at one end weld metal connector of each cylinder-shaped link of connection steel work dragon in-seam, then on metal connecting piece, aluminium alloy joist is installed, between aluminium alloy joist with metal connecting piece, utilizes stainless steel bolt to be connected;
4th step, measures the leg-of-mutton size that each aluminium alloy joist surrounds, pulls glass and number by measured size;
Finally, the glass of reference numeral is fixed in corresponding triangle aluminium alloy joist frame, carries out necessary finishing.
Described metal connecting piece comprises and connects base 1, adjustable connecting components 2, refute to connect dish 3 and refute and connect pawl 4, one end of described connection base 1 and the cylinder-shaped link 5 of steel work are weldingly connected, its upper end is provided with lower terminal pad 6, the lower end of adjustable connecting components 2 is provided with terminal pad 7, upper terminal pad 7 is connected with lower terminal pad 6 by connecting bolt 8, the upper end of described adjustable connecting components 2 is provided with the jack of refuting the cylindrical end connecing dish 3 for plug-in mounting, the radial location pin making to refute the cylindrical end location connecing dish 3 is provided with in the upper end of adjustable connecting components 2, refute the one end connecing pawl 4 to be welded on to refute and to connect on the disk end of dish 3, the other end to insert in aluminium alloy joist 10 and by through aluminium alloy joist 10 with refute the stainless steel bolt connecing pawl 4 and be connected with aluminium alloy joist 10.
Described each refute to connect dish 3 is welded with 5 or 6 and refutes and connect pawl 4, each extended line of refuting the center line connecing the aluminium alloy joist that pawl 4 is installed is crossing with the axial line of adjustable connecting components 2.
Beneficial effect of the present invention:
The present invention just can meet the variation issue of refuting and connecing pawl multi-angle by welding processing, and designed fastener structure is unified, can be mass, without the need to repeatedly die sinking, significantly reduces cost.
Main joist of the present invention and refuting connect between pawl by by the inner chamber of stainless steel bolt through keel, and then to be connected with spheroid bluff piece with stainless steel bolt, to considerably increase the anti-twisting property of main joist, the safety of whole curtain wall can be guaranteed.
All spherical steel structure keel components of the present invention can all accurately be measured at the scene, the direct welding procedure to scene after processing factory's completion of processing after carefully calculating.
Whole spherical system can hyperboloid change.
Speed of application is fast, precision is high.Various component is processed in advance in factory, is transported to site assembly operation.
With high content of technology, construction technology is advanced, workable, procedure connection tight, and quality easily ensures, and can produce obvious economic benefit.
Accompanying drawing explanation
Fig. 1 is the perspective view of metal connecting piece of the present invention.
Fig. 2 of the present inventionly refutes the structural representation connecing pawl.
Fig. 3 is the syndeton schematic diagram of metal connecting piece of the present invention and steel work ball contact.
Detailed description of the invention
Below in conjunction with drawings and Examples, the present invention is further illustrated.
As Figure 1-3.
A kind of spherical band aluminum alloy hidden frame Glass Curtain Wall Construction method, it comprises the following steps:
First, spherical steel work is carried out three-dimensional according to construction drawing and puts mould, set up space coordinates, utilize space coordinates to determine the space coordinates of each tie point;
Secondly, according to the determined space coordinates of upper step, spherical steel work is installed;
3rd, after Steel Structure Installation, again at one end weld metal connector of each cylinder-shaped link of connection steel work dragon in-seam 11, then on metal connecting piece, aluminium alloy joist is installed, between aluminium alloy joist with metal connecting piece, utilizes stainless steel bolt to be connected, described metal connecting piece is as Fig. 1, shown in 2, it comprises and connects base 1, adjustable connecting components 2, refute to connect dish 3 and refute and connect pawl 4, one end of described connection base 1 and the cylinder-shaped link 5 of steel work are weldingly connected, its upper end is provided with lower terminal pad 6, the lower end of adjustable connecting components 2 is provided with terminal pad 7, upper terminal pad 7 is connected with lower terminal pad 6 by connecting bolt 8, the upper end of described adjustable connecting components 2 is provided with the jack of refuting the cylindrical end connecing dish 3 for plug-in mounting, the radial location pin making to refute the cylindrical end location connecing dish 3 is provided with in the upper end of adjustable connecting components 2, refute the one end connecing pawl 4 to be welded on to refute and to connect on the disk end of dish 3, the other end to insert in aluminium alloy joist 10 and by through aluminium alloy joist 10 with refute the stainless steel bolt connecing pawl 4 and be connected with aluminium alloy joist 10.Described each refute to connect dish 3 is welded with 5 or 6 and refutes and connect pawl 4, each extended line of refuting the center line connecing the aluminium alloy joist that pawl 4 is installed is crossing with the axial line of adjustable connecting components 2.The annexation of aluminium alloy joist and steel structure keel connector as shown in Figure 3.
4th step, after each aluminium alloy joist is had good positioning, then measures the leg-of-mutton size that each aluminium alloy joist surrounds, pulls glass and number by measured size;
Finally, the glass of reference numeral is fixed in corresponding triangle aluminium alloy joist frame, carries out necessary finishing, as installed briquetting, strip of paper used for sealing etc.
Details are as follows:
1.1 construction technology process.
Preparation of construction → surveying setting-out makes that the size → steel beam column of all steel beam column and aluminium alloy extrusions and installation of embedded parts → steel beam column oil paint coating → spherical Steel Structure Installation → steel work examination → metal connecting piece installation → aluminium alloy joist install → accurately measure that glass size → surface layer glass is installed → reinforced, adjustment, leveling → surface clean → completion acceptance.
1.2 key points for operation.
1) preparation of construction
A, by drawing and national decorative engineering job specfication requirement construction, spherical steel work is measured and unwrapping wire location, main steel beam column, ball link, metal connecting piece, aluminium alloy joist are checked by number, guarantee that material is complete, and numbering accurately.
B, set up close or semi-enclosed processing place, guarantee material ruly carry out assembled, assembling, prevent damage.Main material and accessory, by proportioning supply, notice that protecting spare and accessory parts does not lose, the particularly tiny accessory such as bolt, nut.
C, fabricating yard should be arranged in roof without workman's operation, without the ground of tower crane process, keep dry, ground does not have ponding, before installation, reply scene is cleaned, Scale Removal, dust, greasy dirt, foreign material, on workbench, requirement leatheroid or other flexible material cushion, in case product is scraped or ground away.
2) installation of steel beam column and built-in fitting.
The location of built-in fitting, the mark first done according to initial the construction line-putting position is buried underground, then utilizes total powerstation to carry out surveying setting-out location at the coordinate system originally established to each point, is finally installed by spherical welding for steel structure.
3) steel beam column coating process.
Steel structure coating is divided into factory and on-the-spot two parts, and all component priming paint completes in factory, on-site consolidation, welded after, do surfacing to welding position, carry out the work of benefit priming paint, intermediate coat, finish paint carry out spraying by factory application personnel at the scene to be completed.
All coating, by application Aided design requirement buying, should have the constitutional law of regulation to determine the coating test certificate of testing agency, only have qualified coating material could be used for the coating decoration of this engineering when coating enters factory.
Application should be even, nothing obviously wrinkling, sagging, and attachment should be good; Must not drench with rain within 4h after application, prevent the paint film not yet solidified from being washed out by rainwater.
After oil paint coating, paint film, as found that there is be full of cracks, should to strike off during the phenomenon such as wrinkling or with after sand paper grinding by paint film, touch-up paint again.After oil paint coating, as found that there is bubble, depression hole, peel off get rusty or the phenomenon such as pin hole rust time, paint film should to be struck off and after surfacing, then to be coated with ETL estimated time of loading interlayer by regulation and to give touch-up paint.
4) aluminium alloy extrusions is checked.
A, Full Container Load to be uncarted, and be placed on smooth clean ground or other platform.Stack according to the direction of arrow in packaging, each label unification will be cleaned totally towards scene when a placement, heap putting material, and by the smooth stacking of mark classification, stacking height must not more than 6 layer, and forbid the destructions such as people sits or steps on material, avoid drenching with rain and exposure in sunshine.
To handle with care when b, carrying aluminium alloy extrusions, when carrying or installation, notice that aluminium alloy extrusions wants more than two people to coordinate simultaneously, to avoid collision deformation or do floriation face.
5) installation of aluminium alloy joist.
The installation of a, metal connecting piece: utilize the point of total powerstation to each connection metal connector of the keel of aluminium alloys and steel joist carry out again unwrapping wire and correct and record its point, then welding is refuted and is connect pawl, after metal connecting piece is tentatively fixing, need to adjust, ensure that the deviation of the mid point of metal connecting piece and the central point of ball link is within 20mm.
The installation of b, aluminium alloy joist, first according to keel typesetting numbering, aluminium alloy joist is arranged, then the stainless steel bolt of M10*45 is utilized aluminium alloy joist and iron plate to be coupled together, by the inner chamber of stainless steel bolt through keel, then connect pawl and be connected with refuting, which adds the anti-twisting property of main joist, guarantee the safety of whole curtain wall;
The central point (this central point be the intersection point of the reverse extending line of all aluminium alloy joist center line that with this metal connecting piece be connected) of total powerstation to each metal connecting piece is again utilized to check after c, aluminium alloy joist install, guarantee in the same horizontal line, if do not finely not tuned by metal connecting piece more in the same horizontal line, control errors is within ± 5mm, and then fastening bolt and full weld are refuted and connect pawl.
D, wear Ethylene Propylene Terpolymer sealing joint strip and aluminium alloy joist buckle closure is installed
6) installation of glass.
Check before a, installation:
Check 1: glass numbering size whether with under plan single causing.
Check 2: on aluminium-alloy pipe keel, whether all sealing joint strips install.
Check 3: whether the secondary frame of glass bonds firmly and meet the requirements.
Check 4: whether safety rope is installed firmly, and whether the plank on scaffold completely spreads.
B, due to glass deadweight about 100 kilograms, artificial upwards transmission is adopted to realize carrying, personnel coordinate up and down, because whole height is not high, often arranging 2 people that scaffold stands, utilizing and manually transport, then utilize glass holder taken out from hole by glass and install, all workmans must fasten seat belts, to ensure safety.
After glass is in place, last installation briquetting can be carried out and tighten operation.
The part that the present invention does not relate to prior art that maybe can adopt all same as the prior art is realized.

Claims (2)

1. a spherical band aluminum alloy hidden frame Glass Curtain Wall Construction method, is characterized in that it comprises the following steps:
First, spherical steel work is carried out three-dimensional according to construction drawing and puts mould, set up space coordinates, utilize space coordinates to determine the space coordinates of each tie point;
Secondly, according to the determined space coordinates of upper step, spherical steel work is installed;
3rd, after Steel Structure Installation, again at one end weld metal connector of each cylinder-shaped link of connection steel work dragon in-seam, then on metal connecting piece, aluminium alloy joist is installed, between aluminium alloy joist with metal connecting piece, utilizes stainless steel bolt to be connected;
4th step, measures the leg-of-mutton size that each aluminium alloy joist surrounds, pulls glass and number by measured size;
Finally, the glass of reference numeral is fixed in corresponding triangle aluminium alloy joist frame, carries out necessary finishing;
Described metal connecting piece comprises and connects base (1), adjustable connecting components (2), refute to connect dish (3) and refute and connect pawl (4), one end of described connection base (1) and the cylinder-shaped link (5) of steel work are weldingly connected, its upper end is provided with lower terminal pad (6), the lower end of adjustable connecting components (2) is provided with terminal pad (7), upper terminal pad (7) is connected with lower terminal pad (6) by connecting bolt (8), the upper end of described adjustable connecting components (2) is provided with the jack of refuting the cylindrical end connecing dish (3) for plug-in mounting, the radial location pin making to refute the cylindrical end location connecing dish (3) is provided with in the upper end of adjustable connecting components (2), refuting the one end connecing pawl (4) is welded on the disk end of refuting and connecing dish (3), the other end to insert in aluminium alloy joist (10) and by through aluminium alloy joist (10) with refute the stainless steel bolt connecing pawl (4) and be connected with aluminium alloy joist (10).
2. method according to claim 1, it is characterized in that described each refute to connect dish (3) is welded with 5 or 6 and refutes and connect pawl (4), each extended line of refuting the center line connecing the upper aluminium alloy joist installed of pawl (4) is crossing with the axial line of adjustable connecting components (2).
CN201310314526.2A 2013-07-25 2013-07-25 Construction method for spherical glass curtain wall with aluminum alloy hidden frame Active CN103334524B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310314526.2A CN103334524B (en) 2013-07-25 2013-07-25 Construction method for spherical glass curtain wall with aluminum alloy hidden frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310314526.2A CN103334524B (en) 2013-07-25 2013-07-25 Construction method for spherical glass curtain wall with aluminum alloy hidden frame

Publications (2)

Publication Number Publication Date
CN103334524A CN103334524A (en) 2013-10-02
CN103334524B true CN103334524B (en) 2015-05-06

Family

ID=49242726

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310314526.2A Active CN103334524B (en) 2013-07-25 2013-07-25 Construction method for spherical glass curtain wall with aluminum alloy hidden frame

Country Status (1)

Country Link
CN (1) CN103334524B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103953197B (en) * 2014-05-13 2016-08-24 深圳市宝鹰建设集团股份有限公司 Glass curtain wall construction method
CN111877771B (en) * 2020-06-28 2022-03-15 上海市建筑装饰工程集团有限公司 Digital coordinate positioning method for special-shaped curtain wall keel
CN111877618A (en) * 2020-08-05 2020-11-03 大潮建设集团有限公司 Mounting structure and mounting method of glass curtain wall
CN112832434B (en) * 2021-02-23 2025-08-12 北京中铁装饰工程有限公司 Multi-point connection system for special-shaped metal curtain wall

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200958250Y (en) * 2006-09-30 2007-10-10 珠海市晶艺玻璃工程有限公司 Universal connector
CN201460115U (en) * 2009-07-15 2010-05-12 华东建筑设计研究院有限公司 Universal adjustment transfer fixed node of building curtain unit plate
CN102230322A (en) * 2010-09-25 2011-11-02 上海玻机幕墙工程有限公司 Connection device capable of adjusting in three-dimension direction
CN102493583A (en) * 2011-12-16 2012-06-13 深圳市三鑫幕墙工程有限公司 Variable angle coupling mechanism
CN102535844A (en) * 2012-02-10 2012-07-04 中国建筑第八工程局有限公司 Construction method for spherical curved surface stainless steel curtain wall

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2737855Y (en) * 2004-04-29 2005-11-02 珠海市晶艺玻璃工程有限公司 Glass curtain wall and roofing rotary disc connecting parts

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200958250Y (en) * 2006-09-30 2007-10-10 珠海市晶艺玻璃工程有限公司 Universal connector
CN201460115U (en) * 2009-07-15 2010-05-12 华东建筑设计研究院有限公司 Universal adjustment transfer fixed node of building curtain unit plate
CN102230322A (en) * 2010-09-25 2011-11-02 上海玻机幕墙工程有限公司 Connection device capable of adjusting in three-dimension direction
CN102493583A (en) * 2011-12-16 2012-06-13 深圳市三鑫幕墙工程有限公司 Variable angle coupling mechanism
CN102535844A (en) * 2012-02-10 2012-07-04 中国建筑第八工程局有限公司 Construction method for spherical curved surface stainless steel curtain wall

Also Published As

Publication number Publication date
CN103334524A (en) 2013-10-02

Similar Documents

Publication Publication Date Title
CN101691787B (en) Converse construction process for middle-high steel structure building
CN103334524B (en) Construction method for spherical glass curtain wall with aluminum alloy hidden frame
CN103541474A (en) Construction method for using layering method to construct double-curved-surface stainless steel curtain wall
CN112431420A (en) Construction method of large-span double-sided arc aluminum plate curtain wall
CN106624639B (en) Manufacturing and hoisting method for pre-spliced short joint of large valve and large-diameter pipeline
CN107882220A (en) A kind of construction method of L-shaped biplane hyperbolic aluminum facade
CN106193514B (en) Irregular hyperboloid bamboo aluminum composite plate construction method
CN207469541U (en) A kind of curved surface aluminum plate curtain wall system
CN103265066B (en) Making and construction method of chlorination furnace
CN112554345A (en) Ground splicing and integral lifting construction method for large-span welding ball net rack
CN102465600B (en) Steel structure framework of benzene hydrogenation main device in benzene hydrogenation engineering preparation method
CN101856783A (en) Integral manufacturing and mounting method of large aluminum alloy stock bin
CN110528891A (en) Large-span Spherical rack integral hoisting method
CN114000626B (en) Construction method of hyperbolic aluminum plate curtain wall
CN113323359A (en) Novel flower basket pull rod tool type overhanging frame construction method
CN106120664B (en) Ship lift tail-bay main gate construction method
CN105863188A (en) Prefabricated staircase integrated with guardrail, prefabricated air conditioner plate and construction method thereof
CN104452963A (en) A method for manufacturing and constructing steel truss key component
CN111546003B (en) Method for manufacturing arch rib of flexible arch bridge
CN103758355B (en) Concealed frame glass curtain wall double glazing is without auxiliary frame installation method
CN107256790A (en) Corrugated sheet tank production line and corrugated tank production method
CN206268599U (en) Pipeline installation system
CN110761560A (en) Mounting and construction method for steel bracket-arch lifting composite structure of pseudo-classic architecture
CN106193412B (en) Hang mounting method under fire-fighting spraying under a kind of mineral wool board ceiling form
CN203514775U (en) Wall formwork for combined aluminum formwork

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 210019 building 136, 2 Mount Lu Road, Jianye District, Jiangsu, Nanjing

Patentee after: Built in East Decoration Co. Ltd.

Address before: 210019 building 136, 2 Mount Lu Road, Jianye District, Jiangsu, Nanjing

Patentee before: Dongfang Decoration Design Engineering Co., Ltd. of China Construction Third Engineering Bureau