CN101619933B - Method for righting inclined deformation of waste incineration cooling spray tower - Google Patents

Method for righting inclined deformation of waste incineration cooling spray tower Download PDF

Info

Publication number
CN101619933B
CN101619933B CN2009101044468A CN200910104446A CN101619933B CN 101619933 B CN101619933 B CN 101619933B CN 2009101044468 A CN2009101044468 A CN 2009101044468A CN 200910104446 A CN200910104446 A CN 200910104446A CN 101619933 B CN101619933 B CN 101619933B
Authority
CN
China
Prior art keywords
spray tower
jack
tower body
tower
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009101044468A
Other languages
Chinese (zh)
Other versions
CN101619933A (en
Inventor
曾维荣
王卫东
张学伦
向法文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Iron and Steel Group Co Ltd
Original Assignee
Chongqing Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Iron and Steel Group Co Ltd filed Critical Chongqing Iron and Steel Group Co Ltd
Priority to CN2009101044468A priority Critical patent/CN101619933B/en
Publication of CN101619933A publication Critical patent/CN101619933A/en
Application granted granted Critical
Publication of CN101619933B publication Critical patent/CN101619933B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses a method for righting the inclined deformation of a waste incineration cooling spray tower, which comprises the steps of collecting relevant data of the inclined deformation spray tower through measurement, adopting a support frame jack to jack and reset, arranging a jack support base above each steel pipe upright, fixing the steel pipe uprights through a plurality of horizontal support rods and inclined support rods, and welding the steel pipe uprights into a three-dimensional bearing framework; a plurality of jacks are arranged between the jack support base and the support base; the tower body is firmly supported by a jack so as to be convenient for removing inlet and outlet equipment and pipelines; and (4) according to the detection data, after jacking and resetting are carried out by using the jacks, respectively manufacturing the jacks to replace the support according to the actual jacking size of each jack, and connecting and fixing the support on the cylinder with the steel pipe upright post. The invention can centralize the inclined and deformed spray tower under the conditions that the surrounding geographical conditions of the spray tower equipment are poor and the lifting equipment cannot be adopted for construction, thereby shortening the construction period and greatly reducing the construction cost.

Description

Waste incineration cooling spray tower inclination and distortion set upright processing method
Technical field
After the present invention relates to a kind of waste incineration cooling spray tower steel construction inclination and distortion, set upright the construction method of processing.
Background technology
The spray tower steel structure framework is used in garbage disposal; Through after the several years or weight of dust increase in, spray tower poor because of the geographical position; Spray tower steel structure framework, particularly column and crossbeam distortion occurs and cause the spray tower top to tilt, and need set upright with steel structure framework spray tower and change.Applicant is taken over the waste incineration cooling 1# spray tower of certain the garbage disposal company that handles, and its steel structure framework is not because of bearing the weight of spray tower and Ta Nei dust, and column and crossbeam distortion occurs and cause the about 300mm of spray tower top inclination; And the spray tower barrel diameter is 11.3m; Highly be 31m (comprising steel structure framework), the about 120t of weight, and the landform around this spray tower equipment is very complicated; Cable pipeline is intricate, is unfavorable for the lifting of setting upright of tower body equipment; Especially the restriction in place around the spray tower can not adopt conventional large-scale, the medium-sized lifting appliance of usefulness to set upright processing, and the duration of perhaps adopting large-scale, medium-sized lifting appliance to set upright processing is oversize, operating expenses is too high.In the prior art, geographical conditions are not poor around spray tower equipment, the buried cable pipeline is intricate, can not carry out the technology or the teachings that the spray tower steel structure framework under the situation such as lifting is set upright and changed of setting upright of tower body equipment.
Summary of the invention
After the present invention is directed to waste incineration cooling spray tower steel construction inclination and distortion; Geographical conditions are poor all around, the buried cable pipeline is intricate because of spray tower equipment; Can not adopt large-scale, medium-sized lifting appliance to lift the actual conditions of setting upright, provide a kind of method of operating simple, shorten the construction period, reduce operating expenses waste incineration cooling spray tower inclination and distortion set upright processing method.
Technical scheme of the present invention: waste incineration cooling spray tower inclination and distortion set upright processing method, it is characterized in that comprising the steps:
A, gather the related data of the spray tower of inclination and distortion through measurement; Offset dimensions like spray tower tower body perpendicularity, tower body absolute altitude, tower body center line; Confirm that according to above-mentioned measurement data spray tower sets upright the correlation technique parameter of processing, as set upright the direction and the absolute altitude of processing;
B, the jacking of employing bracing frame jack reset;
(1), according to arts demand, makes, installs some steel pipe posts in the outside of spray tower tower body and spray tower steel structure framework;
(2) below every steel pipe post with steel plate as the column base plate, to increase receiving area;
(3) above every steel pipe post, make, install the jack base for supporting; And fixing with steel pipe post welding, be used to increase the force intensity that receives on steel pipe post top;
C, steel pipe post is fixed with some horizontal support bars and inclined support bar in the position that escapes former spray tower steel structure framework, be welded to each other and be integral, horizontal support bar, inclined support bar and steel pipe post form three-dimensional load-bearing skeleton;
The supporting seat that D, making above jack, installation are connected with tower body, several jack of arts demand are placed between jack base for supporting and the supporting seat;
E, several jack of usefulness are with the tower body firm supporting, and the back of guaranteeing to stop production removes import and export equipment and pipeline construction is carried out smoothly;
After F, import and export equipment and the pipeline complete removal that is connected with tower body finish; Confirm direction and the absolute altitude that spray tower recovers according to the detection data of step 1; Carry out jacking with jack; Simultaneously the four direction at spray tower weighs down messenger wire with line, and detection at any time guarantees that tower body recovers vertical and puts in place with center line in length and breadth.
G, tower body jacking reset after the according with process requirements, make jack respectively according to the actual jacking size of each jack and substitute bearing, supporting seat on the cylindrical shell is connected with steel pipe post fixes, and main purpose is the increase stress surface;
H, change one or more member of former steel structure frame,, guarantee the replacing of next step operation steel structure frame of the disconnection that is connected of this member with former steel structure frame like needs.
Further characteristic is: the described measuring method of above-mentioned steps A is:
(1) detection of spray tower tower body perpendicularity: tell vertical point at cat head, weigh down messenger wire with line, detect the tower body perpendicularity of four direction, confirm the tower body incline direction and write down tilt value at four direction;
(2) detection of spray tower tower body absolute altitude:, confirm the size that tower body need recover and write down tilt value with the ground elevation of spirit level measurement tower body supporting seat;
(3) spray tower tower body center line detects: backguy detects the offset dimensions that spray tower is imported and exported center line, confirms that tower body recovers direction;
(4) confirm direction and the absolute altitude that spray tower recovers according to above-mentioned detection data, to confirm jacking direction and height.
Waste incineration cooling spray tower inclination and distortion of the present invention set upright processing method, with respect to prior art, have following characteristics:
1, geographical conditions are poor around the spray tower equipment, the buried cable pipeline is intricate; Can not adopt large-scale, medium-sized lifting appliance to lift the actual conditions of setting upright; The spray tower of inclination and distortion is set upright processing, eliminated the caused hidden danger of spray tower inclination and distortion; Simultaneously, prolonged the service life of a whole set of garbage combustion device.
2, can shorten the construction period, satisfy user's needs.
3, can reduce operating expenses significantly.
Description of drawings
Accompanying drawing is that steel pipe post of the present invention, horizontal support and bearing diagonal form three-dimensional load-bearing skeleton sketch map;
The specific embodiment
Waste incineration cooling spray tower inclination and distortion of the present invention set upright processing method, comprise the steps:
1, gathers the related data of the spray tower of inclination and distortion through measurement; Offset dimensions like spray tower tower body perpendicularity, tower body absolute altitude, tower body center line; Confirm that according to above-mentioned measurement data spray tower sets upright the correlation technique parameter of processing, as set upright the direction and the absolute altitude of processing; Concrete measuring method is following:
(1) detection of spray tower tower body perpendicularity: tell vertical point at cat head, weigh down messenger wire with line, detect the tower body perpendicularity of four direction, confirm the tower body incline direction and write down tilt value at four direction.
(2) detection of spray tower tower body absolute altitude:, confirm the size that tower body need recover and write down tilt value with the ground elevation of spirit level measurement tower body supporting seat.
(3) spray tower tower body center line detects: backguy detects the offset dimensions that spray tower is imported and exported center line, confirms that tower body recovers direction;
(4) confirm direction and the absolute altitude (being convenient to confirm jacking direction and height) that spray tower recovers according to above-mentioned detection data.
2, adopt the jacking of bracing frame jack to reset;
(1), according to arts demand, makes, installs some steel pipe posts (as four, five) in the outside of spray tower tower body and spray tower steel structure framework;
(2) below every steel pipe post with steel plate as the column base plate, to increase receiving area; Consider the ability to bear on ground, the steel plate with 1200 * 1200 * 40mm below every steel pipe post increases receiving area as base plate;
(3) above every steel pipe post, make, install the jack base for supporting; And fixing with steel pipe post welding, be used to increase the force intensity that receives on steel pipe post top.
3, steel pipe post is fixed with horizontal support bar and inclined support bar in the position that escapes former spray tower steel structure framework; Be welded to each other together; Horizontal support bar, inclined support bar and steel pipe post form three-dimensional load-bearing skeleton, guarantee that mechanical properties such as its intensity, rigidity meet construction requirement.
4, the supporting seat that making above jack, installation are connected with tower body, several jack of arts demand are placed between jack base for supporting and the supporting seat; Consider that the tower body is that the 8mm steel plate is made,, therefore tower body has been carried out the arc plate and strengthened handling for guaranteeing not cause the tower body distortion in the jacking process.
5, use several jack with the tower body firm supporting, the back of guaranteeing to stop production removes import and export equipment and pipeline construction is carried out smoothly;
6, import and export equipment is with after the pipeline complete removal that is connected with tower body finishes; Confirm direction and the absolute altitude that spray tower recovers according to the detection data of step 1; Carry out jacking with jack; Simultaneously the four direction at spray tower weighs down messenger wire with line, and detection at any time guarantees that tower body recovers vertical and puts in place with center line in length and breadth.
7, after the tower body jacking resets according with process requirements, make jack respectively according to the actual jacking size of each jack and substitute bearing, supporting seat on the cylindrical shell is connected with steel pipe post fixes, main purpose is to increase stress surface;
8, change one or more member of former steel structure frame like needs,, guarantee carrying out smoothly of next step operation steel structure frame component replacement of the disconnection that is connected of this member with former steel structure frame.
Below in conjunction with accompanying drawing the present invention is further described:
In spray tower tower body 1 outside, avoid spray tower tower body and spray tower steel structure framework, many steel pipe posts 2 are set; Column base plate 3 has been set up to increase receiving area in the lower end of steel pipe post 2; On the top of every steel pipe post 2, jack base for supporting 4 is set, jack 5 is placed on the jack base for supporting 4; At each supporting seat 6 is set above the jack 5, supporting seat 6 firmly connects with spray tower tower body or spray tower steel construction through welding mutually.Between steel pipe post 2, horizontal support bar 7 and inclined support bar 8 are set, firmly integrally welded each other; Assurance has qualified intensity, rigidity etc. by the three-dimensional load-bearing skeleton that steel pipe post 2, horizontal support bar 7 and inclined support bar 8 constitute, and satisfies the needs of construction stage mechanical property.
Set upright when construction, confirm direction and the absolute altitude that spray tower recovers, adjust the actual jacking size of each jack 5, set upright spray tower and steel structure framework thereof, make the tower body jacking according with process requirements that resets according to the detection data of step 1.

Claims (2)

  1. Waste incineration cooling spray tower inclination and distortion set upright processing method, it is characterized in that comprising the steps:
    A, gather the data of the spray tower of inclination and distortion through measurement; The offset dimensions that comprises spray tower tower body perpendicularity, tower body absolute altitude, tower body center line; Confirm that according to above-mentioned measurement data spray tower sets upright the Treatment Technology parameter, comprise direction and the absolute altitude of setting upright processing;
    B, the jacking of employing bracing frame jack reset;
    (1), according to arts demand, makes, installs some steel pipe posts in the outside of spray tower tower body and spray tower steel structure framework;
    (2) below every steel pipe post with steel plate as the column base plate, to increase receiving area;
    (3) above every steel pipe post, make, install the jack base for supporting; And fixing with steel pipe post welding, be used to increase the force intensity that receives on steel pipe post top;
    C, steel pipe post is fixed with some horizontal support bars and inclined support bar in the position that escapes former spray tower steel structure framework, be welded to each other and be integral, horizontal support bar, inclined support bar and steel pipe post form three-dimensional load-bearing skeleton;
    The supporting seat that D, making above jack, installation are connected with tower body, several jack of arts demand are placed between jack base for supporting and the supporting seat;
    E, several jack of usefulness are with the tower body firm supporting, and the back of guaranteeing to stop production removes import and export equipment and pipeline construction is carried out smoothly;
    After F, import and export equipment and the pipeline complete removal that is connected with tower body finish; Confirm direction and the absolute altitude that spray tower recovers according to the detection data of steps A; Carry out jacking with jack; Simultaneously the four direction at spray tower weighs down messenger wire with line, and detection at any time guarantees that tower body recovers vertical and puts in place with center line in length and breadth;
    G, tower body jacking reset after the according with process requirements, make jack respectively according to the actual jacking size of each jack and substitute bearing, supporting seat on the cylindrical shell is connected with steel pipe post fixes, and main purpose is the increase stress surface; That that makes that supporting seat, jack substitute bearing, jack base for supporting, steel pipe post firmly is welded into an integral body, the weight of bearing spray tower;
    H, change one or more member of former steel structure frame like needs, with the be connected disconnection of this member with former steel structure frame, what guarantee that next step operation steel structure frame changes carries out smoothly.
  2. 2. waste incineration cooling spray tower inclination and distortion according to claim 1 set upright processing method, it is characterized in that: the described measuring method of above-mentioned steps A is:
    (1) detection of spray tower tower body perpendicularity: tell vertical point at cat head, weigh down messenger wire with line, detect the tower body perpendicularity of four direction, confirm the tower body incline direction and write down tilt value at four direction;
    (2) detection of spray tower tower body absolute altitude:, confirm the size that tower body need recover and write down tilt value with the ground elevation of spirit level measurement tower body supporting seat;
    (3) spray tower tower body center line detects: backguy detects the offset dimensions that spray tower is imported and exported center line, confirms that tower body recovers direction;
    (4) confirm direction and the absolute altitude that spray tower recovers according to above-mentioned detection data, to confirm jacking direction and height.
CN2009101044468A 2009-07-27 2009-07-27 Method for righting inclined deformation of waste incineration cooling spray tower Expired - Fee Related CN101619933B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101044468A CN101619933B (en) 2009-07-27 2009-07-27 Method for righting inclined deformation of waste incineration cooling spray tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101044468A CN101619933B (en) 2009-07-27 2009-07-27 Method for righting inclined deformation of waste incineration cooling spray tower

Publications (2)

Publication Number Publication Date
CN101619933A CN101619933A (en) 2010-01-06
CN101619933B true CN101619933B (en) 2012-05-23

Family

ID=41513285

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101044468A Expired - Fee Related CN101619933B (en) 2009-07-27 2009-07-27 Method for righting inclined deformation of waste incineration cooling spray tower

Country Status (1)

Country Link
CN (1) CN101619933B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109163331A (en) * 2018-08-31 2019-01-08 佛山市锐拓环境工程设备有限公司 A kind of domestic waste residue treatment equipment for environmental protection engineering
CN115355721B (en) * 2022-08-03 2025-08-22 芜湖福记恒机械有限公司 A copper-steel composite water jacket

Also Published As

Publication number Publication date
CN101619933A (en) 2010-01-06

Similar Documents

Publication Publication Date Title
CN113653334A (en) Method for installing dome structure of single-layer metal reticulated shell
CN101619933B (en) Method for righting inclined deformation of waste incineration cooling spray tower
CN102393003A (en) Steam generator and assembling method thereof
CN101838986A (en) Disassembling tool type lattice column and construction method thereof
CN209457508U (en) A kind of bridge construction protective fence
CN106140894A (en) Circle device adjusted by a kind of steel pipe
CN209671982U (en) A kind of horizontal steam generator heat-transfer pipe vortex detection device lifting device
CN216276803U (en) Assembled cylinder mound operation platform
CN215442487U (en) Energy-saving earthquake-resistant building structure
CN211651435U (en) Working platform test stand
JP5378043B2 (en) Steel tower supported chimney dismantling method
CN206129133U (en) A cat ladder for main transformer overhauls
CN201581625U (en) Sectional type terrace rack
CN201843083U (en) V-shaped support frame
CN209874467U (en) A template support frame for construction of silo awl shell
JP4559313B2 (en) Demolition method of steel tower supported chimney
CN109595447B (en) Lifting tool of vortex flow detection device for heat transfer tube of horizontal steam generator
CN221506478U (en) Grouting test support for grouting sleeve
CN207145762U (en) A kind of hanging type variable-force spring hanger of easy disassembly
CN210883042U (en) Adjustable vehicle-mounted glass screen cleaning basket
CN219453647U (en) Toppling prevention device for gas cylinder
CN204624379U (en) For promoting the balancing lift of guidepost
CN202930799U (en) Mounting brackets and power distribution units for distribution boxes
CN211083848U (en) Lamp post of quick installation
CN219898227U (en) Sample support frame of stainless steel ferric trichloride pitting test of simplification

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120523

Termination date: 20160727