Skip to content

ci(workflows): add semantic-release pipeline and PR commit linting #28

ci(workflows): add semantic-release pipeline and PR commit linting

ci(workflows): add semantic-release pipeline and PR commit linting #28

Triggered via push March 5, 2026 08:36
Status Failure
Total duration 24s
Artifacts

ci.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.11)
Process completed with exit code 1.
build (3.10)
The strategy configuration was canceled because "build._3_11" failed
build (3.10)
The operation was canceled.
build (3.9)
The strategy configuration was canceled because "build._3_11" failed
build (3.9)
The operation was canceled.