Skip to content

chore(release): prepare 1.15.0 - #161

Merged
XXPermanentXX merged 1 commit into
mainfrom
agent/release-1.15.0
Aug 15, 2026
Merged

chore(release): prepare 1.15.0#161
XXPermanentXX merged 1 commit into
mainfrom
agent/release-1.15.0

Conversation

@XXPermanentXX

Copy link
Copy Markdown
Collaborator

Summary

  • bump bailian-cli-core, bailian-cli-runtime, bailian-cli-commands, bailian-cli, and knowledge-studio-cli from 1.14.3 to 1.15.0
  • synchronize all first-party Bailian Skill metadata.version fields to 1.15.0
  • complete the version metadata required for the existing 1.15.0 changelog entry and stable Publish workflow

Validation

  • pnpm run sync:skill-assets
  • vp check (0 errors; 5 pre-existing warnings outside this diff)
  • CI=true node tools/release/publish-channel.mjs --channel test --knowledge --dry-run
    • generated references matched
    • all five packages built and packed
    • publint passed for all five packages
    • gitleaks found no leaks
  • git diff --check

@XXPermanentXX
XXPermanentXX merged commit f7d3250 into main Aug 15, 2026
2 checks passed
@XXPermanentXX
XXPermanentXX deleted the agent/release-1.15.0 branch August 15, 2026 06:51
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant