Skip to content

Latest commit

 

History

History

prd-combined-agent

README.md

file_type documentation
title PRD Combined Agent – Phase 2 Batch 2 + Phase 3 Consolidation
description Unified product requirements and planning agent: catalogue merge complete, structural folder consolidation drafted
last_updated 2026-09-10
status active
tags
agent-standards
phase-2
phase-3
prd
owners
lightspeedwp/maintainers

PRD Combined Agent – Phase 2 Batch 2 + Phase 3 Consolidation

Unifies two complementary product planning agents into a single multi-provider planning tool.

2026-09-10 update: Phase 2 Batch 2 merged the two agents at the catalogue/registry level only. A folder-level audit found the underlying agents/prd-agent/ and agents/prd-factory-planner-agent/ folders were never actually consolidated — see FOLDER_STRUCTURE_PLAN.md for the audit and target structure, and PLANNING.md — Phase 3 for status.

2026-09-10 update: The sibling project prd-agent-prompt-improvements-2026-08 (core-prompt v2.1 content enhancement, testing, and team rollout) has been folded into this project — its README and PLANNING content now live here as Phases 4-7 in PLANNING.md. That project's folder is being retired; see PLANNING.md — Prompt Enhancement Track for the merged scope.

2026-09-10 update: Phase 3 has now been fully audited, file-by-file, across all three of prd-factory-planner-agent's top-level areas — see SKILL_RECONCILIATION_REPORT.md (skills/), AGENT_FOLDER_RECONCILIATION_REPORT.md (agent/), and ROOT_FILES_RECONCILIATION_REPORT.md (AGENT.md/README.md). The real merge scope turned out to be much smaller than assumed: almost everything in prd-factory-planner-agent is either an exact duplicate or fabricated/aspirational content, not unique logic. The folder can be deleted outright once a handful of specific items are ported forward — see PLANNING.md — Phase 3 for the finalized, scoped deliverable list.

Quick Facts

Aspect Details
Agent PRD Agent (Product Requirements)
Version 2.0.0
Status Active
Providers Claude, Copilot, OpenAI
Merged prd-agent + prd-factory-planner-agent
Capabilities 14 core across all planning phases
Date 2026-07-23

Core Capabilities

PRD & Documentation

  • Executive summaries, requirements, metrics, constraints, risks

Feature Planning

  • Breakdown, impact/effort matrices, user stories, criteria

Timeline & Roadmap

  • Release planning, milestones, sprints, estimation, dependencies

Stakeholder Alignment

  • Requirements gathering, workflows, change management, templates

Validation ✅

  • ✅ Agent specification merged
  • ✅ Multi-provider configurations verified
  • ✅ Tool integrations confirmed
  • ✅ Capabilities documented
  • ✅ All resources documented
  • ✅ Agent catalogued

Part of: Agent Standardisation Initiative – Phase 2 (Epic #1079)
Completed: 2026-07-23 | Maintainer: Ash Shaw


Project Documents

Document Purpose Status
PLANNING.md Master phase plan — Phase 1-2 (catalogue merge, done), Phase 3 (structural consolidation, scoped), Phases 4-7 (Prompt Enhancement Track) 🟡 Active
OPENSPEC.md Technical-spec stub — points to FOLDER_STRUCTURE_PLAN.md until a real OpenSpec change proposal is created 🔵 Stub
FOLDER_STRUCTURE_PLAN.md Phase 3 master plan — target agents/prd-agent/ structure, open decisions, execution phases 🟡 Active
SKILL_RECONCILIATION_REPORT.md File-by-file diff of every skills/ folder shared between the two agents ✅ Complete
AGENT_FOLDER_RECONCILIATION_REPORT.md File-by-file diff of the agent/ export tree ✅ Complete
ROOT_FILES_RECONCILIATION_REPORT.md Diff of root AGENT.md/README.md ✅ Complete
INTRA_FOLDER_SKILL_AUDIT_SCOPE.md Scope for a fourth reconciliation pass — prd-agent duplicating itself across 17 skill clusters, found via /speckit-plan ✅ Complete
SKILL_DUPLICATION_AUDIT_REPORT.md File-by-file diff/read results for all 17 clusters — verdicts, what to keep, what content would be lost. Curated skill count: 46 → 28 (27 once frontend-skill is removed) ✅ Complete
IMPLEMENTATION_NOTES.md Historical decision log for the original Phase 1-2 catalogue merge 📋 Historical (Phase 1-2 only)
COMPLETION_SUMMARY.md Original Phase 1-2 completion record 📋 Historical (Phase 1-2 only — Phase 3 is separately tracked and not yet complete)

Related Issues

This project is coordinated with:

  • #1733 — Phase 2: Folder Structure & Linking
  • #1896 — Phase 5: Prompt Testing & Validation (merged from prd-agent-prompt-improvements-2026-08)
  • #1897 — Phase 6: Team Rollout & Documentation (merged from prd-agent-prompt-improvements-2026-08)
  • #1899 — Phase 7: Optional Spec-Based Agent Sync (merged from prd-agent-prompt-improvements-2026-08)

See Linking Standard for linking patterns.

Visual Workflow

flowchart TD
  accTitle: flowchart diagram
  accDescr: flowchart flowchart
  A[Start Here] --> B[Read Scope and Prerequisites]
  B --> C[Run the Documented Workflow]
  C --> D[Validate with Repo Tooling]
  D --> E[Open PR or Hand-off]

  classDef start fill:#E8F5E9,stroke:#2E7D32,stroke-width:2px,color:#1B5E20;
  classDef prep fill:#E3F2FD,stroke:#1565C0,stroke-width:2px,color:#0D47A1;
  classDef run fill:#fef3c7,stroke:#b45309,stroke-width:2px,color:#4a2c00;
  classDef gate fill:#f3e8ff,stroke:#7e22ce,stroke-width:2px,color:#3b0764;
  classDef done fill:#E0F2F1,stroke:#00695C,stroke-width:2px,color:#004D40;

  class A start;
  class B prep;
  class C run;
  class D gate;
  class E done;
Loading