| file_type | documentation | ||||
|---|---|---|---|---|---|
| title | PRD Combined Agent – Phase 2 Batch 2 + Phase 3 Consolidation | ||||
| description | Unified product requirements and planning agent: catalogue merge complete, structural folder consolidation drafted | ||||
| last_updated | 2026-09-10 | ||||
| status | active | ||||
| tags |
|
||||
| owners |
|
Unifies two complementary product planning agents into a single multi-provider planning tool.
2026-09-10 update: Phase 2 Batch 2 merged the two agents at the catalogue/registry level only. A folder-level audit found the underlying
agents/prd-agent/andagents/prd-factory-planner-agent/folders were never actually consolidated — see FOLDER_STRUCTURE_PLAN.md for the audit and target structure, and PLANNING.md — Phase 3 for status.2026-09-10 update: The sibling project
prd-agent-prompt-improvements-2026-08(core-prompt v2.1 content enhancement, testing, and team rollout) has been folded into this project — its README and PLANNING content now live here as Phases 4-7 in PLANNING.md. That project's folder is being retired; see PLANNING.md — Prompt Enhancement Track for the merged scope.2026-09-10 update: Phase 3 has now been fully audited, file-by-file, across all three of
prd-factory-planner-agent's top-level areas — see SKILL_RECONCILIATION_REPORT.md (skills/), AGENT_FOLDER_RECONCILIATION_REPORT.md (agent/), and ROOT_FILES_RECONCILIATION_REPORT.md (AGENT.md/README.md). The real merge scope turned out to be much smaller than assumed: almost everything inprd-factory-planner-agentis either an exact duplicate or fabricated/aspirational content, not unique logic. The folder can be deleted outright once a handful of specific items are ported forward — see PLANNING.md — Phase 3 for the finalized, scoped deliverable list.
| Aspect | Details |
|---|---|
| Agent | PRD Agent (Product Requirements) |
| Version | 2.0.0 |
| Status | Active |
| Providers | Claude, Copilot, OpenAI |
| Merged | prd-agent + prd-factory-planner-agent |
| Capabilities | 14 core across all planning phases |
| Date | 2026-07-23 |
- Executive summaries, requirements, metrics, constraints, risks
- Breakdown, impact/effort matrices, user stories, criteria
- Release planning, milestones, sprints, estimation, dependencies
- Requirements gathering, workflows, change management, templates
- ✅ Agent specification merged
- ✅ Multi-provider configurations verified
- ✅ Tool integrations confirmed
- ✅ Capabilities documented
- ✅ All resources documented
- ✅ Agent catalogued
Part of: Agent Standardisation Initiative – Phase 2 (Epic #1079)
Completed: 2026-07-23 | Maintainer: Ash Shaw
| Document | Purpose | Status |
|---|---|---|
| PLANNING.md | Master phase plan — Phase 1-2 (catalogue merge, done), Phase 3 (structural consolidation, scoped), Phases 4-7 (Prompt Enhancement Track) | 🟡 Active |
| OPENSPEC.md | Technical-spec stub — points to FOLDER_STRUCTURE_PLAN.md until a real OpenSpec change proposal is created | 🔵 Stub |
| FOLDER_STRUCTURE_PLAN.md | Phase 3 master plan — target agents/prd-agent/ structure, open decisions, execution phases |
🟡 Active |
| SKILL_RECONCILIATION_REPORT.md | File-by-file diff of every skills/ folder shared between the two agents |
✅ Complete |
| AGENT_FOLDER_RECONCILIATION_REPORT.md | File-by-file diff of the agent/ export tree |
✅ Complete |
| ROOT_FILES_RECONCILIATION_REPORT.md | Diff of root AGENT.md/README.md |
✅ Complete |
| INTRA_FOLDER_SKILL_AUDIT_SCOPE.md | Scope for a fourth reconciliation pass — prd-agent duplicating itself across 17 skill clusters, found via /speckit-plan |
✅ Complete |
| SKILL_DUPLICATION_AUDIT_REPORT.md | File-by-file diff/read results for all 17 clusters — verdicts, what to keep, what content would be lost. Curated skill count: 46 → 28 (27 once frontend-skill is removed) |
✅ Complete |
| IMPLEMENTATION_NOTES.md | Historical decision log for the original Phase 1-2 catalogue merge | 📋 Historical (Phase 1-2 only) |
| COMPLETION_SUMMARY.md | Original Phase 1-2 completion record | 📋 Historical (Phase 1-2 only — Phase 3 is separately tracked and not yet complete) |
This project is coordinated with:
- #1733 — Phase 2: Folder Structure & Linking
- #1896 — Phase 5: Prompt Testing & Validation (merged from
prd-agent-prompt-improvements-2026-08) - #1897 — Phase 6: Team Rollout & Documentation (merged from
prd-agent-prompt-improvements-2026-08) - #1899 — Phase 7: Optional Spec-Based Agent Sync (merged from
prd-agent-prompt-improvements-2026-08)
See Linking Standard for linking patterns.
flowchart TD
accTitle: flowchart diagram
accDescr: flowchart flowchart
A[Start Here] --> B[Read Scope and Prerequisites]
B --> C[Run the Documented Workflow]
C --> D[Validate with Repo Tooling]
D --> E[Open PR or Hand-off]
classDef start fill:#E8F5E9,stroke:#2E7D32,stroke-width:2px,color:#1B5E20;
classDef prep fill:#E3F2FD,stroke:#1565C0,stroke-width:2px,color:#0D47A1;
classDef run fill:#fef3c7,stroke:#b45309,stroke-width:2px,color:#4a2c00;
classDef gate fill:#f3e8ff,stroke:#7e22ce,stroke-width:2px,color:#3b0764;
classDef done fill:#E0F2F1,stroke:#00695C,stroke-width:2px,color:#004D40;
class A start;
class B prep;
class C run;
class D gate;
class E done;