You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Integrate Issue Agent with PR finalisation so linked issues reflect verified PR progress and post-merge outcomes without losing existing content.
Linked Stories/Tasks/PRs/Epic
Project epic: #2823; related changelog gate: #2827; end-to-end testing: #2830. Workflow prompt. No implementation PR is verified.
Milestones & Timeline
GitHub milestone: v1.1; Phase 3c. Reconfirm the original dates before scheduling.
Steps / Checklist
Verify an actual PR–issue relationship before changing an issue.
At STEP 7, add a PR reference without overwriting the description; use a current canonical review status and meta:has-pr only for an open linked PR.
At STEP 12, check acceptance criteria and remaining work after merge; close only when the issue’s outcome is complete.
Document approval, idempotency and error-handling safeguards.
Acceptance Criteria
Tests cover linking, review status, completed work and remaining work.
Existing issue content and unrelated labels survive every update.
No issue closes solely because a PR merged.
Workflow documentation matches available agent interfaces.
Additional Context
The older example overwrites descriptions and uses status:in-review, which is absent from current canonical labels. Verify the current agent interface before wiring calls.
Definition of Ready (DoR)
Confirm STEP 7/12 integration points, link criteria and approved write behaviour.
Prepare completion and partial-delivery cases.
Definition of Done (DoD)
Integration and tests reviewed; applicable PR merged.
Documentation and issue tracking updated from verified outcomes.
Activity
linear-code commentedon Sep 4, 2026
LS-3126
github-actions commentedon Sep 4, 2026
Missing required section(s): Definition of Ready (DoR), Definition of Done (DoD)
The issue will remain open and flagged until the body is corrected.
Please update the issue with one of the official templates:
If this was opened by automation, update the automation to preserve the template sections before creating the issue.
[-][PHASE 3] Integrate Issue Agent into PR lifecycle (STEP 7 & 12)[/-][+]aiops: pr-lifecycle - Integrate issue agent[/+]github-actions commentedon Sep 8, 2026
This issue has labels that are not in the canonical taxonomy:
migrate:status:needs-more-infomigrate:type:taskmigrate:area:automationpriority:highValid Canonical Labels
Please use labels with a prefix from the canonical taxonomy:
type:bug,type:feature,type:task,type:documentation, etc.status:needs-triage,status:in-progress,status:done, etc.priority:critical,priority:high,priority:normal,priority:lowarea:ci,area:docs,area:labels,area:security, etc.meta:needs-changelog,meta:duplicate,meta:blocked, etc.For the complete list, see .github/labels.yml.
[-]aiops: pr-lifecycle - Integrate issue agent[/-][+]automation: issue-agent - Integrate PR lifecycle[/+][-]automation: issue-agent - Integrate PR lifecycle[/-][+]task: issue-agent - Integrate PR lifecycle[/+][-]task: issue-agent - Integrate PR lifecycle[/-][+]automation: issue-agent - Integrate PR lifecycle updates[/+]