Skip to content

Latest commit

 

History

History
358 lines (246 loc) · 11.1 KB

README.md

File metadata and controls

358 lines (246 loc) · 11.1 KB
file_type documentation
title Release Engineering Training Materials
description Comprehensive training program for release workflow team
version v1.0
last_updated 2026-08-22
status active

Release Engineering Training Materials

Complete training program for Release Engineering team on the two-phase agentic release workflow.


Overview

This folder contains Phase 9B deliverables: Team Training & Runbooks for the Release Process Redesign Initiative.

Training covers:

  • ✅ Two-phase agentic workflow architecture
  • ✅ Patch release execution (5–10 min, auto-approved)
  • ✅ Minor release execution (10–30 min, 1 maintainer approval)
  • ✅ Major release execution (30–120 min, 2 maintainers + ADR)
  • ✅ Troubleshooting and emergency recovery
  • ✅ Hands-on practice and certification

Training Resources

Primary Training Guide

RELEASE_TEAM_TRAINING.md (70+ minutes)

Comprehensive training manual with 5 modules:

  1. Module 1: Release Fundamentals (10 min)

    • Semantic versioning and release types
    • Two-phase workflow architecture
    • Seven safety gates explained
    • Authorization and team roles
  2. Module 2: Patch Release Training (20 min)

    • When to use patch releases
    • Step-by-step execution guide
    • Dry-run → live release process
    • Post-release verification
  3. Module 3: Minor Release Training (25 min)

    • When to use minor releases
    • Feature vs. bug fix distinction
    • Pre-release approver communication
    • Approval workflow and timeline
  4. Module 4: Major Release Training (30 min)

    • When to use major releases
    • Architecture Decision Record (ADR) requirement
    • Dual approval workflow
    • Breaking change documentation
  5. Module 5: Troubleshooting & Recovery (15 min)

    • Common issues and quick fixes
    • Emergency rollback procedure
    • Escalation procedures

Quick Reference Materials

RELEASE_QUICK_REFERENCE.md (1-page cheat sheet)

Print and laminate this quick reference card:

  • Decision tree for release type selection
  • Pre-release checklist
  • Step-by-step commands for each release type
  • Common issues and fixes
  • Key commands reference
  • Timeline and approval requirements

Ideal for: Keeping at your desk during releases


FAQ & Q&A

RELEASE_FAQ.md (30 questions answered)

Frequently asked questions organized by topic:

  • General Questions (Q1–Q4): Release types, version selection, timing
  • Technical Questions (Q5–Q10): Gates, dry-runs, branch strategy
  • Approval & Authorization (Q11–Q13): Team access, approval methods
  • Breaking Changes & ADR (Q14–Q16): When ADR required, ADR status
  • Post-Release (Q17–Q23): Sync branches, conflicts, rollback
  • Workflow & Automation (Q24–Q26): Parallel releases, concurrent pushes
  • Learning & Training (Q27–Q30): Getting started, practice, help resources

Ideal for: Quick answers during training and execution


Certification & Sign-Off

CERTIFICATION_TEMPLATE.md (certification record)

Complete certification checklist including:

  • Training completion tracking — All 5 modules with sign-off dates
  • Hands-on practice verification — 3 practice releases (patch, minor, optional major)
  • Competency verification — Specific skills demonstrated
  • Knowledge verification — 5-question quiz (≥80% pass)
  • Authorization levels — Patch/minor/major authorization with restrictions
  • Dual sign-off — Trainee + Release Lead signatures
  • Validity tracking — 12-month certification with renewal date

Ideal for: Recording formal completion and authorization


Supporting Documentation

These materials reference but do not replace:

Main Release Runbooks

Located in /docs/:

Reference Documents


Training Program Flow

For New Team Members

Recommended sequence (3–4 hours):

  1. Read → RELEASE_TEAM_TRAINING.md Modules 1–2 (30 min)
  2. Watch → Video walkthrough (optional, 15 min)
  3. Practice → Execute test patch release (30 min)
  4. Read → RELEASE_TEAM_TRAINING.md Modules 3–5 (45 min)
  5. Practice → Execute test minor release (30 min)
  6. Practice → Execute test major release (30 min, optional)
  7. Sign → Complete CERTIFICATION_TEMPLATE.md (15 min)
  8. Review → Watch video again if needed (optional)

Hands-on Practice:

  • Use test repository: https://github.com/lightspeedwp/test-releases.git
  • Execute releases in safe environment
  • Get comfortable with commands before production releases

For Existing Team Members

Annual refresher (1 hour):

  1. Skim → RELEASE_QUICK_REFERENCE.md
  2. Check → RELEASE_FAQ.md for new questions
  3. Watch → Video walkthrough (if updated)
  4. Execute → One real release
  5. Update → Certification with current date

Pre-Training Requirements

Before starting training, verify:

# 1. You have GitHub access
gh auth status

# 2. You are in maintainers team
gh api /orgs/lightspeedwp/teams/maintainers/members/$(git config user.name)

# 3. You have git and gh installed
git --version
gh --version

# 4. You can access the test repo
gh repo view lightspeedwp/test-releases

No other prerequisites.


Training Outcomes

After completing this training, you will:

✅ Understand the two-phase agentic release workflow
✅ Execute patch releases independently (5–10 min)
✅ Coordinate minor releases with approval (10–30 min)
✅ Understand major release requirements (30–120 min)
✅ Identify and fix common release issues
✅ Perform emergency rollback if needed
✅ Know when to escalate to Release Lead
✅ Be formally certified for production releases


Certification Process

Eligibility

  • Team member is in @lightspeedwp/maintainers GitHub team
  • Team member has completed all 5 training modules
  • Team member has executed practice releases successfully
  • Team member has answered knowledge quiz (≥80% pass)

Certification Steps

  1. Complete hands-on practice — 3 successful test releases (patch, minor, optional major)
  2. Fill certification form — CERTIFICATION_TEMPLATE.md
  3. Get Release Lead sign-off — Trainer/Release Lead reviews and signs
  4. File certification — Keep on record for 12 months
  5. Renew annually — Refresher training + real release execution

Authorization Levels

Level Scope Prerequisites Timeline
Patch Bug fixes, security patches Complete Module 1–2 + practice patch Immediately after certification
Minor New features Complete Module 1–3 + practice minor Immediately after certification
Major Breaking changes Complete Module 1–4 + practice major Immediately after certification

Support & Resources

During Training

  • Video walkthrough: (optional, ~50 min overview)
  • Hands-on practice: Use test repository
  • Questions: Ask in Release Engineering channel
  • Stuck? Check RELEASE_FAQ.md

During Release Execution

Escalation

Issue Action
Can't remember a step Check the runbook or quick reference
Don't understand a concept Re-read the training module
Workflow failed Check troubleshooting guide
Still stuck after 15 min Escalate to Release Lead
Authorization denied Contact Release Lead for team access

Maintenance & Updates

This training program is maintained by Release Engineering Team.

Update Frequency

  • Annually: Full training review (Q4)
  • As-needed: When workflow changes occur
  • Quarterly: Video refresh if significant changes

Feedback

Have suggestions for improving training?

  1. Create GitHub issue in .github repo
  2. Tag: type:documentation + area:release
  3. Include: "Training feedback" in title
  4. Release Lead will review and incorporate

File Manifest

File Type Purpose Duration
RELEASE_TEAM_TRAINING.md Training Guide Comprehensive 5-module training 70+ min
RELEASE_QUICK_REFERENCE.md Reference Card One-page cheat sheet (print) 1 page
RELEASE_FAQ.md Q&A 30 frequently asked questions Reference
CERTIFICATION_TEMPLATE.md Form Certification checklist + sign-off 30 min
README.md Overview This file (training program map) 10 min

Related Project

This training is part of Phase 9: Release Workflow Validation & E2E Testing

Project details: .github/projects/active/release-workflow-validation-phase9-2026-08-22/

Related phases:

  • Phase 9A: E2E Test Implementation (✅ COMPLETE)
  • Phase 9B: Team Training Materials (🟢 ACTIVE — this folder)
  • Phase 9C: Pilot Release Execution (📋 Planned)

Quick Start

For new team member:

# Step 1: Read training
open RELEASE_TEAM_TRAINING.md

# Step 2: Do practice
cd test-releases  # (or use test repo locally)
gh workflow run release.yml -f scope=patch -f dry_run=true

# Step 3: Get certified
# Complete CERTIFICATION_TEMPLATE.md

# Step 4: Execute real release
# Use RELEASE_QUICK_REFERENCE.md as guide

For experienced team member:

# Step 1: Quick refresh
open RELEASE_QUICK_REFERENCE.md

# Step 2: Execute release
gh workflow run release.yml -f scope=patch -f dry_run=true
# (or minor/major as appropriate)

# Step 3: Verify
gh release view v1.0.1

Training Program v1.0
Last Updated: 2026-08-22
Maintained By: Release Engineering Team
Next Review: 2027-08-22


Questions? Check RELEASE_FAQ.md or ask @lightspeedwp/maintainers