Skip to content

Latest commit

 

History

History
248 lines (155 loc) · 5.74 KB

PLANNING.md

File metadata and controls

248 lines (155 loc) · 5.74 KB
Error in user YAML: (<unknown>): did not find expected key while parsing a block mapping at line 1 column 1
---
file_type: planning
title: ""openspec — Planning & Specification""
description: ""Project planning document with objectives, phases, deliverables, and GitHub issue references""
created_date: 2026-08-12
last_updated: "2026-08-25"
status: active
tags:- planning
  - specification
  - project
---

openspec — Planning & Specification

Status: 🟡 Active | Owner: Owner Name | Last Updated: 2026-08-12


Quick Summary

Objective: One sentence describing the primary goal

Duration: Estimated X weeks
Target Completion: 2026-08-12
Key Stakeholders: [List names]


Executive Summary

Provide 2-3 sentences describing what this project does, why it matters, and what will be delivered.

Problem Statement

Describe the problem being solved, the pain point, or the opportunity being addressed.

Solution Overview

Briefly describe the proposed solution at a high level.

Expected Outcomes

List 3-5 key outcomes or success metrics.


Scope & Objectives

Primary Objectives

  1. Objective 1 — Description of what will be accomplished
  2. Objective 2 — Description of what will be accomplished
  3. Objective 3 — Description of what will be accomplished

Success Criteria

Define measurable success criteria:

  • Deliverable 1 complete and validated
  • Deliverable 2 complete and validated
  • Deliverable 3 complete and validated
  • Team sign-off obtained
  • Documentation complete

Out of Scope

Explicitly list what is NOT being done in this project:

  • Feature X (defer to Phase 2)
  • Integration with System Y (requires separate epic)
  • Legacy system migration (excluded)

Implementation Strategy

Overall Approach

Describe the high-level approach: sequential phases, parallel workstreams, agile iterations, etc.

Key Principles

  1. Principle 1 — Why this matters and how it guides decisions
  2. Principle 2 — Why this matters and how it guides decisions
  3. Principle 3 — Why this matters and how it guides decisions

Project Phases

Phase 1: [Phase Name] (Weeks X-Y)

Objective: What will be accomplished in this phase

Deliverables:

  • Deliverable 1.1 — Description
  • Deliverable 1.2 — Description
  • Deliverable 1.3 — Description

Success Criteria:

  • Deliverable complete and reviewed
  • All tests passing (if applicable)
  • Documentation complete

Related GitHub Issues:

Issue Type Purpose Status
#XXXX epic Phase 1 tracking 🟢 Open
#XXXX task Task 1.1 🟢 Open

Phase 2: [Phase Name] (Weeks X-Y)

[Follow same structure as Phase 1]


Phase N: [Phase Name]

[Continue pattern for all phases]


Timeline & Milestones

Overall Schedule

Milestone Date Dependency Status
Phase 1 Complete 2026-08-12 - ⏳ In Progress
Phase 2 Start 2026-08-12 Phase 1 ⏳ Planned
Final Delivery 2026-08-12 Phase 2 ⏳ Planned

Deliverables

Detailed description of what will be delivered in each phase.


Resources & Team

Team Members

Role Name Hours/Week Responsibilities
Project Owner Owner Name 15 Overall direction, stakeholder coordination
Technical Lead Tech Lead Name 20 Architecture, technical decisions
Developer Dev Name 40 Implementation, testing

OpenSpec Integration

When to Use OpenSpec

This project includes OPENSPEC.md if:

  • ✅ Detailed technical specification required
  • ✅ Complex architecture or multiple components
  • ✅ Phases require independent execution
  • ✅ Configuration or schema validation needed
  • ✅ Long-term portability/reusability important

Navigating Between Documents

If this project has OPENSPEC.md:

  1. Start here (PLANNING.md) for project overview
  2. Check OPENSPEC.md for detailed technical specs
  3. Reference GitHub issues for status tracking
  4. Execute Phase-specific tasks from phase documents

If this project has no OPENSPEC.md:

  • All specifications contained in this document
  • See section "Phase-Specific Details" below

GitHub Issues & Tracking

Master Epic

#XXXX — openspec — Master Epic

All project work is tracked under the master epic. Child issues are created per phase.

Issue Reference Table

Phase Issue Type Status Notes
Phase 1 #XXXX epic 🟢 Open Phase 1 tracking
— #XXXX task 🟢 Open Task 1.1
Phase 2 #XXXX epic ⏳ Planned Phase 2 tracking

Risk Management

Identified Risks

Risk Probability Impact Mitigation
Scope creep Medium High Weekly scope reviews
Resource unavailability Low High Cross-training

Success Metrics

Quantitative Metrics

  • Metric 1: Target value
  • Metric 2: Target value
  • Metric 3: Target value

Qualitative Metrics

  • Stakeholder satisfaction: Positive feedback
  • Team morale: Smooth collaboration
  • Process quality: Zero critical issues

Related Documentation

Project Documents

  • README.md — Project overview and quick start
  • OPENSPEC.md — Technical specification (if applicable)

External References


Project Status: 🟡 Active
Version: 1.0.0
Maintained By: Owner Name
Last Updated: 2026-08-12