---
file_type: planning
title: ""openspec — Planning & Specification""
description: ""Project planning document with objectives, phases, deliverables, and GitHub issue references""
created_date: 2026-08-12
last_updated: "2026-08-25"
status: active
tags:- planning
- specification
- project
---
Status: 🟡 Active | Owner: Owner Name | Last Updated: 2026-08-12
Objective: One sentence describing the primary goal
Duration: Estimated X weeks
Target Completion: 2026-08-12
Key Stakeholders: [List names]
Provide 2-3 sentences describing what this project does, why it matters, and what will be delivered.
Describe the problem being solved, the pain point, or the opportunity being addressed.
Briefly describe the proposed solution at a high level.
List 3-5 key outcomes or success metrics.
- Objective 1 — Description of what will be accomplished
- Objective 2 — Description of what will be accomplished
- Objective 3 — Description of what will be accomplished
Define measurable success criteria:
- Deliverable 1 complete and validated
- Deliverable 2 complete and validated
- Deliverable 3 complete and validated
- Team sign-off obtained
- Documentation complete
Explicitly list what is NOT being done in this project:
- Feature X (defer to Phase 2)
- Integration with System Y (requires separate epic)
- Legacy system migration (excluded)
Describe the high-level approach: sequential phases, parallel workstreams, agile iterations, etc.
- Principle 1 — Why this matters and how it guides decisions
- Principle 2 — Why this matters and how it guides decisions
- Principle 3 — Why this matters and how it guides decisions
Objective: What will be accomplished in this phase
Deliverables:
- Deliverable 1.1 — Description
- Deliverable 1.2 — Description
- Deliverable 1.3 — Description
Success Criteria:
- Deliverable complete and reviewed
- All tests passing (if applicable)
- Documentation complete
Related GitHub Issues:
| Issue | Type | Purpose | Status |
|---|---|---|---|
| #XXXX | epic | Phase 1 tracking | 🟢 Open |
| #XXXX | task | Task 1.1 | 🟢 Open |
[Follow same structure as Phase 1]
[Continue pattern for all phases]
| Milestone | Date | Dependency | Status |
|---|---|---|---|
| Phase 1 Complete | 2026-08-12 | - | ⏳ In Progress |
| Phase 2 Start | 2026-08-12 | Phase 1 | ⏳ Planned |
| Final Delivery | 2026-08-12 | Phase 2 | ⏳ Planned |
Detailed description of what will be delivered in each phase.
| Role | Name | Hours/Week | Responsibilities |
|---|---|---|---|
| Project Owner | Owner Name | 15 | Overall direction, stakeholder coordination |
| Technical Lead | Tech Lead Name | 20 | Architecture, technical decisions |
| Developer | Dev Name | 40 | Implementation, testing |
This project includes OPENSPEC.md if:
- ✅ Detailed technical specification required
- ✅ Complex architecture or multiple components
- ✅ Phases require independent execution
- ✅ Configuration or schema validation needed
- ✅ Long-term portability/reusability important
If this project has OPENSPEC.md:
- Start here (
PLANNING.md) for project overview - Check OPENSPEC.md for detailed technical specs
- Reference GitHub issues for status tracking
- Execute Phase-specific tasks from phase documents
If this project has no OPENSPEC.md:
- All specifications contained in this document
- See section "Phase-Specific Details" below
#XXXX — openspec — Master Epic
All project work is tracked under the master epic. Child issues are created per phase.
| Phase | Issue | Type | Status | Notes |
|---|---|---|---|---|
| Phase 1 | #XXXX | epic | 🟢 Open | Phase 1 tracking |
| — | #XXXX | task | 🟢 Open | Task 1.1 |
| Phase 2 | #XXXX | epic | ⏳ Planned | Phase 2 tracking |
| Risk | Probability | Impact | Mitigation |
|---|---|---|---|
| Scope creep | Medium | High | Weekly scope reviews |
| Resource unavailability | Low | High | Cross-training |
- Metric 1: Target value
- Metric 2: Target value
- Metric 3: Target value
- Stakeholder satisfaction: Positive feedback
- Team morale: Smooth collaboration
- Process quality: Zero critical issues
- README.md — Project overview and quick start
- OPENSPEC.md — Technical specification (if applicable)
- Repository CLAUDE.md — Repository governance
- Master Epic — Issue tracking
Project Status: 🟡 Active
Version: 1.0.0
Maintained By: Owner Name
Last Updated: 2026-08-12