@@ -12,6 +12,10 @@ read_time: false
1212
A map of Medium Voltage (MV) substation clusters. It was created by grouping similarly located MV substations using data from the ESB Substation Capacity
1313
map [here](https://www.esbnetworks.ie/new-connections/generator-connections-group/availability-capacity-map) or [here](https://www.esbnetworks.ie/network-capacity-map)
1414

15-
> **Caveat:** the ESB substation capacities **do not include** contracted or bid capacity and so underestimate availability. If included, all zones other than Dun Laoghaire Rathdown would likely be close to zero.
15+
> **Caveat:** the ESB substation capacities **do not include** contracted or bid capacity and so overestimate availability. If included, all zones other than Dun Laoghaire Rathdown would likely be close to zero.
16+
17+
**Notes**:
18+
- `SLR` stands for [Special Load Reading](https://www.esbnetworks.ie/publications) which are a coincident set of measurements of simultaneous load for all distribution substations taken each year on a single day by the ESB in both summer and winter.
19+
- In most zones `Demand Available + SLR Load` is not equal to `Installed Capacity`, on average this sum is around 60% of installed capacity for each substation.
1620

1721
{% include 2021-04-07-electricity-capacity-map.html %}