Repository navigation
Update CLI integration test project structure - #33175
filipesilva wants to merge 6 commits into
Conversation
There was a problem hiding this comment.
Is this change intended?
There was a problem hiding this comment.
Nope, just an oversight, will fix.
IgorMinar
left a comment
There was a problem hiding this comment.
the rest looks good, thanks!
There was a problem hiding this comment.
is this intentionally disabled?
There was a problem hiding this comment.
It was, yes. While working in these integration PRs I disable the rest of CI to make it faster and less expensive.
There was a problem hiding this comment.
we don't need to track es5 here. we care primarily about es2015 sizes.
There was a problem hiding this comment.
in the ts 3.6 update PR we fixed the schematic to make it compatible with recent cli version, so you no longer should need to downgrade. undo plz
There was a problem hiding this comment.
That was part of the old rebase and is now gone.
There was a problem hiding this comment.
| describe('workspace-project App', () => { | |
| describe('cli-hello-world-ivy-compat App', () => { |
There was a problem hiding this comment.
Fixed this one and three others that were also the same.
There was a problem hiding this comment.
please remove the es5 sizes, we don't want to break the build when they change.
|
This issue has been automatically locked due to inactivity. Read more about our automatic conversation locking policy. This action has been performed automatically by a bot. |
Blocked on #32957, needs to go in after so that the size increases due to different default template are validated separately.
PR Checklist
Please check if your PR fulfills the following requirements:
PR Type
What kind of change does this PR introduce?
What is the current behavior?
Issue Number: N/A
What is the new behavior?
Does this PR introduce a breaking change?
Other information