Updating all dependencies immediately after release carries risks as the package may have been compromised. The package may also still have "teething problems", especially for new features. Aside from known security releases, waiting a few days/weeks is often the less risky option, in hopes that someone else find a potential problems before we update the package. This is called a "cooldown" period. Or as Zizmor describes it: > Performing updates without an appropriate cooldown presents both stability and supply-chain security risks: > * **Stability**: updating to the newest version of a dependency immediately after its release increases the risk of breakage, since new releases may contain regressions or other issues that other users have not yet discovered. > * **Supply-chain security**: package compromises are frequently _opportunistic_, meaning that the attacker expects to have their compromised version taken down by the packaging ecosystem relatively quickly. Updating immediately to a newly released version increases the risk of automatically pulling in a compromised version before it can be taken down. Of course, for frequently released packages, this `cooldown` period shouldn't be too long, as otherwise the package will never update, as the "latest" release will always be too young. Since July 2025, the Dependabot config offers the possibility to add a `cooldown` period to delay the creation of dependency update PRs based on the number days since the release came out. Depending on the ecosystem, this `cooldown` period can be configured with more or less flexibility (only `default-days` or semver based differentiation). _Unfortunately, the `github-actions` ecosystem only allows the `default-days` option._ Since then (July 2026), GitHub, in their wisdom, has introduced a standard "cooldown" period for all packages of three days. This is counter-productive as that means that the chances of a compromise being found within the first three days have decreased significantly. The Zizmor tool recommends a `cooldown` of seven days, which, with increased adoption of zizmor, again decreases the likelihood of a compromise being found before it reaches this package. With all this in mind, I propose setting a `cooldown` period of 10 days. Refs: * https://github.blog/changelog/2025-07-01-dependabot-supports-configuration-of-a-minimum-package-age/ * https://github.blog/changelog/2026-07-14-dependabot-version-updates-introduce-default-package-cooldown/ * https://docs.github.com/en/code-security/reference/supply-chain-security/dependabot-options-reference#cooldown- * https://docs.github.com/en/code-security/tutorials/secure-your-dependencies/optimizing-pr-creation-version-updates * https://docs.zizmor.sh/audits/#dependabot-cooldown
rodrigoprimo
left a comment
There was a problem hiding this comment.
Thanks for the PR, Juliette.
I have a question about the cooldown period. As far as I can tell, Dependabot runs only twice a month in this repo (on the 5th and the 20th), and the cooldown is checked during those runs. Does this mean an update could take up to about 25 days to be proposed, not 10? For example, a release published on the 11th would be only 9 days old on the 20th, so it wouldn't be picked up until the 5th of the following month.
I don't think this is necessarily a problem. I just wanted to check whether this was considered when choosing the 10-day period.
Correct.
It was not, as that's a different decision/consideration. The Having said that, yes, it could mean that a release is picked up later than we'd like, but if there is something truly important/something we are waiting for in an action runner release, we can always manually trigger a Dependabot run in the interim and get a PR, as long as the release is 10 days old. We could even update the workflows manually if needs be. In the future, we could add an |
rodrigoprimo
left a comment
There was a problem hiding this comment.
Sounds good to me. Thanks for the additional details.
Description
Updating all dependencies immediately after release carries risks as the package may have been compromised. The package may also still have "teething problems", especially for new features. Aside from known security releases, waiting a few days/weeks is often the less risky option, in hopes that someone else find a potential problems before we update the package. This is called a "cooldown" period.
Or as Zizmor describes it:
Of course, for frequently released packages, this
cooldownperiod shouldn't be too long, as otherwise the package will never update, as the "latest" release will always be too young.Since July 2025, the Dependabot config offers the possibility to add a
cooldownperiod to delay the creation of dependency update PRs based on the number days since the release came out. Depending on the ecosystem, thiscooldownperiod can be configured with more or less flexibility (onlydefault-daysor semver based differentiation). Unfortunately, thegithub-actionsecosystem only allows thedefault-daysoption.Since then (July 2026), GitHub, in their wisdom, has introduced a standard "cooldown" period for all packages of three days. This is counter-productive as that means that the chances of a compromise being found within the first three days have decreased significantly.
The Zizmor tool recommends a
cooldownof seven days, which, with increased adoption of zizmor, again decreases the likelihood of a compromise being found before it reaches this package.With all this in mind, I propose setting a
cooldownperiod of 10 days.Refs:
Suggested changelog entry
N/A