Skip to content

Add an explicit manual stage for changelog update - #19551

Merged
Dongbo Wang (daxian-dbw) merged 1 commit into
PowerShell:masterfrom
daxian-dbw:changelog
Apr 21, 2023
Merged

Dongbo Wang (daxian-dbw) merged 1 commit into
PowerShell:masterfrom
daxian-dbw:changelog

Conversation

@daxian-dbw

@daxian-dbw Dongbo Wang (daxian-dbw) commented Apr 20, 2023 •

Copy link
Copy Markdown
Member

PR Summary

Fix #19545

Add an explicit manual stage for changelog update.
The step "create GitHub Draft release" requires the corresponding changelog file gets updated for the release. So, add an explicit manual step before the "Create GitHub draft release" stage in the release pipeline to make the dependency clear.

I have run a release pipeline to validate this change:

image

@ghost

Copy link
Copy Markdown

🎉v7.2.12 has been released which incorporates this pull request.:tada:

Handy links:

@ghost

Copy link
Copy Markdown

🎉v7.3.5 has been released which incorporates this pull request.:tada:

Handy links:

@ghost

Copy link
Copy Markdown

🎉v7.4.0-preview.4 has been released which incorporates this pull request.:tada:

Handy links:

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

Backport-7.2.x-Done Backport-7.3.x-Done CL-BuildPackaging Indicates that a PR should be marked as a build or packaging change in the Change Log

Projects

None yet

Development

Successfully merging this pull request may close these issues.

The "Create GitHub draft release" stage depends on changelog update to be merged

4 participants