Skip to content

Fix computation of SHA512 checksum - #15736

Merged
Aditya Patwardhan (adityapatwardhan) merged 3 commits into
PowerShell:masterfrom
adityapatwardhan:FixBuildNuget
Jul 7, 2021
Merged

Aditya Patwardhan (adityapatwardhan) merged 3 commits into
PowerShell:masterfrom
adityapatwardhan:FixBuildNuget

Conversation

@adityapatwardhan

Copy link
Copy Markdown
Member

PR Summary

  • Add more logging when generating csproj for reference assembly generation
  • Make sure the SHA512SUMS file is written at the end of hash computation as it is written at the same location which is looped through.

PR Context

Fix daily build break.

PR Checklist

Co-authored-by: Robert Holt <rjmholt@gmail.com>
@adityapatwardhan Aditya Patwardhan (adityapatwardhan) added the CL-BuildPackaging Indicates that a PR should be marked as a build or packaging change in the Change Log label Jul 7, 2021
@ghost ghost removed this from the 7.2.0-preview.8 milestone Jul 7, 2021
@ghost

Copy link
Copy Markdown

Open PRs should not be assigned to milestone, so they are not assigned to the wrong milestone after they are merged. For backport consideration, use a backport label.

@ghost ghost removed this from the 7.2.0-preview.8 milestone Jul 7, 2021
@ghost

Copy link
Copy Markdown

Open PRs should not be assigned to milestone, so they are not assigned to the wrong milestone after they are merged. For backport consideration, use a backport label.

@ghost

Copy link
Copy Markdown

🎉v7.2.0-preview.8 has been released which incorporates this pull request.:tada:

Handy links:

Thatgfsj (Thatgfsj) pushed a commit to Thatgfsj-contribs/PowerShell that referenced this pull request Aug 6, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

CL-BuildPackaging Indicates that a PR should be marked as a build or packaging change in the Change Log

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants