Skip to content

Conversation

@rjmholt
Copy link
Collaborator

@rjmholt rjmholt commented Sep 30, 2020

PR Summary

The Linux package release script I wrote requires an extra flag to release to production repos, but I left that out in my original PR. I add that here.

PR Context

PR Checklist

@TravisEz13 TravisEz13 changed the title Add flag to make linux script publish to production repo Add flag to make Linux script publish to production repo Oct 6, 2020
@TravisEz13 TravisEz13 merged commit ab885ae into PowerShell:master Oct 6, 2020
@TravisEz13 TravisEz13 assigned TravisEz13 and unassigned daxian-dbw Oct 6, 2020
@TravisEz13 TravisEz13 added CL-BuildPackaging Indicates that a PR should be marked as a build or packaging change in the Change Log BackPort-6.2.x-Consider labels Oct 6, 2020
@ghost
Copy link

ghost commented Oct 21, 2020

🎉v7.1.0-rc.2 has been released which incorporates this pull request.:tada:

Handy links:

@adityapatwardhan adityapatwardhan added BackPort-7.1.x-Done Backport to 7.1.x completed and removed BackPort-7.1.x-Approved labels Oct 27, 2020
@ghost
Copy link

ghost commented Nov 17, 2020

🎉v7.2.0-preview.1 has been released which incorporates this pull request.:tada:

Handy links:

@ghost
Copy link

ghost commented Mar 11, 2021

🎉v7.0.6 has been released which incorporates this pull request.:tada:

Handy links:

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

Backport-7.0.x-Done BackPort-7.1.x-Done Backport to 7.1.x completed CL-BuildPackaging Indicates that a PR should be marked as a build or packaging change in the Change Log

Projects

None yet

Development

Successfully merging this pull request may close these issues.

5 participants