Skip to content

board: pin the wave-status checklist (the LGJ wave is done; ghidra-g1-g2 is superseded) - #37

Merged
AdaWorldAPI merged 1 commit into
mainfrom
claude/c64-6502-falsifier-shztkk
Aug 27, 2026
Merged

AdaWorldAPI merged 1 commit into
mainfrom
claude/c64-6502-falsifier-shztkk

Conversation

@AdaWorldAPI

Copy link
Copy Markdown
Owner

What this fixes

A recurring cross-session conflation, operator-corrected 2026-08-27. Sessions kept restating that "one lance-graph-java wave is ~90% done" and attributing the remainder to wave-ghidra-g1-g2. Wrong on both halves. This adds .claude/board/WAVE_STATUS_CHECKLIST.md as the durable answer so it stops recurring.

The correction

  • The LGJ substrate + facade arc is COMPLETE — D-LGJ-A…AUDIT (12 rows), W1–W7, and the mask-native sweep SWEEP-5…8 (ABI minors 5–8). Code census agrees: 8 Rust files / 7 444 lines / 134 #[test]; 33 Java files / 4 317 lines / 14 suites; three consumer modules each with their own suite.
  • wave-ghidra-g1-g2 is SUPERSEDED (2026-08-18), not pending. Its own file says "do not dispatch under any circumstance." The capability shipped upstream as AdaWorldAPI/ruff PR lgj-abi: map lance-graph's two new selection ExecError variants #94 (crates/ruff_r2il). It is not the last 10 %, and it gates nothing.
  • The genuine ~90 % item is D-LGJ-W8 (mask-native navigation correction): AUDIT → SPEC → COUNCIL → FREEZE → SUBSTRATE → FACADE → GRAPH MIGRATION all ✅; FALSIFIERS and POLICY remain. 7 of 9 rungs. It is entirely in-repo — nothing upstream blocks finishing it.
  • The real Ghidra/R2IL critical path is upstream: ruff_r2il PR2 → PR3, which is also gate Vector API bench: real JMH, cross-checked; the crossing does not always win #3 of the blocked wave-ogar-machine-pm1 (that gate was repointed 2026-08-18 from the old "Ghidra G1+G2 merged" wording, which had become unsatisfiable).

Two G1/G2 name collisions that fed the confusion are named and resolved in the doc: the D-LGJ-W5 graph consumer workers G1/G2 (both DONE, PR #18) and the D-LGJ-W8 spec gates G1/G2/G6/G9/G11. Neither is wave-ghidra-g1-g2.

The measured negative

Recorded because "consume r2conc / R2IL from lance-graph-java" reads as in-flight and is not:

  • native/lgj-abi/Cargo.toml [dependencies] is exactly two local path deps — ndarray, lance-graph-contract. No r2sleigh, no ogar-r2il, no r2conc.
  • Every apparent Ghidra hit across Rust, Java and docs/ is the substring opcode, naming this crate's own LgjOpCode ABI vocabulary.
  • The only real P-code content is valhalla-lab/reproducers/R12_GhidraPcodeVocabularyVsCliff.java — a standalone flattening reproducer, wired into nothing.

The seam is verified (Language.parse → InstructionPrototype → getPcode(), no core fork required) and the vocabulary measured (R12: payloads 0/2, ordinals 3/3) — but no binding exists.

Method

Verified against three independent reads that were not allowed to see each other's sources: the seven .claude/waves/*.md files, the four board files, and a git + source census that trusts no doc. All three agree. Statuses in the checklist are copied from STATUS_BOARD.md / LATEST_STATE.md, not re-derived.

Scope

Documentation only — one new append-only board file, 142 lines. No code, no ABI, no layout, no test touched.

Board hygiene: per .claude/board/README.md this is a hygiene-only PR and is discharged by the entry it adds; it generates no further arc obligation.


Generated by Claude Code

…-g2 is superseded)

Recurring cross-session conflation, operator-corrected: sessions kept
saying 'one wave is ~90% done' and attributing the remainder to
wave-ghidra-g1-g2. Wrong on both halves.

- The LGJ substrate+facade arc is COMPLETE: D-LGJ-A..AUDIT, W1-W7, and
  the mask-native sweep ABI minors 5-8.
- wave-ghidra-g1-g2 is SUPERSEDED (2026-08-18), not pending: the
  capability shipped upstream as ruff PR #94 (crates/ruff_r2il).
- The genuine ~90% item is D-LGJ-W8, the mask-native navigation
  correction: 7 of 9 gate rungs done, FALSIFIERS and POLICY remain.
- The real Ghidra/R2IL critical path is upstream (ruff_r2il PR2 -> PR3),
  which is also gate #3 of the blocked wave-ogar-machine-pm1.

Also records the measured negative: this repo has NO r2il/r2conc/
r2sleigh binding. lgj-abi's [dependencies] is exactly ndarray plus
lance-graph-contract; every apparent Ghidra hit in Rust/Java/docs is the
substring 'opcode' naming this crate's own LgjOpCode vocabulary. The
only real P-code content is the standalone R12 valhalla-lab reproducer,
wired into nothing.

Verified against three independent reads (wave files, board files, and a
git+source census that trusts no doc); all three agree.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01DCfrD5y19cvFc4AoyydXYv
@coderabbitai

coderabbitai Bot commented Aug 27, 2026 •

Copy link
Copy Markdown

Important

  • 🔍 Trigger review

This repository does not receive automatic reviews because it has fewer than 10 stars.

⚙️ Run configuration

Configuration used: Organization UI

Review profile: CHILL

Plan: Pro Plus

Run ID: a60425f8-c968-402a-b57f-fd02fe816676


Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out.

❤️ Share

Comment @coderabbitai help to get the list of available commands.

@cursor

cursor Bot commented Aug 27, 2026

Copy link
Copy Markdown

Bugbot couldn't run - usage limit reached

Bugbot is counted against Cursor usage for this user or team, and this run hit a usage or spend limit.

A user or team admin can review and increase usage limits in the Cursor dashboard.

(requestId: serverGenReqId_01db6750-84f3-46ba-9563-3e0d9f5ddb57)

@AdaWorldAPI
AdaWorldAPI marked this pull request as ready for review August 27, 2026 05:24
@AdaWorldAPI
AdaWorldAPI merged commit 8da1dae into main Aug 27, 2026
2 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants