Jump to content

Orion (spacecraft)

From Wikipedia, the free encyclopedia

Orion
Photo of Orion taken during the flight of Artemis II
Manufacturer
OperatorNASA[1]
ApplicationsCrewed exploration beyond LEO[2]
Project costUS$21.5 billion ($26.3 billion inflation adjusted to 2022)
Specifications
Spacecraft typeCrewed
Launch mass
  • CM: 22,900 lb (10,400 kg)
  • CM and ESM: 58,467 lb (26,520 kg)
  • CM, ESM and LAS: 73,735 lb (33,446 kg)
Dry mass
  • CM: 20,500 lb (9,300 kg)
  • CM and ESM: 34,135 lb (15,483 kg)
Payload capacityCrew + 220 lb (100 kg)
Crew capacity4[1]
Volume
  • Pressurized: 690.6 ft3 (19.56 m3)[4]
  • Habitable: 316 ft3 (8.9 m3)
Power11 kW solar array on ESM
Design life21.1 days[3]
Dimensions
Length3.3 m (11 ft)
Diameter5.03 m (16.5 ft)
Production
StatusIn service
On order3
Built5
Launched3
Retired1
Maiden launchDecember 5, 2014 (EFT-1)
Last launchApril 1, 2026 (Artemis II, most recent)
Related spacecraft
Derived fromCrew Exploration Vehicle

The Orion Multi-Purpose Crew Vehicle (MPCV) is a partially reusable crewed spacecraft used by NASA for the Artemis lunar exploration program. It consists of a crew module (CM), a space capsule built by Lockheed Martin, and is paired with a European Service Module (ESM) provided by the European Space Agency (ESA) and manufactured by Airbus Defence and Space. Orion supports a crew of four beyond low Earth orbit for up to 21 days undocked or up to six months when docked. It is equipped with a NASA Docking System port and glass cockpit displays. It is intended to be launched atop the Space Launch System (SLS) rocket with a tower-mounted launch escape system.

Orion was conceived in the early 2000s by Lockheed Martin as a proposal for the Crew Exploration Vehicle (CEV) to be used in NASA's Constellation program and was selected by NASA in 2006. After the cancellation of the Constellation program in 2010, Orion was extensively redesigned for use in NASA's Journey to Mars initiative; later named Moon to Mars. The SLS became Orion's primary launch vehicle, and the service module was replaced with a design based on ESA's Automated Transfer Vehicle.

As of 2026, three flight-worthy vehicles had been built along with several boilerplates and test articles. Three additional flight-worthy vehicles are under construction.

In May 2025, the second Trump administration proposed terminating the Orion spacecraft program after Artemis III.[5] The One Big Beautiful Bill Act signed in July 2025 included a provision to fund procurement of Orion for Artemis IV and reuse in future missions.[6]

Design

[edit]
Currently operational crewed spacecraft (at least orbital class)
The crew of Artemis II training inside an Orion mock-up in January 2025
Annotated photo of the Orion mock-up, outfitted to fully simulate a crewed mission, 2021

Orion is based on the configuration of the Apollo command and service module (CSM), with a larger diameter, updated thermal protection system, and modern avionics. It is designed for deep space missions supporting up to 21 days of active crew operations and up to six months of quiescent spacecraft operation.[7] The Orion crew module launches with the European Service Module, a spacecraft adapter, and a launch abort system.

The Orion crew module (OCM) is a reusable capsule providing habitable volume, storage for consumables and research equipment, and an International Docking System Standard (IDSS) port for crew transfers.[8][9][10] It is the only major spacecraft element that returns to Earth after each mission and is designed for refurbishment and reuse, with modular systems intended to support incremental upgrades over time.[8]

Structure and manufacture

[edit]

The OCM is built of aluminum-lithium alloy and has a 57.5° frustum shape with a blunt spherical aft end, 5.02 meters (16 ft 6 in) in diameter and 3.3 meters (10 ft 10 in) in length,[11] with a mass of about 8.5 metric tons (19,000 lb). The module provides approximately 50% more internal volume than the Apollo command module and is designed to carry four astronauts on Artemis missions.[1] It is manufactured by Lockheed Martin, with the pressure vessel built at the Michoud Assembly Facility in New Orleans, Louisiana, and final assembly conducted at the Operations and Checkout Building at Kennedy Space Center in Florida.[12][13][14][15]

Thermal protection

[edit]

After evaluation of thermal protection materials, NASA selected AVCOAT for the ablative heat shield. AVCOAT consists of silica fibers embedded in a resin within a honeycomb structure of fiberglass and phenolic resin. It was previously used on the Apollo missions and the Space Shuttle orbiter.[16]

Crew systems and accommodations

[edit]

The OCM uses a glass cockpit with digital control systems derived in part from those used in the Boeing 787 Dreamliner.[17] The commander and pilot are seated facing three main display screens and seven switch panels within arm's reach, which provide spacecraft status information and allow control of onboard systems. A cursor control device enables interaction with the display screens under high g-forces, when the crew can not easily reach out. The interface supports both routine operations and anomaly response through integrated electronic procedures and warning systems. Rotational and translational hand controllers enable the crew to manually adjust the spacecraft's orientation and movement.[18][19]

The four crew seats are designed to accommodate a wide range of astronaut body sizes, from approximately the 1st to the 99th percentile,[a] and are adjustable. For launch and re-entry, astronauts are positioned on their backs with knees bent at a 90-degree angle and feet secured in foot pans. Each seat incorporates a five-point harness, headrests, and shoulder and hip bolsters, with foot restraints that interface with crew footwear to limit movement. The seats include an impact attenuation system, which reduces loads during splashdown by allowing controlled motion along guide rails. Once in orbit, the foot pans on the commander and pilot seats are removed and stowed to increase cabin space, and a cargo net over the mission specialist seats provides storage for equipment and suit components.[18][19]

The spacecraft operates with a mixed nitrogen/oxygen (N
2
/O
2
) atmosphere at either sea-level pressure (101.3 kPa or 14.69 psi) or a reduced pressure (55.2 to 70.3 kPa or 8.01 to 10.20 psi).[citation needed] As of 2019, the Spacecraft Atmosphere Monitor was planned to be used in the OCM.[20]

The Orion flywheel exercise device

The OCM includes the compact Orion flywheel exercise device, which allows astronauts to perform aerobic and resistance exercises during flight using a cable-driven flywheel mechanism. The system was designed to meet the spacecraft's mass and volume constraints while also allowing for a wide-range of exercises. Mounted below the side hatch, it also functions as a step for crew members entering or exiting the spacecraft.[18][21][22]

The OCM includes a space toilet called the Universal Waste Management System (UWMS) inside a fully enclosed 5-square-foot (0.46 m2) compartment for privacy that uses airflow to manage liquid and solid waste. Solid waste is stored in sealed containers, while treated liquid waste is vented overboard.[18]

The potable water dispenser supplies water for rehydrating food, preparing drinks, and supporting medical needs in Orion. It connects to four pressurized tanks in the service module. A briefcase-style food warmer plugs into Orion's power utility panel for operation and allows the crew to heat food and beverages. It can be secured to cabin surfaces using Velcro when needed and stowed when not in use.[18]

Launch and recovery

[edit]
Testing of Orion's parachute system

During launch, the spacecraft is equipped with a launch abort system (LAS), attached to the nose of the spacecraft. The spacecraft is covered by a fiberglass "Boost Protective Cover" that shields the crew module from aerodynamic and impact stresses during the first 2+12 minutes of ascent.[23]

The capsule is recovered by parachute-assisted water landing. The parachute system is derived from those used on Apollo spacecraft and Space Shuttle Solid Rocket Boosters and is constructed of Nomex.[24][25]

European Service Module (ESM)

[edit]

The European Service Module (ESM) is the service module component of the Orion spacecraft, serving as its primary power and propulsion component until it is discarded at the end of each mission. In January 2013, the National Aeronautics and Space Administration (NASA) announced that the European Space Agency (ESA) will contribute the service module for Artemis I, based on ESA's Automated Transfer Vehicle (ATV). It was delivered by Airbus Defence and Space from Bremen, Germany, to NASA at the end of 2018. After approval of the first module, ESA provided the ESM for Artemis II with current plans to continue the provision up to Artemis VI.

The module's first flight was Artemis I, the first major milestone in NASA's Artemis program to return humans to the Moon, on November 16, 2022. The Space Launch System launched Orion toward the Moon, where the ESM placed the spacecraft into distant retrograde orbit around the Moon, and subsequently extracted it from that orbit and sent it back to Earth.

The service module (SM) supports the crew module (CM) from launch through to separation prior to reentry. It provides in-space propulsion capability for orbital transfer, attitude control, and high altitude ascent aborts. It provides the water and oxygen needed for a habitable environment, generates and stores electrical power, and maintains the temperature of the vehicle's systems and components. This module can also transport unpressurized cargo and scientific payloads.[26]

Launch Abort System (LAS)

[edit]

In the event of an emergency on the launch pad or during ascent, the Launch Abort System (LAS) will separate the crew module from the launch vehicle using three solid rocket motors: an abort motor (AM),[27] an attitude control motor (ACM), and a jettison motor (JM). The AM provides the thrust needed to accelerate the capsule, while the ACM is used to point the AM[28] and the jettison motor separates the LAS from the crew capsule.[29] On July 10, 2007, Orbital Sciences, the prime contractor for the LAS, awarded Alliant Techsystems (ATK) a $62.5 million sub-contract to "design, develop, produce, test and deliver the launch abort motor," which uses a "reverse flow" design.[30] On July 9, 2008, NASA announced that ATK had completed construction of a vertical test stand at a facility in Promontory, Utah to test launch abort motors for the Orion spacecraft.[31] Another long-time space motor contractor, Aerojet, was awarded the jettison motor design and development contract for the LAS. As of September 2008, Aerojet has, along with team members Orbital Sciences, Lockheed Martin and NASA, successfully demonstrated two full-scale test firings of the jettison motor. This motor is used on every flight, as it separates the LAS from the vehicle after both a successful launch and a launch abort.[32]

Performance

[edit]

With the announcement in 2019 of the intent to procure a Human Landing System for Artemis missions, NASA provided Orion mass and propulsion capability values. After separation from the SLS upper stage, the Orion is expected to have a mass of 26,375 kg (58,147 lb) and be capable of performing maneuvers requiring up to 1,050 m/s (3,445 ft/s) of delta-v.[33]

History

[edit]
Transport of the Orion capsule before the first test (2013)

The Orion MPCV was announced by NASA on May 24, 2011.[34] Its design is based on the Crew Exploration Vehicle from the canceled Constellation program,[35] which had been a 2006 NASA contract award to Lockheed Martin.[36] The command module is being built by Lockheed Martin at the Michoud Assembly Facility,[13][14] while the Orion service module is being built by Airbus Defence and Space in Bremen with funding from the European Space Agency.[37][38][39][40] The CM's first uncrewed test flight (EFT-1) was launched without the EUS atop a Delta IV Heavy rocket on December 5, 2014, and lasted 4 hours and 24 minutes before landing at its target in the Pacific Ocean.[41][42][43][44]

Orion was primarily designed by Lockheed Martin Space Systems in Littleton, Colorado, with former Space Shuttle engineer Julie Kramer White at NASA as Orion's chief engineer.[45]

On November 30, 2020, it was reported that NASA and Lockheed Martin had found a failure with a component in one of the Orion spacecraft's power data units but NASA later clarified that it did not expect the issue to affect the Artemis I launch date.[46]

Funding history and planning

[edit]

NASA has spent $25.6 billion on Orion development from 2006 through 2025, in nominal dollars. This is equivalent to $33.6 billion in 2026 dollars using the NASA New Start Inflation Indices.[47]

Fiscal year Funding Source
In Nominal (millions) In 2026[47] (millions)
2006 $839.2 $1,367.9 Crew Exploration Vehicle (CEV)[48]
2007 $714.5 $1,121.4 CEV[49]
2008 $1,174.1 $1,779.3 CEV[50]
2009 $1,747.9 $2,599.4 CEV[50]
2010 $1,640.0 $2,406.0 CEV[50]
2011 $1,196.0 $1,726.8 MPCV[51]
2012 $1,200.0 $1,714.3 Orion MPCV[52]
2013 $1,138.0 $1,567.6 Orion MPCV[53]
2014 $1,197.0 $1,652.3 Orion Program[54]
2015 $1,190.2 $1,610.5 Orion Program[55]
2016 $1,270.0 $1,697.9 Orion Program[56]
2017 $1,350.0 $1,767.2 Orion[57]
2018 $1,350.0 $1,723.5 Orion[58]
2019 $1,350.0 $1,690.9 Orion[59]
2020 $1,406.7 $1,723.7 Orion[60]
2021 $1,403.7 $1,657.3 Orion[61]
2022 $1,401.7 $1,565.5 Orion[62]
2023 $1,315.1 $1,411.1 FY 2023 Op Plan in FY 2025 Budget Request[63]
2024 $1,283.7 $1,343.1 FY 2024 Op Plan in FY 2026 Budget Request[64]
2025 $1,431.4 $1,463.9 FY 2025 Spend Plan[65]
Total $25,575.0 $33,589.7

Excluded from the prior Orion costs are:

  • Most costs "for production, operations, or sustainment of additional crew capsules, despite plans to use and possibly enhance this capsule after 2021";[66] production and operations contracts were awarded going into fiscal year 2020.[67]
  • The costs of Orion's service module, provided by the European Space Agency. (The European Service Module.)
  • Excluded from the Orion cost above are the costs to assemble, integrate, prepare and launch the Orion, funded separately in the NASA Exploration Ground Systems program, running at about $600 million per year in 2021,[68] estimated then to remain in this range through the first four launches of Orion, though this ground systems element has risen to be budgeted at $909.9M in 2025.[65]
  • Costs of the launcher, the SLS, for the Orion spacecraft

In late 2015, the Orion program was assessed at a 70% confidence level for its first crewed flight by 2023,[69][70][71] but in January 2024 NASA announced plans for a first crewed flight of Orion no earlier than September 2025.[72] This has subsequently been updated to a first crewed flight with Orion, on mission Artemis II, which launched on April 1, 2026.[73][74]

In 2016, the NASA manager of exploration systems development said that Orion, SLS, and supporting ground systems should cost "US$2 billion or less" annually.[75] NASA will not provide the cost per flight of Orion and SLS, with associate administrator William H. Gerstenmaier stating "costs must be derived from the data and are not directly available. This was done by design to lower NASA's expenditures" in 2017.[76] As of 2020, there were no NASA estimates for the Orion program recurring yearly costs once operational, for a certain flight rate per year, or for the resulting average costs per flight. A production and operations contract[77] awarded to Lockheed Martin in 2019 indicated NASA will pay the prime contractor $900 million for the first three Orion capsules and $633 million for the next three.[78] For 2021 to 2025, NASA estimates[79] yearly budgets for Orion from $1.4 to $1.1 billion.

Attempted cancellation of Orion program

[edit]

On 2 May 2025, the Trump administration released its fiscal year 2026 budget proposal for NASA, which calls for terminating the Orion and SLS programs after Artemis III.[80][5] The budget allocates funding for a program to transition to "more cost-effective commercial systems".[81] However, this proposal was rejected by Congress on July 2025, favoring the continuation of the program alongside the SLS and the Lunar Gateway.[82]

Variants

[edit]

Orion Crew Exploration Vehicle (CEV)

[edit]
Orion CEV design as of 2009

The idea for a Crew Exploration Vehicle (CEV) was announced on January 14, 2004, as part of the Vision for Space Exploration after the Space Shuttle Columbia accident.[83] The CEV effectively replaced the conceptual Orbital Space Plane (OSP), a proposed replacement for the Space Shuttle. A design competition was held, and the winner was the proposal from a consortium led by Lockheed Martin. It was subsequently named "Orion" in 2006[84] after the stellar constellation and mythical hunter of the same name,[85] and became part of the Constellation program under NASA administrator Sean O'Keefe. As of 2006, NASA planned for the first flight to the International Space Station with astronauts onboard to be no later than 2014.[84]

Constellation proposed using the Orion CEV in both crew and cargo variants to support the International Space Station and as a crew vehicle for a return to the Moon. The crew/command module was originally intended to land on solid ground on the US west coast using airbags but later changed to ocean splashdown, while a service module was included for life support and propulsion.[24] With a diameter of 5 meters (16 ft 5 in) as opposed to 3.9 meters (12 ft 10 in), the Orion CEV would have provided 2.5 times greater volume than the Apollo CM.[86] The service module was originally planned to use liquid methane (CH4) as its fuel, but switched to hypergolic propellants due to the infancy of oxygen/methane-powered rocket technologies and the goal of launching the first uncrewed Orion CEV by 2012.[87][88][89]

The Orion CEV was to be launched on the Ares I rocket to low Earth orbit, where it would rendezvous with the Altair lunar lander launched on a heavy-lift Ares V launch vehicle for lunar missions.

Environmental testing

[edit]

NASA performed environmental testing of Orion from 2007 to 2011 at the Glenn Research Center Plum Brook Station in Sandusky, Ohio. The Center's Space Power Facility is the world's largest thermal vacuum chamber.[90]

Launch Abort System (LAS) testing

[edit]
Orion LAS test assembled at the NASA Langley Research Center

ATK Aerospace successfully completed the first Orion Launch Abort System (LAS) test on November 20, 2008. The LAS motor could provide 500,000 lbf (2,200 kN) of thrust in case an emergency situation should arise on the launch pad or during the first 300,000 feet (91 km) of the rocket's climb to orbit.[91]

On March 2, 2009, a full size, full weight command module mockup (pathfinder) began its journey from the Langley Research Center to White Sands Missile Range in southern New Mexico for at-gantry launch vehicle assembly training and for LES testing.[92] On May 10, 2010, NASA successfully executed the LES PAD-Abort-1 test at White Sands, launching a boilerplate (mock-up) Orion capsule to an altitude of approximately 6,000 feet (1,800 m). The test used three solid-fuel rocket motors – the main thrust motor, an attitude control motor and the jettison motor.[93]

Splashdown recovery testing

[edit]

In 2009, during the Constellation phase of the program, the Post-landing Orion Recovery Test (PORT) was designed to determine and evaluate methods of crew rescue and what kind of motions the astronaut crew could expect after landing, including conditions outside the capsule for the recovery team. The evaluation process supported NASA's design of landing recovery operations including equipment, ship and crew needs.

The PORT Test used a full-scale boilerplate (mock-up) of NASA's Orion crew module and was tested in water under simulated and real weather conditions. Tests began March 23, 2009, with a Navy-built, 18,000-pound (8,200 kg) boilerplate in a test pool. Full sea testing ran April 6–30, 2009, at various locations off the coast of NASA's Kennedy Space Center with media coverage.[94]

Cancellation of Constellation program

[edit]
Artist's conception of Orion (as then-designed) in lunar orbit

On May 7, 2009, the Obama administration enlisted the Augustine Commission to perform a full independent review of the ongoing NASA space exploration program. The commission found the then-current Constellation Program to be too under-budgeted with significant cost overruns, behind schedule by four years or more in several essential components, and unlikely to be capable of meeting any of its scheduled goals.[95][96] As a consequence, the commission recommended a significant re-allocation of goals and resources. As one of the many outcomes based on these recommendations, on October 11, 2010, the Constellation program was canceled, ending development of the Altair, Ares I, and Ares V. The Orion Crew Exploration Vehicle survived the cancellation and was transferred to be launched on the Space Launch System.[97]

Orion Multi-Purpose Crew Vehicle (MPCV)

[edit]

The Orion development program was restructured from three different versions of the Orion capsule, each for a different task,[98] to the development of the MPCV as a single version capable of performing multiple tasks.[4] On December 5, 2014, a developmental Orion spacecraft was successfully launched into space and retrieved at sea after splashdown on the Exploration Flight Test-1 (EFT-1).[99][100]

Orion splashdown recovery testing

[edit]
EFT-1 on top of a Delta IV Heavy

Before EFT-1 in December 2014, several preparatory vehicle recovery tests were performed, which continued the "crawl, walk, run" approach established by PORT. The Stationary Recovery Test (SRT) demonstrated the recovery hardware and techniques that were to be employed for the recovery of the Orion CM in the protected waters of Naval Station Norfolk using the LPD-17 type USS Arlington as the recovery ship.[101]

Orion Lite

[edit]

History

[edit]

Orion Lite is an unofficial name used in the media for a lightweight crew capsule proposed by Bigelow Aerospace in collaboration with Lockheed Martin. It was to be based on the Orion spacecraft that Lockheed Martin was developing for NASA. It was never developed. It was to be a lighter, less capable and a less expensive version of the full Orion.[102]

Orion Lite was intended to provide a stripped-down version of the Orion that would be available for missions to the International Space Station earlier than the more capable Orion, which is designed for longer duration missions to the Moon and Mars.[103]

Bigelow had begun working with Lockheed Martin in 2004. A few years later Bigelow signed a million-dollar contract to develop "an Orion mockup, an Orion Lite",[104] in 2009.[102]

The proposed collaboration between Bigelow and Lockheed Martin on the Orion Lite spacecraft has ended.[when?] Bigelow began work with Boeing on a similar capsule, the CST-100, which has no Orion heritage, and was one of the two systems selected under NASA's Commercial Crew Development (CCDev) program to transport crew to the ISS.[105]

Design

[edit]

Orion Lite's primary mission would be to transport crew to the International Space Station (ISS), or to private space stations such as the planned B330 from Bigelow Aerospace. While Orion Lite would have the same exterior dimensions as the Orion, there would be no need for the deep space infrastructure present in the Orion configuration. As such, the Orion Lite would have been able to support larger crews of around 7 people as the result of greater habitable interior volume and the reduced weight of equipment needed to support an exclusively low-Earth-orbit configuration.[106]

Recovery

[edit]

In order to reduce the weight of Orion Lite, the more durable heat shield of the Orion would be replaced with a lighter weight heat shield designed to support the lower temperatures of Earth atmospheric re-entry from low Earth orbit. Additionally, the current proposal calls for a mid-air retrieval, wherein another aircraft captures the descending Orion Lite module.[citation needed] To date, such a retrieval method has not been employed for crewed spacecraft, although it has been used with satellites.[107]

Flights

[edit]

Development test flights

[edit]
Mission and patch Launch (UTC) Launch site Launch vehicle Outcome Duration Summary
MLAS
July 8, 2009, 10:26 Wallops MLAS Success 57s Boilerplate launched on test flight of the Max Launch Abort System (MLAS)
Ares I-X
October 28, 2009, 15:30 Kennedy, LC‑39B Ares I-X Success 6m Boilerplate launched on test flight of the Ares I rocket
Pad Abort 1
May 6, 2010, 13:03 White Sands, LC‑32E Orion LAS Success 1m 35s Boilerplate launched on test of the launch abort system
Exploration Flight Test-1
December 5, 2014, 12:05 Cape Canaveral, SLC‑37 Delta IV Heavy Success 4h 24m Orbital flight test of Orion's heat shield, parachutes, jettisoning components, and on-board computers.[108] Did not fly with a ESM. Recovered by USS Anchorage.[109]
Ascent Abort-2
July 2, 2019, 11:00 Cape Canaveral, SLC‑46 Orion Abort Test Booster Success 3m 13s Boilerplate launched on test of the Launch Abort System
Artemis I
November 16, 2022, 06:47 Kennedy, LC‑39B SLS Success 25d 10h 55m 50s Uncrewed lunar orbit and return

Crewed missions

[edit]
Mission and patch Launch (UTC) Launch site Launch vehicle Crew Outcome Duration Summary
Artemis II
April 1, 2026, 22:35[110] Kennedy, LC‑39B SLS Success 9d 1h 32m 15s Flyby mission of the Moon to test Orion spacecraft systems, the capsule is named Integrity by the crew
Earth and Moon as seen by Artemis I, 28 November 2022

Upcoming missions

[edit]
Mission Launch date Crew Launch vehicle Duration
Artemis III Late 2027[111] TBA SLS TBA
Artemis IV Early 2028 TBA SLS ~30 days
Artemis V Late 2028 TBA SLS ~30 days

Commercial lunar missions

[edit]

In December 2025, Lockheed Martin announced plans to offer commercial flights to individuals and other space agencies aboard Orion in the future, aiming to reuse the capsules after Artemis III to drive down the cost of spacecraft operations.[112]

Potential Mars missions

[edit]
Artist rendering of the Orion CEV docked to a proposed Mars Transfer Vehicle

The Orion capsule is designed to support future missions to send astronauts to Mars, with many proposals for such a mission to take place in the 2030s, including in an official plan by NASA in 2015.[113] Since the Orion capsule provides only about 2.25 m3 (79 cu ft) of living space per crew member,[114] the use of an additional Deep Space Habitat (DSH) module featuring propulsion will be needed for long-duration missions. The complete spacecraft stack is known as the Deep Space Transport.[115] The habitat module will provide additional space and supplies, as well as facilitate spacecraft maintenance, mission communications, exercise, training, and personal recreation.[116] Some concepts for DSH modules would provide approximately 70.0 m3 (2,472 cu ft) of living space per crew member,[116] though the DSH module is in its early conceptual stage. DSH sizes and configurations may vary slightly, depending on crew and mission needs.[117] As of 2026, there are no plans for a crewed mission to Mars using Orion, and the mission timeline to launch in the early 2030s is deemed unfeasible.[118]

Canceled

[edit]

Asteroid Redirect Mission

[edit]

The Asteroid Redirect Mission (ARM), also known as the Asteroid Retrieval and Utilization (ARU) mission and the Asteroid Initiative, was a space mission proposed by NASA in 2013. The Asteroid Retrieval Robotic Mission (ARRM) spacecraft would rendezvous with a large near-Earth asteroid and use robotic arms with anchoring grippers to retrieve a 4-meter boulder from the asteroid. A secondary objective was to develop the required technology to bring a small near-Earth asteroid into lunar orbit – "the asteroid was a bonus." There, it could be analyzed by the crew of the Orion EM-5 or EM-6 ARCM mission in 2026.[119]

List of vehicles

[edit]
  Boilerplate   Test article   Spaceflight vehicle

See also

[edit]

Notes

[edit]
  1. ^ This covers a range from a 4-foot-10-inch (1.47 m), 94-pound (43 kg) female to a 6-foot-5-inch (1.96 m), 243-pound (110 kg) male.

References

[edit]

Public Domain This article incorporates public domain material from websites or documents of the National Aeronautics and Space Administration.

  1. ^ a b c "Orion Reference Guide" (PDF). NASA Johnson Space Center. Archived (PDF) from the original on October 5, 2023. Retrieved September 29, 2023.
  2. ^ "NASA Authorization Act of 2010". Thomas.Loc.gov. Archived from the original on December 19, 2010. Retrieved November 20, 2010.
  3. ^ C. Bergin (July 10, 2012). "NASA ESD set key Orion requirement based on Lunar missions". NASASpaceflight.com. Archived from the original on July 17, 2012. Retrieved July 23, 2012.
  4. ^ a b "Orion Quick facts" (PDF). NASA. August 4, 2014. Archived (PDF) from the original on June 3, 2016. Retrieved October 29, 2015.
  5. ^ a b Dooren, Jennifer M.; Stevens, Bethany (May 2, 2025). "President Trump's FY26 Budget Revitalizes Human Space Exploration". NASA (Press release). Retrieved May 2, 2025.
  6. ^ "One Big Beautiful Bill Act". Public Law 119–21. 119th United States Congress. July 4, 2025. 139 Stat. 134 (SEC. 40005, appropriations for SLS, Orion, and Artemis Missions IV and V). Retrieved January 18, 2026.
  7. ^ Peterson, L. (2009). "Environmental Control and Life Support System (ECLSS)" (PDF). NTRS.nasa.gov. Ames Research Center: NASA. Archived (PDF) from the original on April 7, 2014. Retrieved April 7, 2014.
  8. ^ a b J. Scharr (June 13, 2013). "NASA Goes 'Green': Next Spacecraft to be Reusable – Orion Capsule". Space.com. Archived from the original on December 4, 2014. Retrieved November 30, 2014.
  9. ^ "NASA – A 21st Century-Style Return to the Moon". nasa.gov. Archived from the original on September 5, 2017. Retrieved June 3, 2018.
  10. ^ C. Bergin (October 30, 2014). "EFT-1 Orion completes assembly and conducts FRR". NASASpaceflight.com. Archived from the original on August 17, 2016. Retrieved November 10, 2014.
  11. ^ "NASA – Orion Crew Exploration Vehicle" (PDF) (Press release). NASA. February 7, 2009. Archived (PDF) from the original on April 8, 2021. Retrieved February 7, 2009.
  12. ^ "Lockheed to build Nasa 'Moonship'". BBC News. August 31, 2006. Archived from the original on April 17, 2021. Retrieved March 1, 2007.
  13. ^ a b LaNasa, Shannon (2021). "Michoud Tenants: Lockheed Martin". Marshall Space Flight Center. NASA. Archived from the original on March 18, 2021. Retrieved June 27, 2021.Public Domain This article incorporates text from this source, which is in the public domain.
  14. ^ a b Cristina, Victoria (April 26, 2021). "Behind the scenes at NASA Michoud: Assembly of the Orion Crew Modules". WGNO. Nexstar Media Group. Archived from the original on November 16, 2022. Retrieved February 12, 2022.
  15. ^ NASA Orion public relations [@NASA_Orion] (September 10, 2021). "Technicians at NASA's Michoud Assembly Facility completed the welding on Orion's pressure vessel which will carry @NASA_Astronauts to the Moon on #Artemis III" (Tweet) – via Twitter.
  16. ^ "NASA Selects Material for Orion Spacecraft Heat Shield" (Press release). NASA Ames Research Center. April 7, 2009. Archived from the original on March 17, 2021. Retrieved April 16, 2009.
  17. ^ Coppinger, Rob (October 6, 2006). "NASA Orion crew vehicle will use voice controls in Boeing 787-style Honeywell smart cockpit". Flight International.
  18. ^ a b c d e "Life Inside Orion Fact Sheet" (PDF). NASA. February 2026. Retrieved April 13, 2026.
  19. ^ a b "Crew Systems". NASA. March 5, 2025. Retrieved April 15, 2026.
  20. ^ Hill, Denise (July 23, 2019). "S.A.M. Goes to Work Aboard ISS". NASA. Archived from the original on November 7, 2020. Retrieved July 31, 2019.
  21. ^ "Artemis II Flight Day 2: Orion Completes TLI Burn, Crew Begins Journey to the Moon". NASA. April 2, 2026.
  22. ^ Hanson, Mike (April 3, 2026). "Artemis II crew space moon mission". WESH. Retrieved April 9, 2026.
  23. ^ "NASA Announces Key Decision For Next Deep Space Transportation System". NASA. May 24, 2011. Archived from the original on September 15, 2016. Retrieved May 25, 2011.
  24. ^ a b C. Bergin (August 5, 2007). "Orion landings to be splashdowns – KSC buildings to be demolished". NASASpaceflight.com. Archived from the original on June 7, 2016. Retrieved August 6, 2007.
  25. ^ "NASA Denies Making Orion Water Landing Decision – and Deleting Touchdowns on Land". NASA Watch. August 6, 2007. Retrieved November 23, 2010.
  26. ^ "Explore the Exploration Vehicle". NASA. June 6, 2013. Archived from the original on May 6, 2021. Retrieved February 6, 2021. Public Domain This article incorporates text from this source, which is in the public domain.
  27. ^ "Mission to the Moon: How We'll Go Back – and Stay This Time". popularmechanics.com. Archived from the original on February 3, 2008. Retrieved February 8, 2008.
  28. ^ Mika McKinnon (December 4, 2014). "Meet Orion, NASA's New Deep Space Explorer". Earth & Space. Space.io9.com. Archived from the original on November 8, 2015. Retrieved October 31, 2016.
  29. ^ "Launch Abort System Jettison Motor | Aerojet Rocketdyne". Rocket.com. Archived from the original on January 25, 2016. Retrieved October 31, 2016.
  30. ^ "ATK Awarded Contract for Orion Launch Abort Motors" (Press release). PRNewswire. Archived from the original on March 1, 2012.
  31. ^ "Orion's New Launch Abort Motor Test Stand Ready for Action". NASA. Archived from the original on June 4, 2011. Retrieved January 5, 2012.
  32. ^ Rhian, Jason (July 17, 2018). "Jettison Motor Readied For Integration Into Orion's LAS". spaceflightinsider.com. Spaceflight Insider. Archived from the original on July 1, 2019. Retrieved July 1, 2019. The jettison motor separates the LAS from the Orion capsule on its way to orbit.
  33. ^ "NextSTEP-2 Appendix H, Attachment F: Human Landing System to Orion Interface Requirements Document (HLS-IRD-005)". NASA. September 30, 2019.
  34. ^ M. Wall (May 24, 2011). "NASA Unveils New Spaceship for Deep Space Exploration". Space.com. Archived from the original on May 25, 2011. Retrieved May 26, 2011.
  35. ^ Moen, Marina M. (August 8, 2011). Feasibility of Orion Crew Module Entry on Half of Available Propellant Due to Tank Isolation Fault. AIAA Guidance, Navigation, and Control Conference. American Institute of Aeronautics and Astronautics. hdl:2060/20110014641 – via NASA Technical Reports Server.
  36. ^ "NASA Selects Lockheed Martin To Be Orion Crew Exploration Vehicle Prime Contractor" (Press release). NASA. August 31, 2006. Retrieved August 31, 2006.{{cite press release}}: CS1 maint: deprecated archival service (link)
  37. ^ "NASA Signs Agreement for a European-Provided Orion Service Module". nasa.gov. January 16, 2013. Archived from the original on March 28, 2014. Retrieved March 28, 2014.
  38. ^ "ESA workhorse to power NASA's Orion spacecraft / Research / Human Spaceflight / Our Activities / ESA". Esa.int. January 16, 2013. Archived from the original on November 13, 2015. Retrieved July 15, 2014.
  39. ^ "Multi Purpose Crew Vehicle – European Service Module for NASA's Orion programme". Airbus Defence and Space. Archived from the original on March 6, 2016. Retrieved March 7, 2016.
  40. ^ "Call for media: The European Service module meets Orion". European Space Agency. October 26, 2018. Archived from the original on February 6, 2020. Retrieved February 6, 2020.
  41. ^ C. Bergin (March 15, 2014). "EFT-1 Orion slips to December – Allows military satellite to launch first". NASASpaceflight.com. Archived from the original on March 28, 2014. Retrieved March 29, 2014.
  42. ^ S. Clark (March 15, 2014). "Launch schedule shakeup delays Orion to December". Spaceflight Now. Archived from the original on March 28, 2014. Retrieved March 29, 2014.
  43. ^ "Orion Exploration Flight Test-1". aerospaceguide.net. January 11, 2014. Archived from the original on March 28, 2014. Retrieved March 28, 2014.
  44. ^ H. Fountain (December 5, 2014). "NASA's Orion Spacecraft Splashes Down in Pacific After Test Flight". The New York Times. Archived from the original on April 12, 2019. Retrieved December 6, 2014.
  45. ^ Cesar, Alan (December 15, 2023). "An Aerospace Titan Rooted in the Midwest". Aerogram. Archived from the original on January 9, 2024. Retrieved January 9, 2024.
  46. ^ Grush, Loren (November 30, 2020). "Component failure in NASA's deep-space crew capsule could take months to fix". The Verge. Archived from the original on December 4, 2020. Retrieved December 3, 2020.
  47. ^ a b NASA FY22 Inflation Tables – to be utilized in FY23 Archived 31 October 2022 at the Wayback Machine” (Excel). NASA. Retrieved October 31, 2022. This article incorporates text from this source, which is in the public domain.
  48. ^ "FY 2008 Budget Estimates" (PDF). National Aeronautics and Space Administration. p. ESMD-25. Archived (PDF) from the original on June 3, 2016. Retrieved June 7, 2016.
  49. ^ "Fiscal Year 2009 Budget Estimates" (PDF). National Aeronautics and space Administration. p. iv. Archived (PDF) from the original on March 15, 2019. Retrieved June 7, 2016.
  50. ^ a b c "Fiscal Year 2010 Budget Estimates" (PDF). National Aeronautics and Space Administration. p. v. Archived (PDF) from the original on August 6, 2016. Retrieved June 7, 2016.
  51. ^ "FY 2013 President's Budget Request Summary" (PDF). National Aeronautics and Space Administration. p. BUD-4. Archived (PDF) from the original on December 28, 2016. Retrieved June 7, 2016.
  52. ^ "FY 2014 President's Budget Request Summary" (PDF). National Aeronautics and Space Administration. p. BUD-8. Archived (PDF) from the original on February 17, 2017. Retrieved June 7, 2016.
  53. ^ "FY 2015 President's Budget Request Summary" (PDF). National Aeronautics and Space Administration. p. BUD-5. Archived (PDF) from the original on February 15, 2017. Retrieved June 7, 2016.
  54. ^ "FY 2016 President's Budget Request Summary" (PDF). National Aeronautics and space Administration. p. BUD-5. Archived (PDF) from the original on April 14, 2016. Retrieved June 7, 2016.
  55. ^ "FY 2017 Budget Estimates" (PDF). nasa.gov. National Aeronautics and Space Administration. p. BUD-4. Archived (PDF) from the original on November 7, 2017. Retrieved January 1, 2019.
  56. ^ "FY 2018 Budget Estimates" (PDF). nasa.gov. National Aeronautics and Space Administration. p. BUD-3. Archived (PDF) from the original on November 5, 2017. Retrieved January 1, 2019.
  57. ^ "Public Law 115-31, 115th Congress" (PDF). congress.gov. p. 213. Archived (PDF) from the original on December 22, 2018. Retrieved January 1, 2019.
  58. ^ "2018 Consolidated Appropriations Act" (PDF). congress.gov. p. 82. Archived (PDF) from the original on December 23, 2018. Retrieved January 1, 2019.
  59. ^ "FY 2021 President's Budget Request Summary" (PDF). National Aeronautics and Space Administration. p. DEXP-4. Archived (PDF) from the original on June 17, 2020. Retrieved May 10, 2020.
  60. ^ "H.R.1158 – 116th Congress (2019–2020): Consolidated Appropriations Act, 2020". www.congress.gov. December 20, 2019. p. 250. Archived from the original on January 10, 2020. Retrieved January 9, 2020.
  61. ^ "National Aeronautics and Space Administration FY 2021 Spending Plan" (PDF). NASA. Archived from the original 31 October 2022. Retrieved 31 October 2022 This article incorporates text from this source, which is in the public domain.
  62. ^ "Consolidated Appropriations Act, 2022" (PDF). Retrieved 31 October 2022. p.212. Archived from the original on 31 October 2022. This article incorporates text from this source, which is in the public domain.
  63. ^ "FY 2025 President's Budget Request Summary" (PDF). National Aeronautics and Space Administration. Archived (PDF) from the original on August 22, 2025. Retrieved August 22, 2025.
  64. ^ "FY 2026 President's Budget Request Summary" (PDF). National Aeronautics and Space Administration. Archived (PDF) from the original on August 22, 2025. Retrieved August 22, 2025.
  65. ^ a b "NASA FY 2025 Spend Plan" (PDF). National Aeronautics and Space Administration. Archived from the original (PDF) on April 29, 2026. Retrieved April 30, 2026.
  66. ^ "NASA Actions Needed to Improve Transparency and Assess Long Term Affordability of Human Exploration Programs" (PDF). General Accounting Office. May 2014. p. 2. Archived (PDF) from the original on March 10, 2016. Retrieved June 7, 2016.
  67. ^ "NASA Commits to Long-term Artemis Missions with Orion Production Contract". NASA.gov. Archived from the original on July 21, 2020. Retrieved July 26, 2020.
  68. ^ "National Aeronautics and Space Administration FY 2022 Spending Plan" (PDF). NASA. Retrieved 03 January 2023. Archived from the original on 03 January 2023. This article incorporates text from this source, which is in the public domain.
  69. ^ J. Foust (September 16, 2015). "First Crewed Orion Mission May Slip to 2023". Space News. Archived from the original on September 23, 2015. Retrieved September 17, 2015.
  70. ^ S. Clark (September 16, 2015). "Orion spacecraft may not fly with astronauts until 2023". Spaceflight Now. Archived from the original on July 1, 2016. Retrieved June 7, 2016.
  71. ^ Smith, Marcia (May 1, 2014). "Mikulski "Deeply Troubled" by NASA's Budget Request; SLS Won't Use 70 Percent JCL". spacepolicyonline.com. Archived from the original on August 5, 2016. Retrieved June 7, 2016.
  72. ^ J. Foust (January 9, 2024). "NASA delays Artemis 2 and 3 missions". Space News. Retrieved June 7, 2024.
  73. ^ "Orion's Missions". National Aeronautics and Space Administration. Retrieved August 22, 2025.
  74. ^ Dunn, Marcia (April 1, 2026). "Artemis II astronauts bound for moon after rocketing away on NASA's first lunar voyage in decades". Associated Press. Retrieved April 2, 2026.{{cite news}}: CS1 maint: url-status (link)
  75. ^ E. Berger (August 19, 2016). "How much will SLS and Orion cost to fly? Finally, some answers". Ars Technica. Archived from the original on December 24, 2018. Retrieved January 1, 2019.
  76. ^ E. Berger (October 20, 2017). "NASA chooses not to tell Congress how much deep space missions cost". Ars Technica. Archived from the original on December 17, 2018. Retrieved January 1, 2019.
  77. ^ "Orion Production and Operations Contract". govtribe.com. Archived from the original on July 26, 2020. Retrieved July 26, 2020.
  78. ^ E. Berger (September 24, 2019). "After 15 years of development, Lockheed wins new cost-plus contract for Orion; Originally, NASA had hoped for a fixed-price deal". Ars Technica. Archived from the original on July 16, 2020. Retrieved July 26, 2020.
  79. ^ "NASA FY 2021 Budget Estimates" (PDF). NASA.gov. Archived (PDF) from the original on July 27, 2020. Retrieved July 26, 2020.
  80. ^ E. Berger (May 2, 2025). "White House budget seeks to end SLS, Orion, and Lunar Gateway programs". Ars Technica. Retrieved May 3, 2025.
  81. ^ "Fiscal Year 2026 Discretionary Budget Request" (PDF). United States Office of Management and Budget. May 2, 2025. p. 37.
  82. ^ S. Clark (July 15, 2025). "Congress moves to reject bulk of White House's proposed NASA cuts". Ars Technica. Retrieved January 2, 2026.
  83. ^ "President Bush Announces New Vision for Space Exploration Program" (Press release). White House Office of the Press Secretary. January 14, 2004. Archived from the original on May 21, 2011. Retrieved September 1, 2006.
  84. ^ a b "NASA Makes It Official: CEV Will Be Called 'Orion'". Aero News Network. August 23, 2006.
  85. ^ "Orion Spacecraft – Nasa Orion Spacecraft". aerospaceguide.net. Archived from the original on August 6, 2016. Retrieved February 2, 2013.
  86. ^ "NASA Names New Crew Exploration Vehicle Orion" (Press release). NASA. August 22, 2006. Archived from the original on January 27, 2012. Retrieved April 17, 2010.
  87. ^ Handlin, Daniel; Bergin, Chris (October 11, 2006). "NASA sets Orion 13 for Moon Return". NASAspaceflight.com. Archived from the original on April 17, 2021. Retrieved March 3, 2007.
  88. ^ Handlin, Daniel; Bergin, Chris (July 22, 2006). "NASA makes major design changes to CEV". NASAspaceflight.com. Archived from the original on April 17, 2021. Retrieved March 3, 2007.
  89. ^ "NASA Names Orion Contractor". NASA. August 31, 2006. Archived from the original on November 20, 2011. Retrieved September 5, 2006.
  90. ^ "NASA Glenn To Test Orion Crew Exploration Vehicle". SpaceDaily. Archived from the original on February 10, 2012. Retrieved January 5, 2012.
  91. ^ "NASA: Constellation Abort Test November 2008". Nasa.gov. December 11, 2008. Archived from the original on April 8, 2021. Retrieved November 20, 2010.
  92. ^ "NASA Orion LAS Pathfinder". Nasa.gov. Archived from the original on April 8, 2021. Retrieved November 20, 2010.
  93. ^ "NASA Completes Test of Orion Crew Capsule". Fox News. May 6, 2010. Archived from the original on January 23, 2014. Retrieved April 6, 2013.
  94. ^ "NASA Orion PORT Test". Nasa.gov. March 25, 2009. Archived from the original on November 24, 2010. Retrieved November 20, 2010.
  95. ^ Augustine Commission Final Report Archived November 22, 2009, at the Wayback Machine. Published 22 Oct. 2009. Retrieved 14 December 2014.
  96. ^ NASA in Obama's Hands. Archived December 22, 2015, at the Wayback Machine. Information Addict Website, by Nathaniel Downes. Published 18 June 2012. Retrieved 14 Dec 2014.
  97. ^ "Today – President Signs NASA 2010 Authorization Act". Universetoday.com. Archived from the original on February 5, 2021. Retrieved November 20, 2010.
  98. ^ What is NASA's Constellation Program? archived from the original the original Sciences 360 Website, By Tenebris. Discussion of multiple version development of Orion capsule. Published Nov. 17, 2009. Retrieved July 5, 2014.
  99. ^ "Orion Spacecraft Complete". NASA. October 30, 2014. Archived from the original on October 31, 2014. Retrieved October 30, 2014.
  100. ^ Fountain, Henry (December 5, 2014). "NASA's Orion Spacecraft Splashes Down in Pacific After Test Flight". The New York Times. Archived from the original on December 13, 2014. Retrieved December 5, 2014.
  101. ^ "NASA & US Navy Test Demonstrates Water Recovery of Orion Crew Capsule". UniverseToday.com. August 16, 2013. Archived from the original on October 4, 2013. Retrieved July 15, 2014.
  102. ^ a b A. Klamper (August 14, 2009). "Nevada Company Pitches 'Lite' Concept for NASA's New Spaceship". Space.com. Archived from the original on November 9, 2020. Retrieved October 17, 2020.
  103. ^ Klamper, Amy (August 14, 2009). "Company pitches 'lite' spaceship to NASA". NBC News. Archived from the original on February 12, 2020. Retrieved September 7, 2009.
  104. ^ Bigelow still thinks big Archived July 7, 2012, at the Wayback Machine, The Space Review, 2010-11-01, accessed 2010-11-02. "[In October 2010] Bigelow revealed that he had been working with Lockheed Martin on a capsule concept in the 2004–2005 period. 'We engaged in a million-dollar contract a couple years after that with Lockheed, and they created for us an Orion mockup, an Orion Lite.'
  105. ^ Rincon, Paul (August 3, 2021). "Boeing's Starliner spacecraft: A guide". BBC. Archived from the original on October 1, 2024. Retrieved October 28, 2024.
  106. ^ Space Hotel Visionary Proposes Modified "Orion Lite" Spaceship for NASA: Bigelow Airspace's concept is for low Earth-orbit missions only Archived June 11, 2020, at the Wayback Machine, Popular Science, Jeremy Hsu, 14 August 2009
  107. ^ "Discoverer 14 – NSSDC ID: 1960-010A". NASA. Archived from the original on June 11, 2020. Retrieved February 8, 2020.
  108. ^ "NASA's New Orion Spacecraft Completes First Spaceflight Test". NASA.gov. Archived from the original on November 12, 2020. Retrieved December 9, 2014.
  109. ^ "Orion Off-loaded for Trip Back to Florida". NASA.gov. December 9, 2014. Archived from the original on March 23, 2015. Retrieved December 9, 2014.
  110. ^ Cameron, Claire. "NASA scraps 2027 Artemis III moon landing in favor of 2028 mission". Scientific American. Retrieved March 11, 2026.
  111. ^ Clark, Stephen (April 28, 2026). "Put it in pencil: NASA's Artemis III mission will launch no earlier than late 2027". Ars Technica. Retrieved April 28, 2026.
  112. ^ K. H. Platt (December 28, 2025). "Orion Capsule's Maker Set To Offer Moon Treks To Spacefarers Worldwide". Forbes. Retrieved January 1, 2026.
  113. ^ "NASA's Journey To Mars - Pioneering Next Steps in Space Exploration" (PDF). NASA. October 8, 2015. Retrieved April 2, 2026.{{cite web}}: CS1 maint: url-status (link)
  114. ^ "Preliminary Report Regarding NASA's Space Launch System and Multi-Purpose Crew Vehicle" (PDF). NASA. January 2011. Archived (PDF) from the original on February 13, 2017. Retrieved June 18, 2011.
  115. ^ NASA Unveils the Keys to Getting Astronauts to Mars and Beyond Archived November 11, 2020, at the Wayback Machine. Neel V. Patel, The Inverse. April 4, 2017.
  116. ^ a b Habitat for Long Duration Deep Space Missions. Archived September 20, 2015, at the Wayback Machine. Preliminary design proposal for DSH by Rucker & Thompson. Published 5 May 2012, retrieved 8 December 2014.
  117. ^ 2012 X-Hab Academic Innovation Challenge Progress Update. Archived March 20, 2015, at the Wayback Machine. NASA DSH design news update. Published June 21, 2012, retrieved 8 Dec. 2014.
  118. ^ J. Foust (April 18, 2019). "Independent report concludes 2033 human Mars mission is not feasible". Space News. Retrieved November 9, 2021.{{cite web}}: CS1 maint: deprecated archival service (link)
  119. ^ J. Foust (June 14, 2017). "NASA closing out Asteroid Redirect Mission". Space News. Archived from the original on June 15, 2017. Retrieved September 9, 2017.
  120. ^ Dryden Flight Research Center (May 6, 2010). "Orion Pad Abort 1 Test a Spectacular Success". National Aeronautics and Space Administration (NASA). Archived from the original on March 10, 2020. Retrieved March 10, 2020. The 500,000-lb. thrust abort motor rocketed the boilerplate crew module and its launch abort stack away from launch pad 32E at White Sands...
  121. ^ R. Pearlman (May 7, 2010). "NASA's Launch Abort Test Builds on 50 Years of Astronaut Escape Systems". Space.com. Archived from the original on March 10, 2020. Retrieved March 11, 2020. The Pad Abort-1 (PA1) flight test, which flew a boilerplate 16-foot (4.9-meter) wide, 18,000-pound (8,160-kg) Orion capsule under a nearly 45-foot (13.7-meter)long launch abort system (LAS) tower [...] The flight lasted about 135 seconds from launch until the module touched down...
  122. ^ S. Clark (July 1, 2019). "Critical abort test of NASA's Orion crew capsule set for Tuesday". Spaceflight Now. Archived from the original on March 10, 2020. Retrieved March 11, 2020. "So 20 seconds after the LAS (launch abort system) jettisons from the crew module, we start ejecting, so the first pair comes out 20 seconds after the LAS is jettisoned, and then every 10 seconds until all 12 are ejected." The capsule is expected to tumble after the abort system jettisons, and it will impact the sea at 300 mph (480 kilometers per hour) around 7 miles (11 kilometers) offshore, and is designed to sink to the ocean floor, according to Reed.
  123. ^ Sloss, Philip (October 25, 2019). "NASA conducting data deep dive following July's Orion ascent abort test". NASASpaceFlight.com. Retrieved March 10, 2020. The Ascent Abort-2 test used a ballistic missile to accelerate a production-design LAS with a Crew Module shaped, highly-instrumented test lab to carefully picked flight condition where a full LAS abort sequence was executed. [...] impact with the water destroyed the test article.{{cite web}}: CS1 maint: deprecated archival service (link)
  124. ^ "Orion Drop Test – Jan. 06, 2012". Space-travel.com. Archived from the original on January 13, 2012. Retrieved July 15, 2014.
  125. ^ a b c d "Orion Reference Guide" (PDF). NASA. November 10, 2022. Retrieved April 13, 2025.
  126. ^ "What Goes Up Must Come Down As Orion Crew Vehicle Development Continues". Space-travel.com. Archived from the original on January 6, 2012. Retrieved July 15, 2014.
  127. ^ "NASA Conducts Orion Parachute Testing for Orbital Test Flight". Space-travel.com. Archived from the original on January 10, 2012. Retrieved July 15, 2014.
  128. ^ C. Bergin (February 26, 2012). "Orion PTV preparing for drop test on Wednesday – EFT-1 Orion progress". NASASpaceflight.com. Archived from the original on February 28, 2012. Retrieved July 15, 2014.
  129. ^ "NASA Conducts New Parachute Test for Orion". Space-travel.com. Archived from the original on March 4, 2012. Retrieved July 15, 2014.
  130. ^ Kremer, Ken (March 30, 2010). "3 Welds to Go for 1st Orion Pathfinder Vehicle". Universe Today. Retrieved March 10, 2020. ...the very first pathfinder Orion manned capsule – the Crew Module – known as the Ground Test Article (GTA) [...] The GTA is the first full-sized, flight-like test article for Orion.{{cite web}}: CS1 maint: deprecated archival service (link)
  131. ^ C. Bergin (November 14, 2011). "EFT-1 Orion receives hatch door – Denver Orion ready for Modal Testing". NASASpaceflight.com. Archived from the original on March 10, 2020. Retrieved March 11, 2020. As much as the Service Module (SM) design is still undergoing evaluation – which includes discussions about utilizing hardware from the European Space Agency's ATV (Automated Transfer Vehicle) – the test vehicle includes an Orion Ground Test Article (GTA), in a Launch Abort Vehicle (LAV) configuration, with installed ogives and a mock SM
  132. ^ Crane, Aimee (June 25, 2020). "Orion's 'Twin' Completes Structural Testing for Artemis I Mission". NASA. Archived from the original on November 16, 2022. Retrieved November 16, 2022.
  133. ^ Dunn, Marcia (December 6, 2014). "NASA launches new Orion spacecraft and new era (w/ video)". Tampa Bay Times. Archived from the original on March 10, 2020. Retrieved March 10, 2020. Friday's Orion — serial number 001 — lacked seats, cockpit displays and life-support equipment, but brought along bundles of toys and memorabilia...
  134. ^ a b Davis, Jason (December 5, 2014). "Orion Returns to Earth after Successful Test Flight". The Planetary Society. Archived from the original on March 10, 2020. Retrieved March 10, 2020. As impressive as this flight was, this was just serial number 001 of Orion," he said. "Serial number 002—that one is going to be on the Space Launch System.
  135. ^ "Orion EFT-1 flown spacecraft joins display in 'NASA Now' exhibit | collectSPACE". collectSPACE.com. Retrieved September 21, 2020.
  136. ^ a b c d e Vuong, Zen (December 3, 2014). "JPL joins NASA's first agency-wide social media event to highlight Thursday's Orion flight test". Pasadena Star-News. Archived from the original on March 10, 2020. Retrieved March 10, 2020. Orion 002, 003 and 004 will become lessons that will further humanity in its quest to inhabit Mars and become Earth-independent. [...] "Orion tail number 003 has a special place in my heart," he said. "Four of my astronauts are going to climb into it and have an adventure of a lifetime...
  137. ^ @NASAGroundSys (April 25, 2023). "De-servicing of Artemis I Crew Module complete! Teams in the Multi-Payload Processing Facility completed cleaning cycles & removal of avionics to be reused on @NASA_Orion for Artemis II. The capsule will be used as an environmental test article on future Artemis missions" (Tweet) – via Twitter.
  138. ^ a b c Damadeo, Kristyn (September 9, 2021). "Next Generation of Orion Spacecraft in Production". NASA. Archived from the original on September 23, 2021. Retrieved October 6, 2021.
[edit]