Closed consultations
Elering and Conexus have initiated a public consultation on the amendment of the Common Regulations for the Natural Gas Balancing of Transmission System for the Estonia-Latvia gas zone.
The content of the amendment is explained in more detail in the attached consultation invitation.
We welcome feedback from market participants (in English) by 02.07.2025. Please send feedback to [email protected] or [email protected].
Attachment:
Public Consultation on the Amendments to the Common Regulations for the Natural Gas Balancing of Transmission System
Common Regulations for the...
Elering and Conexus have initiated a public consultation on the amendment of the Common Regulations for the Use of Natural Gas Transmission System for the Estonia-Latvia gas zone to.
The content of the amendment is explained in more detail in the attached consultation invitation.
We welcome feedback from market participants (in English) by 20.12.2024. Please send feedback to [email protected] or [email protected].
Elering would like to receive feedback from market participants regarding the standard terms and conditions, and standard products for frequency restoration reserves.
Please submit your feedback on the documents below using the attached form by December 11th to the email address: [email protected].
Proposed amendments have been made to the standard terms and conditions for manually activated reserves (mFRR) and the description of the standard product, in relation to updates in market surveillance and confidentiality principles. The changes are marked in the document. Additionally, we...
Elering is seeking feedback on the principles for intra-hour regulation of the Estonia electricity system (available only in Estonian), which have been prepared based on §39(1)3¹ of the Electricity Market Act. The consulted principles reflect the changes that will take place in the balancing of the electricity system following the implementation of the pan-European manual frequency restoration reserve (mFRR) platform MARI on October 9, 2024, and the pan-European automatic frequency restoration reserve (aFRR) platform PICASSO in January 2025, and will remain in force until the synchronization...
The Baltic TSOs have clarified Chapter 3 of the document on harmonized prequalification requirements, within which the general requirements for units offering reserves were specified.
The public consultation will focus solely on the changes made within Chapter 3.
The consultation is open until 30.06.2024 (including).
The purpose of this consultation, developed by the TSOs and coordinated with the Finnish gas transmission system operator Gasgrid Finland Oy, is to inform and gather public opinion on the second amendment package concerning proposed draft changes to the BC capacity allocation principles.
Please refer to the attached public consultation invitation for details.
Latvian and Estonian natural gas transmission system operators, JSC "Conexus Baltic Grid" and Elering AS (hereafter referred to as TSOs), are initiating a public consultation on proposed amendments to the Common Regulations for the Use of Natural Gas Transmission System (hereafter referred to as Amendments). The aim of this consultation is to gather input from stakeholders regarding the draft Amendments.
To enhance the readability and legal clarity of the joint network rules 'Common Regulations for the Use of Natural Gas Transmission System' between Estonia and Latvia, the TSOs, propose the...
AS Augstsprieguma tīkls, Elering AS and Litgrid AB (the Baltic TSOs) have prepared the concept for the Baltic balancing capacity market, including the relevant methodology proposals according to the contents of the Electricity Balancing Regulation ((EU) 2017/2195 hereinafter EBGL).
Previously, the rules for allocating cross-zonal capacity for the exchange of balancing capacity or sharing of reserves (according to EBGL article 41(1)) and the rules for joint procurement of balancing capacity (according to EBGL articles 33(1) and 38(1) have been publicly consulted.
Additionally, EBGL...
Elering submitted to the public consultation the ten-year development plan of the Estonian gas transmission network for the period 2023-2032, which provides an overview of the investments made in the gas transmission network, development plans, and the security of gas supply in Estonia.
All market participants were able to familiarize themselves with the development plan and give feedback. The deadline for giving feedback was no later than 12.02.2023 by e-mail to [email protected].
The Baltic system operators (AS Augstsprieguma tīkls, Elering AS and Litgrid AB) present the energy market concept document for automated frequency restoration reserves (aFRR) for public consultation.
The document provides an overview of the parameters of the aFRR standard product (i.e. the definitions to which the service provided by market participants must meet), the processes related to the submission, activation, and clarification of offers, and the roadmap for joining the pan-European aFRR market platform, i.e. the PICASSO platform.
The package of materials for public...