Skip to main content
Accessibility
Line height
Text size
Contrast
Other options
E-services
  • Client portal
  • Elering Live
  • For landowners and network service customers
  • For those connecting to the main grid
  • Renewable Energy Information System
EST
Elering logo
Menu Elering logo

Päis Megamenüü

  • Services
    • Connecting to the electricity network
      • Network development and fixed connection fee
      • Connection capacity application e-Gridmap
      • Application and contract
      • Preliminary feasibility study and procurement documents
      • Connection fees
      • Connection point construction and energizing
      • Generating unit testing
      • Limiting production-oriented capacity
      • Connection conditions and legislation
      • Legislation
      • Approval
      • Underutilisation fee for connecting contracts
    • Connecting to the gas network
      • Application and contract
      • Connection fee
      • Technical possibilities for connecting
      • Establishment of grid connection
      • Connection conditions and legislation
    • Electricity network service
      • Price list and standard terms and conditions
      • Quality
      • Reconstruction of the network
      • Network service portal
      • Underutilisation fee in case of permanent network contract
    • Gas network service
      • Strategic reserve tax
    • Electricity balancing service
      • Balance agreement
      • Balancing service fees
      • Regulations and legislation
      • Balancing service
      • Aggregation service
    • Gas balancing service
      • Gas balance administration
      • Gas balance agreement
    E-Services
    • Client portal Measurement point data and measurement data
    • For landowners and for network service customers Toleration fee, network service customer invoices and contracts
    • For those connecting to the transmission network Connection to the electricity grid at 110 kV and 330 kV voltage levels
  • Infrastructure
    • Elering’s infrastructure
      • Electricity transmission network
      • Gas transmission system
      • Infrastructure-related impact
    • Protection zones
      • Permit to operate in a protection zone
      • Approval of a permit for special cargo
      • Protection zone maintenance
      • Protection zone for an electrical installation
      • Protection zone for a gas installation
      • Approvals
    • Land use
      • Planning rights
      • Toleration fee
    • Major projects
      • Synchronisation with Continental Europe
      • European Union Recovery and Resilience Facility projects
      • EstLink 3
      • The fourth Estonian-Latvian power connection
      • Nordic-Baltic Hydrogen Corridor
    • Completed major projects
      • Third Estonian-Latvian connection
      • Tartu-Viljandi-Sindi line
      • Emergency reserve plants
    • Design towers
      • Design tower Soorebane
      • Design tower Sookurg
      • Design tower Sookureke
    • Electrical installation safety
      • Electrical installation safety requirements
      • Electrical safety qualification
      • Safety notice
    • Gas installation safety
    E-Services
    • For landowners and for network service customers Toleration fee, network service customer invoices and contracts
    • For those connecting to the transmission network Connection to the electricity grid at 110 kV and 330 kV voltage levels
  • Energy system
    • Security of electricity supply
      • Measures to ensure security of supply
      • Security of supply reports and conferences
    • Security of gas supply
      • Ensuring security of gas supply in an emergency
    • Power system
      • System operation
      • Control centre
      • Electricity consumption and generation
      • Regional coordination
    • Gas system
      • Quality of network gas
    • Energy market
      • Cross-border electricity trade
      • Cross-border gas trade
      • Congestion income
      • Power exchange
      • Gas exchange
      • Energy and capacity market for balancing services
      • Electricity data exchange
      • Gas data exchange
      • Market supervision under the REMIT Regulation
      • Electricity Market Handbook
      • Gas Market Handbook
    • Development plans
      • Development plan of the electricity transmission system
      • Development plan of the gas transmission system
    • Public consultations
      • Closed consultations
      • Open consultations
  • Renewable energy
    • Renewable energy
    • Grants
      • Biomethane aid
      • Investment aid
      • Renewable energy charge
      • Grants FAQ
    • Renewable electricity support
      • Terms and conditions of support
      • Profitability assessment
      • Registration of a production device
      • Applying for support
      • Direct line producers
      • Important deadlines
      • Principles for projects over 1 MW
    • Reverse auction
    • Origin of energy
      • Proof of origin portal for electricity
      • Residual mix
      • Gaseous fuels
      • Transport statistics
    • Guarantees of origin
      • Guarantees of origin for electricity
      • Guarantees of origin for biomethane
      • Guarantees of origin FAQ
    • Production and forecast
      • Concepts
    • Renewable energy information systems
      • Authorisation and user roles
    E-Services
    • Renewable energy information system Grants and guarantees of origin

Lihtmenüü

  • About Elering
  • Work and career
  • News
  • Contacts

Current news

See all
News 11. September 2025
Elering updates the e-Gridmap connection application

Elering has updated its web-based map application e-Gridmap, which helps

Read more

Share

Copy

News 08. September 2025
Trading on the Baltic and Finnish gas markets to move to the European Energy Exchange platform

Starting from 9 September 2025, trading on the Baltic and Finnish gas

Read more

Share

Copy

News 01. September 2025
EstLink 1 Out of Service Due to Fault at Finnish Converter Station

The Estonia–Finland electricity interconnection EstLink 1 is out of service

Read more

Share

Copy

News 29. August 2025
Thirteen Bids Submitted for Long-Term Reserves Procurement, Totaling 677 Megawatts

By the deadline on Thursday, Elering received 13 bids totaling 677

Read more

Share

Copy

Blog

See all
No results found

General Contact

Information available on weekdays from 8:00 AM to 4:30 PM

+372 7151 222 or Write us

High-voltage power line and gas transmission network emergencies

Please contact us only regarding transmission network issues (we answer this phone 24/7)

60 56 825 or Write us

Corruption suspicion reporting line

In case of fraud or corruption suspicions, anonymous reports can be submitted.

6007 077 or Write us
Elering Ltd.
  • Kadaka Road 42, 12915, Tallinn
  • +372 7151 222

Weekdays from 8:00 AM to 4:30 PM

  • E-mail: [email protected]
  • Customer support: [email protected]
  • Billing: [email protected]
  • Customer Portal
  • Network customers
  • For landowners
  • Grid connection
FAQ

FAQ

Find answers to frequently asked questions

  • Processing of personal data
  • Cookies
  • Copyright © Elering 2025
  • Register code: 11022625/VAT number: EE100889639
  • EIC: 10X1001A1001A39W/ ACER CEREMP: A00026797.EE
elering logo

What are you looking for?